Title: Best HVAC Training in Chennai
1HVAC Design EngineeringIntroduct
ion to MEP Engineering(Building Services
Engineering)
Qatar
India
Conserve Green Building MEP Solutions WLL T
974 44427968 info_at_conservesolution.com
Peacock Academy Mobile91 96007
27083 academy_at_peacockengg.com
2 Copyright
- This presentation is an extract from HVAC Design
Engineering Course conducted by Conserve Green
Building and MEP Solutions and their group of
companies. - The content of this presentation is owned by
Conserve Green Building and MEP Solutions WLL. - Reproduction or distribution of this content
without the permission of Conserve Green Building
and MEP Solutions is prohibited
3 Learning Objectives
- Understand what MEP is?
- Scope of MEP Engineering?
- Where MEP Engineers are employed?
- Stake holders in a construction project
4Buildings No more brick and mortar
- In old days buildings are built as a shelter to
protect people from extreme climate, animals,
enemies, theft etc - Modern buildings are no more only brick and
mortar - Modern buildings are built to provide comfort and
luxury where people live, work and achieve. - It is the MEP Services or Building Services which
gives the comfort and luxury within the building
5What is MEP Services?
ELECTRICAL SERVICES
MEP
MECHANICAL SERVICES
PLUMBING SERVICES
CIVIL CO-ORDINATION
- MEP Services are also called as Building Services
in countries like UK, Canada, Australia. Where as
in India, middle east and US, the term MEP is
commonly used
6 Mechanical Services
- Ventilation
- Air Conditioning
- Heating
- Cooling
7 Electrical Services
- Electrical HT LT Power Distribution
- Power Control Cabling
- Lighting
- Emergency Exit Lighting
- Earthing Lightning Protection
- Low voltage Systems
- Building Security System
- Building Management System
8 Plumbing Services
- Domestic Hot Cold Water Supply
- Waste Water Management
- Rain Water Management
- Fire Protection
- In todays MEP Industry, Plumbing services are
also covered by Mechanical Engineers
9Why MEP Engineering is becoming more significant?
10Increasing Population and decreasing land
availability
- Increasing Population, Decreasing land
availability and Increasing Environmental
regulations resulted in the requirement of high
rise buildings where the services are complicated
and requires Engineering skills
11Migrating population towards extreme climates
- Historically the population density was higher in
tropical and moderate climates, globalization and
technology have caused migration of population to
extreme climatic conditions like Canada, Middle
East etc where buildings have to provided with
thermal comfort against the extreme climate
12 More People Centric
- Consider a building which is providing software
services. Services are provided by people and
more money is spent on people more than
buildings. Hence it is important to keep people
comfortable so that they offer better service.
Viewed over a 30 year period, initial building
costs account for approximately just 2 of the
total, while operations and maintenance costs
equal 6, and personnel costs equal 92.Graphic
Sieglinde FullerSource Sustainable Building
Technical Manual / Joseph J. Romm, Lean and Clean
Managemen, 1994.
13 Stakeholders in Construction Project
Pre-Construction Stage
Project Management Consultant
Design Consultant
Owner or Client
MEP Consultant
- Specialized Consultants
- Cost Consultant
- Green Building
- Consultant
- Value Engineers
-
-
-
Architecture Structural Consultant
14Stakeholders in Construction Project
Construction Post Construction Stage
Main Contractor
MEP Contractor
Supervision Consultant
Testing commissioning
Facilities Management
15 Summary
- Understand what MEP is?
- Scope of MEP Engineering?
- Where MEP Engineers are employed?
- Stake holders in a construction project