MBA PROJECT REPORT DISSERTION ON LOGISTICS - PowerPoint PPT Presentation

About This Presentation
Title:

MBA PROJECT REPORT DISSERTION ON LOGISTICS

Description:

We help & Guide to do MBA Final Semester Projects The students of MBA are now in the final semester and will be doing their project work this semester. This is one of the important components of MBA programme and in this context we have brought out some guidelines regarding project work to ensure that the project by the student is authentic and is of high quality. One of the important stipulations regarding project for MBA is that the candidate is to undertake a project in the chosen specialization. The projects will be reviewed, monitored and tracked by the Project Guide in coordination (ebrand3316vs) – PowerPoint PPT presentation

Number of Views:88
Slides: 11
Provided by: epost563
Category: Other
Tags:

less

Transcript and Presenter's Notes

Title: MBA PROJECT REPORT DISSERTION ON LOGISTICS


1
MBA PROJECT REPORT DISSERTION ON LOGISTICS
2
  • We help Guide to do MBA Final Semester Projects
  • The students of MBA are now in the final semester
    and will be doing their project work this
    semester. This is one of the important components
    of MBA programme and in this context we have
    brought out some guidelines regarding project
    work to ensure that the project by the student is
    authentic and is of high quality. One of the
    important stipulations regarding project for MBA
    is that the candidate is to undertake a project
    in the chosen specialization. The projects will
    be reviewed, monitored and tracked by the Project
    Guide in coordination (ebrand3316vs)
  •  
  • 1. PROJECT GUIDANCE
  • As the project guide your role is most
    significant in getting a quality project done.
    Indian Institute of Logistics, Chennai requests
    your valuable expertise in counseling, advising,
    monitoring, tracking and evaluating the projects
    under your guidance.
  • We request your full cooperation in our endeavor
    of ensuring quality projects.
  • In addition, in order to ensure quality, the
    qualification and experience of the guides have
    been made stringent. The project should be
    carried out under the direct supervision of a
    qualified guide / as per the qualification
    prescribed below.

3
  • Qualifications of Guide
  • As regards to MBA programme, the Guide must have
    Master Degree in Business Administration or any
    post graduation with specialization in the area
    relevant to the specialization opted by the
    candidate.
  • The guide should have five years of teaching
    experience at MBA level or post graduation with
    specialization in the area relevant to the
    specialization opted by the candidate or five
    years of industrial experience at least as middle
    level executive in case of MBA.
  • At a time a guide can supervise a maximum of 15
    students.
  • 1.2 Functions
  • As regards to MBA, the guide is expected to offer
    suggestions to fine tune the problem identified
    for the project study. In the case of MBA the
    problem identified should deal with contemporary
    business issues.
  • The guide has to monitor and review the project
    work periodically with minimum three reviews
    during the course of the project.
  • The guide has to send project review marks of
    students to the Management of the Indian
    Institute of Logistics.
  • The guide has to offer the suggestions for
    framework of analysis, and structuring the
    project report.
  • The guide has to go through the draft project
    report and offer suggestions wherever necessary
    and to confirm that the project report is
    submitted as per the prescribed format.
  • The guide has to confirm that the project report
    submitted is as per the format provided by
    Bharathiar University, Coimbatore

4
  • 2. General Instruction to Project Guides
  • ?Providing appropriate counseling, advice and
    suggestions to all students undertaking project
    work regarding project area and in general
    helping the project-in-charge in project related
    activities
  • ?Conducting at least three reviews and evaluating
    the progress of the projects
  • ?Ensuring that the student has incorporated all
    suggested improvements and suggestions
  • ?Checking that the content and format of thesis
    report is as per norms
  • 2.1 Project Guidelines given to students
  • Given below is the extract of the Project
    Guidelines given to students. Please go through
    the same to understand the expectations and
    requirements of a typical MBA project to be
    undertaken.
  • ?One of the important stipulations regarding
    project for MBA is that the candidate is to
    undertake a project in the chosen specialization.
    The main focus of the Project should be on the
    chosen area of Specialization in Logistics
    Shipping.
  • ? To explain about a brief synopsis of the
    proposed project in the prescribed format given.
  • ?The students are permitted to proceed with topic
    of the projects only
  • ?The student is expected to execute original
    work. If at any point of time it is noticed that
    the work is not original, the project will be
    summarily rejected.

