Simple Off-Grid System Plan Review - PowerPoint PPT Presentation

About This Presentation
Title:

Simple Off-Grid System Plan Review

Description:

Dr.David Ranko’s Simple Off-Grid System Manual Review. Is the Simple Off-Grid System Book Review really the solution to your problem? Do you know that you can have anything in the Product experience? – PowerPoint PPT presentation

Number of Views:34

less

Transcript and Presenter's Notes

Title: Simple Off-Grid System Plan Review


1
Simple Off-Grid System Review
  • The circuits of the DC junction box and the
    inverter all have the overload protection
    function. When these extreme conditions occur,
    these circuits will automatically shut down. No
    worry about this. In addition, each panel usually
    has high quality and can bear extreme beating or
    dragging. Can my house still be powered if the
    national grid cannot supply power? If this
    condition happens in daytime and your system
    still works, your house can be powered. If at
    night, you won't have electricity to use unless
    you install batteries inside it. On average
    conditions it is suggested that users buy
    batteries. However, if your house is located in
    some remote area of India, you might need them.
    Can the system supply power in a steady mood in
    the long run? Nothing will not grow old. It will
    become not as efficient as it is today at a rate
    of about 7 or so each year. This means it can
    keep generating power for as long as 20 to 25
    years in a good condition. But if you have
    batteries, they will not last that long.

2
Simple Off-Grid System Plan
  • This is a difficult question to answer, for
    different regions have different price standards.
    For example, the installation price in China is
    usually between 12,000 yuan/kW and 13,000
    yuan/kW. In the UK or US, probably the price is
    higher at least. How much area do I need to
    install the system? First, you should learn how
    much rooftop area you have second, estimate how
    big your system should be third, calculate. The
    average condition is each kW of solar panels can
    occupy around 10 square meters. That's to say, if
    you want to build a 3 kW system, you need 30
    square meters on your rooftop. Does such a system
    need batteries? I don't think people love to buy
    batteries, for they are relatively expensive as
    one reason. The other reason is it is not
    necessary for most house owners. The truth is
    still some people live in remote areas where
    national grids cannot reach, and so their systems
    cannot be connected to these grids. Under this
    condition the system needs batteries. If not, you
    are suggested to connect your system to your
    local national grid.

3
Simple Off-Grid System Program
  • What components are needed for the system? They
    are solar panels, solar inverters, racks, cables,
    installation fittings and so on. If you are
    building a large system, you also need
    transformers, power distribution cabinets and
    others. Can I get my investment back? Building a
    solar PV system is an investment, and you can get
    your investment back as long as you connect your
    system to the local national grid. As soon as you
    connect, you can get payments from the local
    government which is granted the policy by your
    central government (some countries don't have
    this policy). If there is the policy, you can get
    payment by each kWh of electricity you sell to
    the grid. It takes several years for you to get
    your money back. Notice that you will never need
    to pay your power bills that much as soon as you
    install the system. Can this system be able to
    get rid of thunder, hail, electric leakage or
    other problems?

4
Simple Off-Grid System Book
  • However Simple Off-Grid System Review remember
    that before you set out engaging a solar
    installer there are quite a number of things that
    you need to know to reap all the benefits. With
    the popularity of setting up solar panels to
    generate electricity, solar installation has
    become a very lucrative business.
  • Given below are a few vital points you need to
    know from a solar system installer
  • Check the credentials of the installer that you
    plan to finalize on.
  • Inquire about certification, the qualifications
    and experience of their technical staff. By and
    large an experienced solar company can finish the
    work with great accuracy because they would have
    a lot of experience having carried out many
    similar installations.
  • http//binarymetabotreview.com/simple-off-grid-sys
    tem-program-review/
  • http//binarymetabotsoftwarereview.com/simple-off-
    grid-system-plan-review/
Write a Comment
User Comments (0)
About PowerShow.com