How do gourd environmental site of hoists - PowerPoint PPT Presentation

About This Presentation
Title:

How do gourd environmental site of hoists

Description:

We supply overhead crane,gantry crane,jib crane,crane parts, port crane,electric hoist! skype: cherry.swallow Email: christine@ytcrane.com Web: – PowerPoint PPT presentation

Number of Views:15
Slides: 5
Provided by: ytcrane
Category:

less

Transcript and Presenter's Notes

Title: How do gourd environmental site of hoists


1
How do gourd environmental site of hoists
2
Sling lifting rigging points to note
  • 1 Please note that in the course of the
    relationship between the angle between the
    carrying tonnage
  • 2, if the lifting sets of rigging used with
    damage , 100 ton mobile crane no use
  • 3, to avoid shock or vibration loading
  • 4 , the safety factor of 41 , 51 or 61
    particular , the safety factor to be used within
    the range.

3
Lifting chain rigging points to note are what
  • 1 , the chain is not allowed in the course of
    knotted or twisted
  • 2, can not load with hook tip
  • 3 , chain rigging the normal operating
    temperature of -40 degrees to 200 degrees
  • 4 , leg rigging, materials lifting equipment
    point should be located vertically above the
    center of gravity of the object
  • 5,3 If the legs rigging , lifting objects hanging
    points should be located on both sides , lifting
    points above the center of gravity
  • 6, if the three- legged and four- legged rigging
    , mini electric chain hoist rigging point should
    be uniform focus is on lifting the object level,
    and was hanging over the center of gravity .

4
 Hoist the specific requirements for
environmental site
  • Hoist before the job , you need to inspect the
    site to explore the environment , but also the
    need for basic workplace layout and improved in
    order to ensure the smooth operation of electric
    hoists.
  • For the construction site should be flat , to "
    Stone one level" , the construction of water ,
    electricity and gas to reach conditions of use
    another such encounter dark weather or foggy
    weather , should be on the scene with a reliable
    lighting / eye-catching lights , communications
    and fire protection facilities wire rope motor
    hoist, fire exits and smooth installation of
    equipment to the construction site under
    construction and other systems have reliable
    isolation and isolation has spare parts, tools
    and construction materials, storage space , there
    should be a corresponding wind, rain , frost and
    other protective measures , inspection of parts,
    should not be installed in time temporary storage
    safekeeping and hoist the main civil works
    related to the completion of the installation ,
    manual hand chain hoist lightning ground
    improvement.
Write a Comment
User Comments (0)
About PowerShow.com