Title: The Benefits of BIM for Formwork
1The Benefits of
BIM for Formwork
2The Formwork market is projected to hit 6.37
billion by 2027 at a CAGR of 2.3
3Who benefits from BIM-based formwork?
4Why CAD-based tools often pose challenges?
Lack of 3D visualization
Absence of process transparency and clarity
Higher onsite rework, material waste, and time
overages
Clashes between formwork components with 2D
drawings
Design ambiguities, greater RFIs during
construction, and task delays
Absence or inadequate collaboration
Absence of real-time data in CAD blocks
Improper use of formwork and project delays
Inaccurate or erroneous formwork proposals
Manual intervention and absence of automation
5- Advantages of
- BIM-based Formwork Modeling
6Provide greater clarity and transparency
- The Need
- A high-quality concrete casting
- BIM-based 3D visualization ensures
- Higher clarity and transparency through the
entire formwork process - Interdisciplinary coordination with
bi-directional information exchange - Accurate formwork modules-layouts before actual
construction starts
7Resolve clashes in the preconstruction phase
- The Need
- Reduce collisions between various formwork members
- BIM-based interdisciplinary clash detection and
resolution ensures - Preemptive interference-detection and resolution
between various formwork members through clash
detection - Reduced rework and material waste to avoid
project delays and save building costs - Proper sequential planning of formwork with
respect to each concrete casting
8Better collaboration with the project team
- The Need
- Understand the design with greater clarity and
relevance
- BIM enables higher collaboration with multiple
project teams for - Quick and accurate formwork planning and layout
- Effective and efficient handling of change
requests or RFIs - Faster identification and task assignment with
greater clarity - Enhanced visualization and simulation for
improved onsite operations
9Produce high-quality concrete cast elements
- The Need
- Garner greater accuracy and quality of concrete
elements
- Use of 3D BIM in formwork design ensures
- Quick generation of formwork parts through ERP
integration. - Enhanced concrete pour cycles with BOQs and BOMs
and evaluate multiple use of formwork and its
prototypes. - Efficient planning and alignment with real-time
data and comprehensive construction sequencing.
10Savings of cost time with BIM-based formwork
modeling
- The Need
- Savings of project cost and timely completion
with short TAT
- BIM adoption for formwork in comparison to
conventional methods results in - Coordinated formwork with concrete casting leads
to seamless construction - Accurate material BOQs and BOMs lead to reduced
material wastage and savings of project cost - Proper planning with BIM-based tools leads to
reduction of project hiccups and ensures timely
completion with short TAT
11Formwork construction for commercial office saves
20 time
Formwork production companies can save 20 in
production schedules, garner 100 output quality,
and achieve accurate and seamless project
documentation.
Read detailed story at /
https//www.hitechcaddservices.com/case-studies/fo
rmwork-construction-on-bim-360-for-commercial-offi
ce-netherland/
12Optimize your formwork planning and layout with
accurate and high-quality formwork designs.
Get in touch with our BIM team to get formwork
modeling solutions
www.hitechcaddservices.com info_at_hitechcaddservices
.com