Know Software Testing Life Cycle (STLC) a little better - PowerPoint PPT Presentation

About This Presentation
Title:

Know Software Testing Life Cycle (STLC) a little better

Description:

The STLC is not an isolated process but rather a set of activities to ensure that the software quality objectives are maintained during the testing process. Read our full blog post for more details. – PowerPoint PPT presentation

Number of Views:4
Slides: 8
Provided by: ibrinfotech
Tags:

less

Transcript and Presenter's Notes

Title: Know Software Testing Life Cycle (STLC) a little better


1
Know Software Testing Life Cycle (STLC) a little
better
  • https//www.ibrinfotech.com/

2
The testing trend and competency are shifting.
More technical and process-oriented testers are
now required. Testing is no longer confined to
discovering flaws it now has a broader scope and
is necessary right from the start of a project,
even before the requirements are finalized. The
Software Testing Life Cycle (STLC) is a set of
activities that are carried out during the
testing process to guarantee that software
quality objectives are satisfied. STLC process
has two parts one isa verification and another is
validation. Software testing is not merely a
single/isolated process, contrary to popular
notion. It comprises a set of operations that are
carried out in a methodical manner to assist with
the certification of your software product.
Software Testing Life Cycle is commonly known as
STLC. The Software Testing Life Cycle is a set
or group of operations performed by the tester in
order to ensure that the software application
satisfies client requirements and is bug-free. A
series of actions are conducted in a systematic
manner to assist you to confirm the product
item.A reputable quality assurance service
provider can help your business keep the software
current and tested on a regular basis. Lets have
a look at the role and phases of the software
testing life cycle (STLC).
3
  • Phases of the STLC
  • Every Software Testing Life Cycle Model (STLC
    Model) has the following six majorsoftware
    testing phases
  • Requirement Analysis
  • The QA team analyses the business requirements
    specification (BRS) document to identify the
    needs from a testing standpoint during the
    requirements analysis phase. This may necessitate
    the team to communicate with stakeholders to gain
    a better understanding of the requirements. If
    certain requirements are not tested, a mitigation
    strategy can be written instead.
  • Test Planning
  • In the STLC, Test Planning is the phase in which
    a Senior QA Manager establishes the test plan
    strategy, as well as the projects effort and
    cost estimations. The resources, test
    environment, test constraints, and testing
    timetable are in the same step as the Test Plan
    is created and finalized.

4
  • Test case development
  • Following the preparation of the test strategy,
    the Test Case Development Phase covers the
    design, checking, and adjusting of experiments
    and test contents. The Test information is first
    differentiated, then made and discussed, and then
    altered based on the preconditions. The QA group
    then begins improving the interaction of
    experiments for individual units.
  • Test Environment setup
  • The Test Case Development Phase follows the
    completion of the test strategy and includes the
    design, verification, and revision of test cases
    and test scripts. The Test data is first
    identified, then prepared, examined, and modified
    in accordance with the preconditions. The QA team
    then begins the process of creating test cases
    for specific units.

5
  • Test Execution
  • Testers do the test execution step, which
    involves testing the program using the test plans
    and test cases that have been created. Executing
    test scripts, maintaining test scripts, and
    reporting defects are all part of the process.
    Bugs are reported to the developing team for
    rectification, and theirretesting is done.
  • Test Cycle closure
  • This is the final step of the Software Testing
    Life Cycle, and it entails a number of tasks such
    as creating test completion documents, gathering
    test completion matrices, and analyzing test
    results. Testing colleagues get together to
    discuss, inspect, and dismantle testing antiques
    in order to identify future systems that must be
    implemented, walking through activities from the
    current examination cycle. The idea is to get rid
    of measurement bottlenecks in future test cycles.

6
  • The Bottom Line
  • The sequence of changes from one form to another
    is referred to as a lifecycle in simple terms.
    These alterations can occur in both tangible and
    immaterial objects. From conception through
    retirement/death, every entity has a lifecycle.
    Software, in a similar way, is a separate entity.
    Testing, like software development, has a set of
    stages that must be followed in a specific order.
    If you want to learn more and get started on your
    companys digital journey, contact IBR Infotech.

7
Thank You
  • Phone - 15035757893
  • Email - contact_at_ibrinfotech.com
  • Website - https//www.ibrinfotech.com/
Write a Comment
User Comments (0)
About PowerShow.com