LVL Scaffolding Planks - PowerPoint PPT Presentation

About This Presentation
Title:

LVL Scaffolding Planks

Description:

New Bridge Solutions is a trusted name in providing the best LVL Scaffoding Planks for the industrial use. The products are highly appreciated for their superior quality and percision finish. – PowerPoint PPT presentation

Number of Views:40
Updated: 28 December 2015
Slides: 10
Provided by: newbridgeservices
Category: Other

less

Transcript and Presenter's Notes

Title: LVL Scaffolding Planks


1
Safety Tips for using Scaffolding Planks
2
Long Way-Up, Long Way- down
Falls from high places are usually serious.
Studies show that half of all people hitting a
hard surface with a velocity of 18 miles per
hour- that's 27-feet per second- will be
killed. Ensure the safety of all the people
involved in the process of installing Scaffolding
Planks with these tips.
3
Tip 1
SCAFFOLD BASE MUST BE SET ON AN ADEQUATE SILL OR
PAD to prevent slipping or sinking and fixed
thereto where required. Any part of a building or
structure used to support the scaffold shall be
capable of supporting the maximum intended load
to be applied.
4
Tip 2
BRACING, LEVELING PLUMBING OF FRAME SCAFFOLDS
  • Plumb and level all scaffolds as the erection
    proceeds. Do not force frames or braces to
    fitlevel the scaffold until proper fit can
    easily be made.
  • Each frame or panel shall be braced by
    horizontal bracing, cross bracing, diagonal
    bracing or any combination thereof for securing
    vertical members together laterally. All brace
    connections shall be made secure, in accordance
    with the manufacturers recommendations .

5
Tip 3
BRACING, LEVELING PLUMBING OF TUBE CLAMP AND
SYSTEM SCAFFOLDS
  • POSTS SHALL BE ERECTED PLUMB in all directions,
    with the first level of runners and bearers
    positioned as close to the base as feasible. The
    distance between
  • PLUMB, LEVEL AND TIE all scaffolds as erection
    proceeds.
  • FASTEN ALL COUPLERS AND/OR CONNECTIONS securely
    before assembly of next level.
  • VERTICAL AND/OR HORIZONTAL DIAGONAL BRACING MUST
    BE INSTALLED according to manufacturers
    recommendations.

6
WHEN FREE STANDING SCAFFOLD TOWERS exceed four
(4) times their minimum base dimension
vertically, they must be restrained from tipping
(CAL/OSHA and some government agencies require
stricter ratio of 3 to 1).
7
DO NOT ERECT SCAFFOLDS NEAR ELECTRICAL POWER
LINES UNLESS PROPER PRECAUTIONS ARE TAKEN.
Consult the power service company for advice.
8
For matchless solutions of LVL Scaffolding
Planks, get in touch with New Bridge Services, a
prominent name for innovative products at
affordable prices
9
Contact Us New Bridge Services Phone 61 43791
11 95, 61 39702 60 78 E-mail sales_at_newbridgeserv
ices.com.au Website http//www.newbridgeservi
ces.com.au
Write a Comment
User Comments (0)
About PowerShow.com