BSOP 330 Potential Instructors / tutorialrank.com - PowerPoint PPT Presentation

About This Presentation
Title:

BSOP 330 Potential Instructors / tutorialrank.com

Description:

For more course tutorials visit www.tutorialrank.com BSOP-330 Master Planning All Weeks Discussion Questions Devry University – PowerPoint PPT presentation

Number of Views:4
Slides: 10
Provided by: pirate660014
Category:

less

Transcript and Presenter's Notes

Title: BSOP 330 Potential Instructors / tutorialrank.com


1
BSOP 330 Potential Instructors / tutorialrank
For More Best A Tutorials
www.tutorialrank.com
2
BSOP 330 Potential Instructors / tutorialrank
  • BSOP 330 Master Planning All Weeks Discussion
    Questions (DEVRY)
  • BSOP 330 Week 1 Lab Assignment Problems 4.1, 4.5,
    4.9 and 4.11, pages 140-141 (DEVRY)
  • BSOP-330 Master Planning All Weeks Discussion
    Questions Devry University
  • Problems 4.1 The following gives the number of
    pints of type A blood used at Woodlawn Hospital
    in the past 6 weeks
  • a) Forecast the demand for the week of October 12
    using a 3-week moving average.
  • b) Use a 3-week weighted moving average, with
    weights of .1, .3, and .6, using .6 for the most
    recent week. Forecast demand for the week of
    October 12.

3
BSOP 330 Potential Instructors / tutorialrank
  • BSOP 330 Week 2 Lab Assignments Chapter Four
    Problems 4.23, 4.27, 4.33, and 4.35 (DEVRY)
  • BSOP 330 Week 2 Southwestern Case study (DEVRY)
  • a) Compute MAD and MAPE for managements
    technique
  • b) Do managements results outperform (i.e., have
    smaller MAD and MAPE than) a naive forecast?
  • c) Which forecast do you recommend, based on
    lower forecast error?
  • 4.33
  • a) Forecast the number of transistors to be made
    next year, using linear regression.
  • 1. Develop a forecasting model, justifying its
    selection over other techniques, and project
    attendance through 2007.
  • 2. What revenues are to be expected in 2006 and
    2007?
  • 3. Discuss the schools options.

4
BSOP 330 Potential Instructors / tutorialrank
  • BSOP 330 Week 3 Lab Assignments Chapter 13
    problems 13.3, 13.5, 13.9, 13.21 (DEVRY)
  • BSOP 330 Week 4 Lab Assignments Chapter 12,
    problems 12.1, 12.5, 12.9, 12.15 (DEVRY)
  • Chapter 12, problems 12.1
  • L. Houts Plastics is a large manufacturer of
    injection-molded plastics in North Carolina. An
    investigation of the companys manufacturing
    facility in Charlotte yields the information
    presented in the table below. How would the plant
    classify these items according to an ABC
    classification system?
  • Chapter 12, problems 12.1
  • L. Houts Plastics is a large manufacturer of
    injection-molded plastics in North Carolina. An
    investigation of the companys manufacturing
    facility in Charlotte yields the information
    presented in the table below. How would the plant
    classify these items according to an ABC
    classification system?

5
BSOP 330 Potential Instructors / tutorialrank
  • BSOP 330 Week 4 Quiz (DEVRY)
  • BSOP 330 Week 4 Southwestern Case study Printing
    companies Programs and Inserts (DEVRY)
  • BSOP-330 Week 4 Quiz
  • 1. For the programs, what are the EOQ's for both
    printing companies? How many orders of each size
    will be needed?
  • 2. For the inserts, what are the EOQ's for both
    printing companies? How many orders of each size
    will be needed?
  • 3. Using the EOQ's above and volume order
    information provided, what will be the cost of
    the programs and inserts if they are purchased
    from Quality Printing

6
BSOP 330 Potential Instructors / tutorialrank
  • BSOP 330 Week 5 Homework Problems Mater
    Production Schedule Problem 1, 2 and 3 (DEVRY)
  • BSOP 330 Week 5 Quiz (DEVRY)
  • MASTER PRODUCTION SCHEDULE
  • MAKE-TO-STOCK
  • Beginning PAB prior to week number one is 500.
  • If the forecast is larger than the book orders,
    complete the MPS using the forecast demand. If
    the booked orders is larger than the forecast
    complete the MPS using the booked orders
  • Question
  • (TCO 9, 10, 12) The MPS
  • Student Answer
  • must sum up to the total in the production plan.
  • can have any quantity necessary to meet customer
    demand.
  • is only used in make-to-stock manufacturing.
  • does not have to be tested for capacity limits.

7
BSOP 330 Potential Instructors / tutorialrank
  • BSOP 330 Week 6 Lab Assignments Chapter 14,
    problems 14.1, 14.3, 14.9, 14.13 (DEVRY)
  • BSOP 330 Week 7 Case Study Final (DEVRY)
  • Chapter 14, problems 14.1
  • You have developed the following simple product
    structure of items needed for your gift bag for a
    rush party for prospective pledges in your
    organization. You forecast 200 attendees. Assume
    that there is no inventory on hand of any of the
    items. Explode the bill of material. (Subscripts
    indicate the number of units required.)
  • Question 1. Which variations in demand for police
    services should be considered in an aggregate
    plan for resources? Which variations can be
    accomplished with short-term scheduling
    adjustments?
  • Question 2. Evaluate the current staffing plan.
    What does it cost? Are 26 officers sufficient to
    handle the normal workload?
  • Question 3 Determine the cost of the Chiefs
    plan. Do you need to implement the Chiefs

8
BSOP 330 Potential Instructors / tutorialrank
  • BSOP 330 Week 7 Lab Assignments Chapter 16,
    problems 16.1, 16.3, 16.5, and 16.9 (pages 640)
    (DEVRY)
  • BSOP 330 Week 7 Quiz (DEVRY)
  • 1. (TCOs 5 12) Manufacturing cycle time is best
    defined as the (Points 4)
  • length of the work shift, expressed in minutes
    per day.time it takes a unit to move from one
    workstation to the next.time between the start
    of one unit and the start of the next unit.sum
    of all the task times to make one unit of a
    product.time from raw materials receipt to
    finished product exit.
  • 16.1 Leblanc Electronics, Inc., in Nashville,
    produces short runs of custom airwave scanners
    for the defense industry. You have been asked by
    the owner, Larry Leblanc, to reduce inventory by
    introducing a kanban system. After several hours
    of analysis, you develop the following data for
    scanner connectors used in one work cell. How
    many kanbans do you need for this connector?