Title: Sap ps online training in hyderabad
1Sap ps online training USA,UK, Canada
- Online classroom Corporate
- Training certifications placements support
- CONTACT US
- MAGNIFIC TRAINING
- INDIA 91-9052666559
- USA 1-678-693-3475
- info_at_magnifictraining.com
- www.magnifictraining.com
2Sap ps online training USA,UK and Canada
- What is SAP-Project System?
- Project System is a Project management tool from
SAP. Which has a very good integration with the
other modules of SAP like FI, CO, MM, SD, PP, HR,
DMS. This module basically co-ordinates and
controls all the phases of a project, in direct
co-ordination with purchasing and controlling,
from quotation to design and approval, to
resource management and cost settlement.
3Sap ps online training USA,UK and Canada
- What is Project Definition ?
- Project definition is a binding framework in SAP
for all organizational element created within a
project (e.g. WBS and Networks). Data like
company code, plant and person responsible can be
defaulted into WBS if initially entered in the
project definition. Such data can also be
defaulted into the project definition via project
profile which will then default it to subsequent
WBS.
4Sap ps online training USA,UK and Canada
- What is WBS ?
- A Work Breakdown Structure (WBS) is a model of a
project, and shows the project activities to be
fulfilled in hierarchical form. It forms the
operative basis for planning costs, revenues, and
payments, as well as for scheduling, and
budgeting. It also shows the responsibility.
5Sap ps online training USA,UK and Canada
- One definition from the Project Management
Institute is as follows - The Work Breakdown Structure (WBS) is a key
planning tool used to define a project in terms
of its deliverables while providing a method for
breaking these deliverables into meaningful work
efforts.
6Sap ps online training USA,UK and Canada
- It is the functional basis for further planning
steps in a project, for example, for process
planning, cost planning, scheduling, capacity
planning or costing, as well as project control. - It provides a clear picture of the project and
facilitates the coordination and implementation
of the project from a management standpoint.
7Sap ps online training USA,UK and Canada
- What is a Network ?
- A Network in Project System module is used to
represent the flow of activities or tasks within
a project. During the life cycle of a project,
networks are used as a basis for planning,
analyzing, controlling and monitoring schedules,
dates and resources.
8Sap ps online training USA,UK and Canada
- A Network header contains all the project
activities and can be used to default certain
values for the entire network. Some of these
fields include assignment to WBS, profit center,
basic start and finish dates of the network as
well as indicators for scheduling (forwards,
backwards).
9Sap ps online training USA,UK and Canada
- What is Standard Project Structure ?
- Standard structures in Project System can be
found in Standard project definitions and in
Standard WBS These standard structures can be
used as a template to standardize project
management. - This brings about the advantage of Making the
processing of projects more transparent (everyone
create an operative project from a standard
project), Enabling comparison of projects with
similar structures, Facilitates project
controlling
10Sap ps online training USA,UK and Canada
- Standard project templates CANNOT be used to
capture any actual data (e.g. costs, actual
materials used) and they serve as a quick way to
create an operative project during implementation
stage. As such, it is recommended that nominated
users maintain these standard project templates
at least once a year or whenever there are
process changes for each type of project.
11Sap ps online training USA,UK and Canada
- What is Project type ?
- Project type is an object that groups projects
according to criteria. Authorization and security
can be done based on the project types. - What is Project Coding Mask ?
- Project Coding helps display complex project
numbers. They can also be used to indicate the
position of a WBS element in the project
hierarchy.
12Sap ps online training USA,UK and Canada
- Project Code has 2 parts
- Part 1 Project Identifier (Project Coding Mask)
- Part 2 Project Number (usually a serial number)
- Every project begins with a Project-ID (max. 5
Characters), Using separators to distinguish the
different WBS levels. e.g. "/", "-", "." - Character max. for Project Code which includes
Project ID, Project Number and all separators.
13CONTACT US