Title: BIM Coordination Convention From MEP Viewpoint
1BIM Coordination Convention From
MEP Viewpoint
www.buildinginformationmodelling.net
2BIM Services
- Building Information Modelling delivers high
quality out performing designs in Electrical BIM
services. We collectively work as a team and we
believe in delivering end to end solutions in
Electrical Designs and Drawings. - Building Information Modelling delivers high end
2D designs and structural 2D drawings for
Structural Building Information Modeling
services. We at Building Information Modelling
have the team of proficient architects and
engineer who provides 2D designs and 2D drawings
in structure as per our clients requirements. We
deliver out performing design and drafting
services. - We offer Lighting BIM services for all our
pioneer clients that are natives of countries
like USA, UK, Australia, Europe, Canada and
India. Our services have spread its wings not
only in these countries but many other countries.
We have the team of designers, drafters,
architects and engineers that have worked on many
projects and add value to many building projects,
government projects, industries projects and
manufacturing projects.
3MEP MEP stands for the Mechanical, Electrical
and Plumbing discipline of construction. The
Mechanical part includes FireFighting system and
HVAC (Heating, Ventilation, and Air
Conditioning). The Electrical part covers power
supply and lighting system. The Plumbing part
includes water supply and drainage
management. BIM BIM is the acronym for Building
Information Modeling. It refers to a process of
creating working models (3D, 4D or 5D) to design,
construct and manage the building information.
44
4D Modeling
4D BIM Modeling is a segment of Building
Information Modeling that focuses on scheduling.
Here, the units of 3D CAD is attached to time or
schedule-related information. The involvement of
4D BIM enables the participant in construction to
contemplate the duration and progress of various
event in the construction process. The 4D BIM
approach improves the project management and the
pace of delivery.
5(No Transcript)
6(No Transcript)
7BIM Coordination
What is BIM Coordination ? To ensure all the
aspects of MEP works in coordination with each
other, there arises a need of determining clashes
between them. Hence, BIM Coordination comes into
play. BIM Coordination refers to a process of
comparing various models so as to find out any
clashes or conflicts taking place among various
MEP elements on the field. Role of Coordination
Drawings In order to maintain coordination
between different aspects of MEP, we require
special diagrams known as coordination drawings.
Coordination drawings are produced by contractors
that can be reproduced as per requirements. These
MEP Coordination Drawings showcase the
installation of components, materials, and
products within all the mechanical and electrical
spaces.
8Why BIM Coordination ? Benefits of using BIM
Coordination for MEP are as follows Avoid
field conflicts prior to installation process
Provide an early insight into the project
through visualization Accuracy in
designing Increase in productivity
Reduction in cost Timely delivery of the
project Accurate decision making
9(No Transcript)
10(No Transcript)
11(No Transcript)
12How to Apply BIM Coordination in MEP Components
The process of coordinating MEP components is a
tough job and it requires a higher rate of
accuracy and precision as even a slight mistake
may result in a substantial loss. The process
involves following steps Analysis Phase In
this phase, the architects and modelers undergo
rigorous analysis of the MEP designs and
drawings. They collectively come down to a
decision on how BIM coordination models will be
made. Creation Phase Here, coordination
models are created using software like Revit and
AutoCAD. This will ensure integration of all the
MEP elements in the model. This means the
mechanical, electrical and plumbing elements are
working in synchronization with each other.
Detection Phase This phase involves preparing
coordination drawings so as to detect the
interference amongst the MEP elements. These
include 3D and 4D coordinated BIM models to
detect the clashes and fix the errors.
Modification Phase It involves the creation of
as-built drawings. As Built Drawings provide
information on site based changes and the
modifications that are to be made in 3D models.
13(No Transcript)
14Global Presence
15Software Expertise
16Contact Us
Building Information Modelling.net
Address 413, Patel Avenue,
Opp. Grand Bhagwati, S G Road, Thaltej,
Ahmedabad, Gujarat, INDIA. Call 079
40031887 Email info_at_buildinginformationmodelli
ng.net URL www.buildinginformationmodelling.
net/
17THANKS!
Any Questions? You can find me at _at_bimdesigner
Contact Us