Title: Small Steps Big Savings!


1
SMALL STEPS, BIG SAVINGS!
2
Temporary works equipment can account anywhere
between 2-10 of the total construction costs
(depending on the structure) and while
contractors negotiate hard for the best prices
when buying, after the equipment gets to site, it
rarely gets the care it deserves.
3
  • With intense competition across the construction
    industry squeezing contractors margins, it would
    seem obvious that savings could be made through
    reducing or eliminating losses from lost or
    damaged equipment. High costs due to lost and
    damaged equipment are quite common, but these
    losses can be reduced dramatically by taking a
    little more care and following some simple steps

4
Safe Storage
  • Ensure equipment is stored in a secure safe place
    when not in use and keep all formwork equipment
    together if possible.
  • It is not uncommon for equipment to get lost or
    damaged on site before it is even used.

5
Lifting Moving
  • Exercise care when moving formwork as damage
    frequently occurs by during the lifting process
    by mishandling or through unsuitable equipment.
  • Use slings or straps when moving formwork by
    crane as opposed to chains, particularly in the
    case of H20.

6
Release Agent
  • Always use release agent.
  • Using release agent will make it faster and
    easier to strip formwork and it greatly reduces
    damage caused by stripping.
  • It reduces the amount of excess concrete getting
    stuck to panels making them easier to handle and
    reduce cleaning bill and or damage as a result.

7
No Drop Stripping
  • Never drop strip formwork, it is dangerous to
    workers and it will damage the equipment

8
Educate Workforce
  • Construction workers and staff are often unaware
    of the high cost of formwork and scaffolding
    equipment
  • Increasing management and worker awareness of the
    cost of mishandling formwork is the first step at
    changing wasteful behavior.

9
  • Eliminating the expense of lost or damaged
    equipment should be an obvious step for
    construction companies as it is an easy way to
    reduce their cost without interfering with their
    operations or affecting their performance.

10
www.theformworkstore.com