Title: OPS 571 GENIUS educatorops571geniusdotcom
1OPS 571 GENIUS Education Expert/ops571geniusdotco
m
- FOR MORE CLASSES VISIT
- www.ops571genius.com
2OPS 571 Entire Course (New)
- OPS 571 Week 1 Individual Assignment Process
Design Matrix and Summary - OPS 571 Week 1 Quiz
- OPS 571 Week 1 DQ 1
- OPS 571 Week 1 DQ 2
- OPS 571 Week 2 Individual Assignment Process
Designs and Supply Chains Presentation - OPS 571 Week 2 Learning Team Reflection
- OPS 571 Week 2 Quiz
- OPS 571 Week 2 DQ 1
- OPS 571 Week 2 DQ 2
- OPS 571 Week 3 Individual Assignment Process
Designs
3OPS 571 Final Exam Guide(New)
- 1. Which of the following is considered a major
process flow structure? Lead Time Fabrication
Lean Manufacturing Project 2. ISO audits
result in certifications that are done by first,
second, or third parties. Which of the following
result in the best certification of a firm?
Certification is sought by any firm assuming they
pay annual dues. 2nd Party where a customer
audits its supplier 3rd Party where a
qualified national or international
standards/certifying agency serves as an auditor
1st Party where a firm audits itself against
ISO standards 3. Which of the following is ISO
14000 primarily concerned with? Quality
management Time management Continuous
improvement management Environmental management
4OPS 571 Week 1 Individual Assignment Process
Design Matrix and Summary (New)
- Complete the Process Design Matrix.
- Write an executive summary identifying
appropriate design approaches for a selected
product and service. - Pick one service with which you are familiar.
Complete three to five line items such as
production line, self-service, or personal
attention approach, on the Process Design Matrix.
- Pick one product with which you are familiar.
Complete three to five line items such as Job
shop, batch, assembly line, or continuous flow
approach, on the Process Design Matrix. - Required Elements
- No more than 700 words
5OPS 571 Week 1 Quiz (New)
- QUIZ 1
-
- 1) Why is the planning phase often referred
to as phase 0 (Zero) of the generic product
development process? - 2) If an automotive service center has an
issue with a car not being clean when retumed to
a customer, the poka-yoke corrective action might
include what? - 3) According to the Service-System Design
Matrix, sales opportunity has what sort of
relationship to production efficiency? - 4) Permeable systems are characterized by
being penetrable by customers via what two forms
of contact? - 5) Some may argue that the production-line
approach may not treat the process as a service
process, but as what type of process?
6OPS 571 Week 2 Individual Assignment Process
Designs and Supply Chains
- This is part one of a two part assignment
starting with an introductory look at process
design and supply chains. - Identify a company with which you are familiar.
This could be your place of employment, a car
wash, a yard service company, and so forth. - Create an MS PowerPoint Presentation in which you
describe the current state of your selected
company's supply chain and an identified process.
7OPS 571 Week 2 Learning Team Reflection (New)
- Select a manufacturing organization the team
members are familiar with. - Review the company's website and other available
information and answer the following - What type of process design do they use Make to
Order, Make to Stock, or Batch? - What are two items regarding the manufacturing
process related to the organization that the team
finds unique or interesting? - Prepare a 350- to 1,050-word paper detailing the
findings of your discussion. - Â
- Click the Assignment Files tab to submit your
assignment.
8OPS 571 Week 2 Quiz (New)
- QUIZ 2
-
- 1) Which of the following consulting tools
are used in the cost impact and payoff analysis
stage in the operations consulting process? - 2) Which of the following is a situation
that likely will yield economies of scale? - 3) Which of the following is a key metric
associated with value stream mappinggt - 4) An advantage of a make-to stock process
is which of the following? - 5) Which of the following is one of the
major types of stakeholders impacted by most
consulting projects? - 6) Which of the following terms refers to a
special type of flowcharting tool that is
valuable for the development of lean processes?
9OPS 571 Week 3 Individual Assignment Process
Designs and Supply
- Create an MS PowerPoint Presentationin which you
evaluate the current state of the process you
selected in Week Two and summarize the proposed
future state. - Required Elements
- Evaluate the efficiency and effectiveness of the
process selected in Week Two using the data
collected. - Determine areas for improvement
- Design an improved process flow chart using an
appropriate tool. - Summarize two items from this improved process.
Include an explanation of how these items could
be used in your personal or professional life to
improve a process. - PowerPoint should include 4-5 slides with
detailed speaker notes.
