Title: Green Boilers: Energy and Carbon Savings


1
Green BoilersEnergy and Carbon Savings
  • International Facility
  • Management Association
  • September 15, 2009

2
Today's Discussion
  • Introduction to M2G Boiler Technology
  • What it is
  • How it Works
  • U.S. Installations and Pilot Results

3
What is M2G Technology?
4
M2G Technology
  • Microprocessor based technology
  • Controls boiler cycling
  • Reduces waste heat while retaining building
    utility

5
M2G Technology
  • A device that matches boiler operation with true
    building demand

6
M2G Technology
  • Has its own instrumentation
  • Monitors building thermodynamics through
    measurement and analysis of boiler water
    temperatures.

7
M2G Technology
  • A device that works at the boiler controller
    level
  • Protective of boilers with respect to thermal
    stressing loading

8
M2G Technology
  • Easily installed
  • Attaches to the boiler
  • All wiring is local to the specific boiler.

9
M2G Technology
  • Compatible with existing controls and operations
  • Dynamic and self adjusting
  • Flexibly adapts to
  • temperature resets,
  • scheduling,
  • seasonal,
  • operator,
  • and BMS operating changes.

10
M2G Technology
  • Failsafe design

11
M2G Technology
  • Low cost with high return on investment

12
M2G Technology
  • Reduction in energy use and carbon emissions

Carbon Emissions
13
How M2G Technology Works
14
Heat loss to flue gas, 18
Heat transferred to system, 80
Radiated heat loss, 2
Heat from fuel 100
15
Typical Hot Water Boiler Operation
  • Boilers operate at a relatively high temperature,
    generally 160F to 180F
  • Boiler operating temperature is not directly tied
    to building demand, boilers maintain temperature
    even when there is no building demand
  • Once the target temperature is reached the boiler
    allows a variance before it re-fires (hysteresis)
  • This happens over and over again, all day, day
    after day
  • This can be extremely energy inefficient

16
M2G response to loading demand (boiler return
water temperatures - by minute)
17
Lagan Valley Hospital
  • Comparison of two days with the same ambient
    temperature.
  • Total burner runtime is reduced by 30.
  • Lead boiler fires are reduced by 20.
  • Lag boiler fires are reduced by 27.
  • Overall energy and carbon emissions were reduced
    by 30.

18
Review
  • We sit below the BMS
  • We work with systems with or without a BMS
  • The M2G is not a time delay system
  • We do not simply reset the thermostat
  • We do not turn off the system for a fixed period
    at a time
  • We allow a dynamic exchange with the boiler
  • Through sensors on the flow and return
  • We work at the boiler control level

19
Compliant with Boiler Industry Codes and Standards
  • Boiler Industry Standards and Requirements
    Compatible
  • Boiler Controls must be independent systems
  • Boiler sub-systems require hardware interlocks
  • Boiler controllers require independent safety
    circuits
  • Boilers require Flame Safeguard Controls
  • Greffens M2G wires directly into the primary
    control circuit
  • Has been designed to be compliant with industry
    safety standards
  • Backward Compatible, works on installed boilers

20
Pilot Methodology
  • Normal pilot period 30 days
  • Side by Side Comparison 1 day on, 1 day off
  • Independent pilot measurement and control
    hardware
  • Dent Loggers (Time of Use)
  • Eagle/Signal 24 hour toggle timer
  • Temperature Monitoring (internal and outside)
  • In-situ testing with all controls fully operative
  • Test status is not indicated to operations

21
M2G Installations - USA
22
Atria West Los Angeles, California Jones Lang
LaSalle
23
The M2G Fitted
24
(No Transcript)
25
The Results
26
Nissan Distribution Center Aurora,
Illinois Firings 41 Reduction Energy
Savings 14.7 Reduction Payback Period 9
Months Interior Temperature Same
27
(No Transcript)
28
Cabrini High School Allen Park,
Michigan Firings 47 Reduction Energy
Savings 11 Reduction Payback Period 14
Months Interior Temperature Same
29
(No Transcript)
30
M2G Operation Has No Effect On Comfort Level
31
Plaza Towers Atlanta, Georgia Firings 46
Reduction Energy Savings 22
Reduction Payback Period 6 Months Interior
Temperature Same
32
(No Transcript)
33
Sysco Foods Canton, Michigan Firings 16
Reduction Energy Savings 17
Reduction Payback Period 6 Months Interior
Temperature No Impact
34
Summary
  • Controlling cycling behavior can provide
    significant savings
  • Greffen offers a green solution that addresses
    customers energy and carbon emissions challenges
  • What other product offers this level of savings,
    price-point and payback and installs in two
    hours?

35
Q/A
36