What I discuss in this section 1. Asphalt paving work process 1 Roadbed 2. Asphalt paving work process 2 Underground roadbed 3. Asphalt paving work process 3 Upper layer roadbed 4. Asphalt paving work process 4 stratum 5. Asphalt paving work process 5 Surface layer 6. My Company Introduction – PowerPoint PPT presentation

Number of Views:64
Slides: 15
Provided by: jakenight
Category: Other

less

Transcript and Presenter's Notes

Title: Durability Years will be Shortened of Asphalt Pavement


1
Durability Years will be Shortened of Asphalt
Pavement
Next
2
What I discuss in this section
  1. Asphalt paving work process 1 Roadbed
  2. Asphalt paving work process 2 Underground roadbed
  3. Asphalt paving work process 3 Upper layer roadbed
  4. Asphalt paving work process 4 stratum
  5. Asphalt paving work process 5 Surface layer
  6. My Company Introduction
  7. Our Services
  8. How We Can Be Found?

Next
Previous
3
MEANING OF BASIC ASPHALT PAVEMENT PROCEDURE AND
PROCESS
  • When you want to pave your driveway or parking
    lot you have to follow these necessary steps.
    Asphalt pavement construction has roughly divided
    into five stages, Roadbed, Underlying Road,
    Upper Road, Substrate and Surface from the
    bottom.
  • Here, l will explain the contents of each process
    together with the effects obtained by that
    process.

Next
Previous
4
Asphalt paving work process 1 Roadbed
  • It is the lowest layer of pavement, laying the
    part called roadbed.
  • Since the roadbed is located at a depth of about
    1 meter (for commercial use and it increases or
    decreases according to the use) from the road
    surface, I start with digging work to dig into
    that depth. Now you have need to lay sand in the
    ditches that have been dug and build a foundation
    for paving. Since the load on the pavement
    surface will eventually be received on this road
    floor, if the road floor is weak, problems such
    as ground subsidence may occur.
  • If the ground is too vulnerable, we may reinforce
    the ground by burying reinforcing bars

Next
Previous
5
Asphalt paving work process 2 Underground roadbed
  • Roadbed is a part that supports the midpoint of
    pavement, and it has the role of distributing
    loads and shocks to upper and lower layers,
    respectively.
  • You will have to lay down crushed stones and
    gravel on the roadbed where we have finished
    laying.
  • It is said that many of the crushed stones used
    for the lower roadbed are relatively large in
    order to secure the load firmly.

Next
Previous
6
Asphalt paving work process 3 Upper layer roadbed
  • Here will also need to lay down crushed stone in
    the upper layer of the roadbed as well. The upper
    roadbed has the role of uniformly receiving the
    load transmitted from the base just above and
    distributing it to the lower layer, so many
    crushed stones are relatively small. In order to
    reduce the loss of load distribution as much as
    possible, crushed stone with the uniform size is
    used. After crushing the crushed stone, press it
    with a road roller, etc.
  • By firmly compressing to the prescribed density,
    you can get a solid foundation.

Next
Previous
7
Asphalt paving work process 4 stratum
  • It is a layer laid on the roadbed, the material
    from here becomes asphalt. Because the base layer
    is a layer that becomes a cushion between the
    upper roadbed and the upper surface layer, the
    asphalt used will be rich in flexibility.
  • Although it is being done, the top road surface
    of the crushed stone is covered with soft
    asphalt, and more working to increase the
    adhesion to the surface layer.

Next
Previous
8
Asphalt paving work process 5 Surface layer
  • The uppermost part of the pavement, the layer of
    asphalt that you usually see is called the
    surface layer.
  • Asphalt which emphasizes durability rather than
    flexibility is used for the surface layer
    supported by the base layer.
  • It will distribute the load and impact on the
    road surface to the base layer and keep the road
    surface flat so that user can comfortably pass
    through.
  • The asphalt paving companies also do the work
    called remaining bulk which tilts towards
    drainage so that water does not accumulate on the
    road surface.

Next
Previous
9
  • After the overgrowth has been completed, perform
    a rolling operation that treads asphalt spread
    as a finish with a roller or the like. The
    asphalt just laid is soft and fluffy, but it will
    become a hardened road surface by rolling
    pressure.
  • In that case, care is necessary for temperature
    management. Asphalt softens at high temperature
    and solidifies as it cools, but it will cause
    distortion and cracking if it cools down during
    rolling.
  • In order to finish on a beautiful paved surface,
    it is necessary to keep rolling while maintaining
    sufficient temperature.
  • Special tools and materials used in the
    construction of asphalt pavement work. Paving
    work of asphalt is done by dedicated vehicle,
    heavy machine, and equipment.
  • Read the topic introduction of tools used for
    construction together with materials.

Next
Previous
10
Standard Paving Inc.From roadway to driveway
WHO ARE WE
Next
Previous
11
Our Introduction
  • Standard Paving Inc. is one of the most famous
    pavers in Virginia. We have been providing our
    services for last 3 decades. We are experts in
    expedited repair as well as renewal of your of
    current parking lots. We have done many projects
    based on replacing parking lots and to repair
    damaged roads. We have also made a number of
    private roadways and commercial roads.

Next
Previous
12
Our Services
  • Commercial Roads
  • Parking Lots
  • Parking Lots Repair
  • Private Roadway
  • Striping

Next
Previous
13
Why Choose us ?
  • Professional
  • Free Estimate
  • Employment
  • Asphalt Paving
  • Tar and Chip

Previous
Next
14
Website www.standardpavinginc.comPhone Number
844 266 7283physical address 8803
Sudley Road, Suite 206 Manassas, VA , USA
  • How we can be found?

Previous
Write a Comment
User Comments (0)
About PowerShow.com