/ How to perform a CPM Schedule Delay
Analysis? Construction projects are huge and
require the management of a number of things. But
one of the most important things that need
proper attention in the construction project is
the delays caused in the project.
Whenever there is any delay in the construction
project and any claim for that delay has been
issued, then it becomes important to perform CPM
Schedule delay analysis. It helps in determining
the cause of delay in construction projects as
well as the strategies that should follow next.
Thanks to this CPM schedule delay analysis, it is
decided whether to extend the time of the
project or it should be resolved by monetary
efforts. In short, to conclude on the matter, we
need a forensic scheduling expert to conduct the
delay analysis and to reach an agreement between
the contractor and the project owner. Now, after
understanding the importance of CPM schedule
delay analysis, let us quickly have a look at
how it can be performed so as to get the desired
result. How to perform the delay analysis? One
of the simplest ways to carry the delay analysis
is known as additive technique in which you add
up all the delays to the schedule so as to find
the impact of those delays on the project. This
whole idea gives advance knowledge about the
possible delays and thus the constructor and the
project owner can look out for ways to avoid the
delays.
2- For More Details -
- https//www.complianceprime.com/
- Now, it is important to perform the CPM schedule
delay analysis at the right time so as to get
the desired response. Interested in knowing when
the delay analysis should be performed? Here are
some of the situations - Before starting the project to get an idea of the
possible delays that can happen - If a proper delay analysis has not been done
before - After a delay has occurred to reduce its impact
and also to find its cause - Steps to follow to perform the schedule analysis
- Are you aware of the steps in which the delay
schedule analysis be done? If you are in need and
are looking for the right steps, then you have
come to the right place. - Here are some of the steps which should be
followed in a proper manner so that the schedule
analysis can provide the desired results with
proper accuracy - Start with the basic baseline schedule for your
project - Identify and analyze all the critical path of the
projects along with keeping the check on the
finish date of the project - Analysis of a delay event and insert it in your
schedule which can reflect the delayed event
properly and then link it with the relationship
logic - Carry the schedule analysis and then examine all
the impacts that the inserted delay activity
would have on the overall project and its related
activities - Make sure that you insert all the possible delays
one at a time to examine their impact on the
project and then to look for the strategies that
can be used - After following these steps for CPM schedule
delay analysis, it becomes really convenient to
get an idea about the possible delays that can
happen in the project along with the ways in
which they can be avoided.