10OPS 571 Week 3 Learning Team Reflection (New)
- Discuss the following
- What is the chase strategy?
- Identify 2-3 companies that might use the chase
strategy - What are some of the challenges associated with
using the chase strategy and why? - Prepare a 350- to 1,050-word paper detailing the
findings of your discussion. - Â
- Click the Assignment Files tab to submit your
assignment.
11OPS 571 Week 3 Quiz (New)
- QUIZ 3
- 1) The text mentions several common
approaches to use when developing strategy to
close a capacity gap (where utilization of a
resource exceeds capacity available). Which of
the following is among the common approaches
mentioned? - 2) Which of the following is considered a
pure production planning strategy? - 3) Which of the following is an input to the
master production schedule (MPS)? - 4) Which of the following is an input
necessary to run an MRP Program - 5) Which of the following is an essential
resource that flows through a hospital supply
chain? - 6) Which of the following is one of the
categories of manufacturing inventory? - 7) The main purpose of operation planning is
to specify the optimal combination of which of
the following?
12OPS 571 Week 4 Quiz (New)
- QUIZ 4
-
- 1) The vertical axis on a Gantt chart is usually
which of the following? - 2) Consulting firms typically use which of the
following techniques to plan and monitor the
engagements of the firm or specific projects? - 3) Which of the following identifies a key
principle of reengineering? - 4) An example of a graphic project report
utilized within project management is - 5) Which of the following would be the result of
subdividing a project? - 6) At the onset, a project originates as which of
the following?
13OPS 571 Week 4 Team Assignment Supply Chain
Design Paper (New)
- Review the Riordan Manufacturing Virtual
Organization. -
- Write a paper of no more than 1,400-words that
includes the following - Determine Riordan's manufacturing strategy
(chase, level, or combination) and explain its
benefits - Create a process flow diagram for the electric
fan supply chain - Select two metrics to evaluate performance of the
electric fan supply chain - Describe the supplier relationship and the
effects on the supply chain. As part of this
consider the following - Type of relationship
- Supplier location, size of company, and financial
stability - Metrics used to measure supplier performance
(on-time delivery, defects, etc)
14OPS 571 Week 5 Individual Assignment Project
Management Recommendation (New)
- Review the Project Management email.
- Write an email response in which you address the
following points - Determine which project might be implemented and
why (e.g. feasibility study, breakeven analysis,
etc). - Describe the five phases of a project
- Describe the key deliverables associated with the
selected project(s). - Click the Assignment Files tab to submit your
assignment.
15OPS 571 Week 5 Learning Team Reflection (New)
- Discuss the following
- What are TQM and ISO?
- How might TQM and ISO be used to improve an
organization? - What are the benefits and challenges each?
- What is the role of a Quality Control department
in relation to either TQM or ISO? - Prepare a 350- to 1,050-word paper detailing the
findings of your discussion. - Â
- Click the Assignment FIles tab to submit your
assignment.
16OPS 571 Week 5 Quiz (New)
- QUIZ 5
- 1) What is one analytical tool common to all
quality improvement programs? - 2) A fishbone diagram might be found in
which DMAIC category? - 3) What is the international quality
management standard for quality management and
assurance that is primarily concerned with
quality of air, water and soil? - 4) What is a reason that a company may
pursue ISO-9000 certification?
17OPS 571 Week 6 Quiz (New)
- QUIZ 6
- 1) According to Goldratt, which of the
following is defined as any resource whose
capacity is less than the demand placed on it? - 2) A bottleneck in a manufacturing process
may be targeted and eliminated by employing which
of the following? - 3) Which of the following is focusing step
of Dr. Eli Goldratts theory of constraints? - 4) Statistical Process control (SPC) and
data from the actual process to statistically
monitor the process over time are employed during
which step of the DMAIC cycle?
18OPS 571 Week 6 Team Assignment Process
Improvement Presentation (New)
- Create an 8-10 slide MS PowerPoint presentation
with detailed speaker notes. Include the
following - Identify which ISO standards apply to Riordan
Manufacturing - Using the Six Sigma DMAIC process, develop a new
process design for the production of the Riordan
electric fans. Be sure to take advantage of any
global opportunities available to Riordan, such
as lower labor costs. - Describe the bottlenecks that may occur in the
new process.
19OPS 571 GENIUS Education Expert/ops571geniusdotco
m
- FOR MORE CLASSES VISIT
- www.ops571genius.com