5
  • 3. Major Types of Project
  • The project undertaken may be of various types
  • ? Exploratory type
  • The student to explore the possible causes for a
    phenomena or status
  • ?Descriptive to support or disprove existing
    facts with Quantative data
  • ? Survey type
  • ?Experimental study
  • Conduct of experiments to find the cause and
    effect relations between experimental variables
    and dependent variables
  • Ex. Impact of training programme on performance,
    impact of advertisements on sales
  • ?Desk research based on secondary data
  • Making use of published data and analyzing the
    data and riving interpreting such data and
    arriving at meaningful conclusions.
  • 4. Role of Project Guide
  • ?The Student is required to meet the guide
    periodically on mutually agreed upon dates.
  • ?The Student is also advised to maintain e-mail
    contact with the guide
  • ?Any Conflict of interest during the course of
    the project can be immediately brought directly
    to the notice of the Management of IIL.
  • Project topic choice, the student is required to
    present the following details
  • ?Need for the project
  • ?Objectives and scope of the project
  • ?Review of Literature

6
  • Finalization of Research Objectives, the student
    is required to present the following details
  • ? Synopsis (2 pages executive summary of the
    project)
  • For the First Review, the student is required to
    present the following details
  • ?Problem identified and confirmed
  • ?Background Study
  • ?Proposed Methodology Type of Project
  • For the Second Review, the student is required to
    present the following details
  • ? Any Suggestions/extensions suggested by the
    guide at the First Review should be incorporated
    and project modified accordingly before the
    Second Review.
  • ?Proposed Analysis (Statistical Tools) and
    Interpretation methodologies
  • ?Deliverables Expected Conclusions
  • ?A report incorporating all the above details
    should be submitted at the time of Second Review.
  • ? Work completed so far
  • ? Questionnaire designed or interview schedule
    (if applicable)
  • ? Further work to be done

7
  • For the Third Review, the student is required to
    present the following details
  • ? Progress of Second Review
  • ?Any Suggestions/extensions suggested by the
    guide at the Second Review should be incorporated
    and project modified accordingly before the Third
    Review.
  • ?Report of Pilot Study
  • ?Summary of Literature review
  • ?Data captured so far with all details including
    scope, sample size, assumptions, constraints,
    limitations etc.
  • ? Deviation if any and justification
  • ?A report incorporating all the above details
    should be submitted at the time of Third Review.
  • Submission of Rough Draft by the student
  • ?A draft copy of Thesis signed by guide
  • ?The evaluation by the project guide is based on
    the above points.
  • Last date for Submission of final Draft by the
    student
  • ?Each student is expected to submit three copies
    of Project Report
  • o Title Sheet
  • o Bonafide Certificate duly signed by the Project
    Guide and Project-in- charge
  • o Acknowledgement
  • o Table of Contents List of Tables
  • o List of Figures
  • o List of Abbreviations

8
  • Chapter 1 - Introduction
  • ?Research Background Description of specific
    industry/ general scenario of industry
  • ?Identified Problem
  • ?Need for Study
  • ?Objectives Scope
  • ?Deliverables
  • Chapter 2 Literature Survey
  • ?Review of Literature
  • ?Research Gap
  • Chapter 3 - Methodologies
  • ?Type of Project
  • ?Target respondents
  • ?Assumptions, Constraints and Limitations
  • ?Proposed Sampling Methods
  • ?Data Processing
  • ?Tools for Analysis
  •  
  • Chapter 4 Data Analysis and Interpretation
  • ?Proposed Analysis (Statistical Tools) and
    Interpretation methodologies

9
  • Chapter 5 Conclusions
  • ?Summary of Findings
  • ?Suggestions Recommendations
  • Conclusions
  • ?Directions for Future Research
  • Appendix
  • ?Copy of Questionnaire/Interview Schedule
  • ?Bibliography
  • ?Any Other
  • Project topics Examples
  • Research on Supply Chain Management
  • Study on import export procedure in custom
    clearance
  • Study on Inventory control methods
  • Study of customs procedure of import export
  • Study on multimodal transport
  • A research on customer service satisfaction
    level.
  • Research on ODC (Over Dimensional Cargo)
  • Research on Vendor Management
  • Study on Conternisation

10
  • For Guidance Consultancy Contact
  • Prof. Prakash Bhosale
  •    Office 91 8097027355
  •    Phone 91 9222086563
  •    SMS 91 9224335234
  •    ebrandingindia2015_at_gmail.com
  •    info_at_dissertationwritingeditting.com
  •   Skype-  ebrandingIndia
  • Whats app 91 9867806399, 91 9167719419
  • http//dissertationwritingediting.com/
  • http//www.mbaprojectreports.com/
  • Time - 10 AM TO 7.30 PM IST , Monday to
    Friday ( After office hours leave your message
    by email / sms / whatsapp / skype I will revert
    soon )I am not sure of attending all phone
    calls. please email or connect on Skype, whatsapp
    if not reachable on phone
Write a Comment
User Comments (0)
About PowerShow.com