The very common question that we get from clients before pool construction is the amount of time needed for completion. But duration of any pool project varies depending upon the size of the project, associated landscaping and material required. – PowerPoint PPT presentation

Number of Views:16

less

Transcript and Presenter's Notes

Title: Tips for Constructing Concrete Pools in Melbourne


1
Lazaway Pool Spa
  • TIPS FOR CONSTRUCTING
  • CONCRETE POOLS IN MELBOURNE

2
  • The very common question that we get from clients
    before pool construction is the amount of time
    needed for completion. But duration of any pool
    project varies depending upon the size of the
    project, associated landscaping and material
    required. Below is a basic list of stages with
    involved tasks
  • Planning (4-6 weeks approximately)
  • Structuring (3-4 weeks)
  • Final Stage
  • Curing

Email Us enquiries_at_lazaway.com.au
Lazaway Pool Spa
3
Planning (4-6 weeks approximately)
  • From the day you sign a contract to the day
    excavators arrive, the time needed for the whole
    process is generally 4-6 weeks.
  • Engineering Plans, Working Drawings, Warranty
    Insurance and Building Permits are arranged
    during this time
  • Contractors and Staffs are scheduled and in case
    if a Planning Permit is required, additional time
    is required

Email Us enquiries_at_lazaway.com.au
Lazaway Pool Spa
4
Structuring (3-4 weeks)
  • Pool location is marked using pegs, strings and
    paint
  • After this, the excavator arrives to dig the pool
  • In the next week, drainage layer and in floor
    cleaning pipes are installed
  • Structural stage in the second week involves
    steel frames and formwork construction
  • Then, plumbing is done with pipes running back to
    equipment areas
  • Final inspection and check is undertaken before
    the concrete is sprayed in

Email Us enquiries_at_lazaway.com.au
Lazaway Pool Spa
5
Final Stage
  • All finishing work is done and the pool is filled
    with water and commissioned
  • Waterline tile is installed to set the pool level
    before the coping goes on
  • Pool fence is installed and inspected
  • Pool interior is done, followed by water filling
  • Pool Water is chemically treated and equipment
    commissioned
  • The new pool is handed over to the client in the
    end

Email Us enquiries_at_lazaway.com.au
Lazaway Pool Spa
6
Curing
  • When the concrete is installed, no further work
    can be done for almost a month until completion
    of curing process
  • In this one month, commence the landscaping
    including paving slabs, retaining walls, etc.
    Even install the filtration and heating equipment

Lazaway Pools and Spa is a reputed name for
constructing concrete pools in Melbourne. The
team has specialist pool designers with
comprehensive pool designing and construction
services for both commercial and domestic clients.
Email Us enquiries_at_lazaway.com.au
Lazaway Pool Spa
7
Contact Us
Address 1a Burwood HWY, Wantirna VIC Call On 03
9837 6000 E-mail At enquires_at_lazaway.com.au Visit
http//www.lazaway.com.au/
Email Us enquiries_at_lazaway.com.au
Lazaway Pool Spa
Write a Comment
User Comments (0)
About PowerShow.com