Title: THE TRUSSMASTER


1
(No Transcript)
2
The Trussmaster
  • Removing the Operator the from Hazards of
    Hand-Held Bolters

3
Location
  • Springvale
  • Located at Lithgow, NSW
  • Longwall operation with 3 development units
  • Mining Lithgow seam - WEAK STRATA

Lithgow Sydney Wollongong Nowra
4
Springvale History
  • Difficult Mining Conditions
  • Roof Falls
  • High Horizontal Stress
  • Ground Control Process
  • Long pre-tensioned support on development
  • Contract Support Crews
  • Results
  • Less Re-work
  • Develop Longwall through difficult conditions

5
Springvale Secondary Support
  • Involves installation of 8m cable bolts and
    trusses, prior to Longwall extraction
  • Installed from restricted space
  • requires small/mobile bolting equipment
  • Installation process
  • Drill a 8m long, 55mm diameter hole into roof
  • Insert cable bolt in hole
  • Insert grout tubes, and pack hole
  • Grout hole
  • Tension bolt

6
Conventional Hand-Held Bolters
  • The Problems Drilling
  • Close Proximity
  • Fines/debris/water
  • Services underfoot
  • Balancing heavy machine
  • Rigid handle
  • Exposed to
  • vibration
  • whip
  • jamming

7
Conventional Hand-Held Bolters
  • The Problems
  • Manual Handling
  • Cable insertion
  • Relocating

8
Conventional Bolters
  • Safety Statistics 1999-2003
  • Fatigue
  • always tired
  • Employee Turnover
  • Eliminate the key risks
  • to improve safety issues with this type of work

9
The Trussmaster
  • The solution
  • Remote control
  • Nil exposure to
  • fines/water
  • Vibration
  • Whip/jamming
  • Self supporting
  • No strain on operator

10
The Trussmaster
  • The solution
  • Remote control
  • Cable Insertion
  • Less exertion
  • On Wheels
  • Easy to move

11
Added Benefits
  • 2000 bolts installed with Trussmaster at
    Springvale with NIL incidents/injuries
  • Groundcon Operators at Springvale developed
    ergonomics on the Trussmaster
  • Operators prefer to use the Trussmaster as it is
    less physically demanding on them
  • Modular more reliable, easier to maintain
  • Installation rates 40 better with Trussmaster

12
The Trussmaster
  • WIN-WIN!
  • Operators prefer the Trussmaster

13
(No Transcript)