Title: National Seminar on Remanufacturing Organized by ASSOCHAM
1National Seminar on RemanufacturingOrganized
byASSOCHAM Ministry of Heavy Industries
Public Enterprises
- Imperial Hotel, Delhi
- 18th September 2009
2Topics
- User Expectations
- Why Reman.
- Timken Solution
- Customer value from Reman programs Timken Cases
3User Expectations
- Minimize Capital costs
- Operate plant and machinery with the lowest cycle
cost of components - Maximize uptime and productivity
- Minimize equipment delays and unproductive time
- Planned maintenance Vs breakdown
- Plant reliability
- Improve product quality
- Maintain minimum inventory of components
4Why Reman
Potential Life without Repair
Ultimate Bearing Life
Potential Life with Repair
5Common Questions
- Will a remanufactured bearing last as long as a
new one? - In most cases, they will
Likelihood of Premature Bearing Damage
6Concern There is an optimum cost
- Dont repair too soon, dont repair too late!
7Timken Solution
8Range of Services
- You can select from a range of repair services
- Recertify Clean, examine, verify internal
clearances, preserve and package - Reclaim Polish using proprietary vibratory
process, preserve and package - Recondition Combines Recertify and Reclaim
services - Remanufacture Clean, examine, grind raceways,
new roller sets, replace major components as
required, reset internal clearances, preserve
and package
9Customer Value from Remanufacturing Programs
Timken Cases
10Coiler pinch rolls of a Hot Strip Mill
- Market
- Primary Metals
- Application
- Hot Strip Mill
- The Timken Advantage
- Timken worked with customer to identify solution
to - extreme wear in coiler pinch rolls.
- Timkens new rolls with Mill Clad steel overlays
- Reduce wear and lengthen service life
- Increase coiler uptime and reduce maintenance
hours - Reduce roll inventory
- Results
- Increased coiler uptime and increased strip
quality - Reduced Roll inventory
- Reduced maintenance 8 mandays every 2wks to
every 16 20 wks - Reduced redressing time for rolls -
11Machine Tool
- Market
- Machine Tools Horizontal Machining Center
- Application
- Cross Roller bearing for table mounting
- The Challenge
- Existing bearing requiring repair and machine
downtime cost is Euro 30,000 - per day
- New bearing leadtime is minimum 6 months
- The Timken Advantage
- Timken turned arround the bearing repair
installed new rollers and race - grinding - at its plant in 7 days
- Results
- Machine was producing quality product in 7days
- Frequent downtimes and adverse product quality
on operating with damaged - table bearings eliminated
12Mining Equipment
- Market
- Mining
- Application
- Mining Equipment Repair Operations
- The Timken Advantage
- Timken Advantage Bearing repair, on-site
maintenance - training, quality products and good customer
service help - to improve Equipment Service providers
performance in serving the - mining industry.
13Bearing Repair - Lafarge Cement
- Application KHD Roller Press
- Bearing Make Part No. FAG 517680A
- Value of two bearing - 102,360
- Average life of the bearing 2 to 3 years
- The lead-time of new bearing 12 to 24 months
- The above bearings has been refurbished and in
operation for more than 10000 Hrs. - The cost of refurbishment of two bearings -
61462 - Customer has not purchased any set in year 2008.
- Value Created
- 40,898 Direct savings
- No Mill downtime because of bearing availability
14Bearing Repair - Essar Steel Hot Strip Mill
- Application Hot Coil Box Mandrel
- Bearing Part No. M272749Assy902B3 and M268749
Assy90118 - Value of two bearing - 27,500
- The lead-time of new bearing 12 months
- Customer could remove bearing from the mandrel.
Would need to gas cut bearing with potential risk
to mandrel - Timken Service Engineer designed the fixture and
dismantled the bearing without damaging it. - Bearings are being refurbished for 13,475
- Value Created
- 14,075 Direct savings
- No damage to shaft
- Mandrel was assembled and put back in service
15Chock Rebuild Tinplate Company of India
- 4 Hi Skin Pass Mill Chock Rebuilding
- The chocks were scraped by the customer
- The cost of 4 new chock will be 60,000
- Operated in mill for more than 12 years
- New chocks delivery will be 12 to 24 months
- Set of 4nos. of chocks rebuilt
- The turn around time is 4 months
- The cost of rebuilding is 14,000
- The chocks were sent to customer with UST
Magnaflusk Test report. Currently in Operation -
Value Created 46,000 Direct savings No Mill
downtime because of chock availability Improved
finish over other chocks in operations Customer
will be sending balance 4 sets in schedule.
16Usha Martin
- Procured used bar Mill from US. (15 to 20 years
old) - Customer wanted available bearings and chocks
refurbished and put back in operation -
- Refurbishment order value 50,000
Value Created 75,000 Direct savings Mill stand
will be commissioned using existing chocks and
bearings as per project schedule