Title: Durability Years will be Shortened of Asphalt Pavement
1Durability Years will be Shortened of Asphalt
Pavement
Next
2 What I discuss in this section
- Asphalt paving work process 1 Roadbed
- Asphalt paving work process 2 Underground roadbed
- Asphalt paving work process 3 Upper layer roadbed
- Asphalt paving work process 4 stratum
- Asphalt paving work process 5 Surface layer
- My Company Introduction
- Our Services
- How We Can Be Found?
Next
Previous
3MEANING OF BASIC ASPHALT PAVEMENT PROCEDURE AND
PROCESS
- When you want to pave your driveway or parking
lot you have to follow these necessary steps.
Asphalt pavement construction has roughly divided
into five stages, Roadbed, Underlying Road,
Upper Road, Substrate and Surface from the
bottom. - Here, l will explain the contents of each process
together with the effects obtained by that
process.
Next
Previous
4Asphalt paving work process 1 Roadbed
- It is the lowest layer of pavement, laying the
part called roadbed. - Since the roadbed is located at a depth of about
1 meter (for commercial use and it increases or
decreases according to the use) from the road
surface, I start with digging work to dig into
that depth. Now you have need to lay sand in the
ditches that have been dug and build a foundation
for paving. Since the load on the pavement
surface will eventually be received on this road
floor, if the road floor is weak, problems such
as ground subsidence may occur. - If the ground is too vulnerable, we may reinforce
the ground by burying reinforcing bars
Next
Previous
5Asphalt paving work process 2 Underground roadbed
- Roadbed is a part that supports the midpoint of
pavement, and it has the role of distributing
loads and shocks to upper and lower layers,
respectively. - You will have to lay down crushed stones and
gravel on the roadbed where we have finished
laying. - It is said that many of the crushed stones used
for the lower roadbed are relatively large in
order to secure the load firmly.
Next
Previous
6Asphalt paving work process 3 Upper layer roadbed
- Here will also need to lay down crushed stone in
the upper layer of the roadbed as well. The upper
roadbed has the role of uniformly receiving the
load transmitted from the base just above and
distributing it to the lower layer, so many
crushed stones are relatively small. In order to
reduce the loss of load distribution as much as
possible, crushed stone with the uniform size is
used. After crushing the crushed stone, press it
with a road roller, etc. - By firmly compressing to the prescribed density,
you can get a solid foundation.
Next
Previous
7Asphalt paving work process 4 stratum
- It is a layer laid on the roadbed, the material
from here becomes asphalt. Because the base layer
is a layer that becomes a cushion between the
upper roadbed and the upper surface layer, the
asphalt used will be rich in flexibility. - Although it is being done, the top road surface
of the crushed stone is covered with soft
asphalt, and more working to increase the
adhesion to the surface layer.
Next
Previous
8Asphalt paving work process 5 Surface layer
- The uppermost part of the pavement, the layer of
asphalt that you usually see is called the
surface layer. - Asphalt which emphasizes durability rather than
flexibility is used for the surface layer
supported by the base layer. - It will distribute the load and impact on the
road surface to the base layer and keep the road
surface flat so that user can comfortably pass
through. - The asphalt paving companies also do the work
called remaining bulk which tilts towards
drainage so that water does not accumulate on the
road surface.
Next
Previous
9- After the overgrowth has been completed, perform
a rolling operation that treads asphalt spread
as a finish with a roller or the like. The
asphalt just laid is soft and fluffy, but it will
become a hardened road surface by rolling
pressure. - In that case, care is necessary for temperature
management. Asphalt softens at high temperature
and solidifies as it cools, but it will cause
distortion and cracking if it cools down during
rolling. - In order to finish on a beautiful paved surface,
it is necessary to keep rolling while maintaining
sufficient temperature. - Special tools and materials used in the
construction of asphalt pavement work. Paving
work of asphalt is done by dedicated vehicle,
heavy machine, and equipment. - Read the topic introduction of tools used for
construction together with materials.
Next
Previous
10Standard Paving Inc.From roadway to driveway
WHO ARE WE
Next
Previous
11 Our Introduction
- Standard Paving Inc. is one of the most famous
pavers in Virginia. We have been providing our
services for last 3 decades. We are experts in
expedited repair as well as renewal of your of
current parking lots. We have done many projects
based on replacing parking lots and to repair
damaged roads. We have also made a number of
private roadways and commercial roads.
Next
Previous
12Our Services
- Commercial Roads
- Parking Lots
- Parking Lots Repair
- Private Roadway
- Striping
Next
Previous
13Why Choose us ?
- Professional
- Free Estimate
- Employment
- Asphalt Paving
- Tar and Chip
Previous
Next
14Website www.standardpavinginc.comPhone Number
844 266 7283physical address 8803
Sudley Road, Suite 206 Manassas, VA , USA
Previous