Title: Steps in construction of residential building


1
STEPS IN CONSTRUCTION OF RESIDENTIAL BUILDING
2
  • Construction of residential building required
    following paper work before the start of actual
    construction. After the completion of
    documentation work, the actual construction on
    plot begins. 

3
EARTH WORK
  • Generally excavation is carried out for the
    construction of wall foundations. Excavation
    should be carried out as per the drawings defined
    lengths widths. After excavation.

4
CONCRETE WORK IN FOUNDATION
  • It is very necessary to check the levels of
    foundation before concrete work. There are
    patches where excavated depth slightly exceeds
    and vice versa. Level the foundation base to same
    level. 

5
DAMP PROOF COARSE
  • To protect walls from moisture, a layer of damp
    proof coarse material is laid down at floor
    level. Thickness of this concrete layer is 0f 1
    inch.

6
MASONRY WORK
  • Masonry work is carried out with cement mortar.
    Cement mortar is a mixture of cement sand.
    Ratio of cement mortar varies from 14 to 16.
    Here (16) mean, 1 part cement and 6 parts of
    sand. 

7
LINTEL
  • Masonry work of buildings is carried out in one
    go till roof. Openings for windows doors are
    left during masonry works. Reinforced cement
    concrete beams are laid down on the top of
    openings. 

8
ROOFING
  • Roof slab of building is poured after completion
    of masonry works. Now a days, roofing is of
    reinforced cement concrete slab. Slab thickness
    reinforcement details should be according to
    approved drawings.

9
PLASTERING POINTING
  • form work is removed after 14 days of slab
    pouring. Now plaster work begins. Mortar for
    plaster work is generally of 13 or 14 is used.

10
DOORS WINDOWS
  • Traditionally, doors and windows of woods are
    used. But, steel aluminum is also not a bad
    choice. In case of wooden doors windows, frames
    are fixed in walls during masonry work.

11
Building Construction Companies in Dubai
  • AL SAHEL CONTRACTING COMPANY LLC
  • Dubai, UAE.
  • P.O.Box 3815,
  • Phone 971 4 2857324
  • FAX 971 4 2851609
  • Email info_at_alsahelcon.com
Write a Comment
User Comments (0)
About PowerShow.com