Title: BRIEFING
1 BRIEFING ON WATER RESOURCES IN N.W.F.P
2AREA
- Total area of NWFP. 18.4 million acres
- Cultivable area. 6.55
- Irrigated area 2.125
- Balance area 4.425
3Existing infrastructure
4WATER PLAN/STRATEGY
- Objectives
- Improvement of existing systems.
- Increase irrigation application efficiency.
- Bring new area under irrigation.
- Reclamation of water logged lands.
- Minimize water pollutants.
- Drought Management.
- Flood Control.
5- Course of action
- Lining of irrigation canals.
- Remodeling of canals.
- On farm water management
- Harness manage hill torrents
- Construction of small, medium large dams.
- Small irrigation schemes.
- Improvement of civil / private channels.
- Drainage schemes.
- Institutional Reforms.
6Action Plan
- Construction of Gomal Zam Dam.
- Construction of 7 small dams.
- Pre-feasibility of 9 small dams.
- Feasibility of 5 small dams.
- Feasibility of 3 small dams.
- Feasibility of Kurram Tangi Dam.
- Detailed design of CRBC 1st Lift.
- 325 small irrigation schemes under DERA ADP.
- Feasibility for Remodeling of Warsak Canals.
- Lining of irrigation channels.
- 9 SCARP Schemes.
7Future Interventions
8- IRRIGATION PROJECTS
- Foreign/Federal Funded Projects
- A) National Drainage Programme.
- Total cost - Rs. 25048.00 million
- Share of the Province - Rs.2133.35 million
- Number of Sub-Projects - 17
- Schemes under implementation - 09
- Schedule completion - June, 2005
- Area to be improved - 459000 acres
- New area - 11800 acres
9- B) 2nd Flood Protection Sector Project.
- Total cost of the Project - Rs. 4614.387
million . - Share of the NWFP - Rs.455.50 million.
- Number of Schemes - 24 (7 core sub projects
17 other projects) - Status
- i) 5 Nos. core Sub-projects approved by CDWP.
- ii) 4 core Sub-projects awarded.
- ii) Model studies of 2 nos. core Sub-projects
completed. - iv) 5 Nos. other projects submitted to CDWP
- v) 2 Nos schemes with PDWP.
- vi) 9 schemes at feasibility stage.
10- C) DERA
- Number of Schemes -- 249. (includes 4 small
dams.) - Estimated cost - Rs.1134.879 (M)
- Schedule completion - August 2004
- All schemes under implementation.
- Area to be improved - 5,00,000 acres
- New area - 55,400 acres
11D) Other Irrigation Projects.
12E) Provincial ADP 2003-04
13III. BHAL SAFAI
- Number of channels to be desilted 428 Nos.
- Length of channels to be desilted 2326 Km
- Quantity of silt to be removed 47 M.cft.
- Estimated cost of desilting Rs. 44 (M)
14IV. THE LINING OF WATER CHANNLES
- Water losses from head to farm over 50.
- NWFP has 2083 KMs unlined channels.
- Assuming 8 Cs 2 Cs losses per m.sft in the
unlined and lined channels, NWFP losses 1052
Cs 7.3 of max. designed discharge. - Lining of Irrigation Channels NWFP-
Rs.5000 m. - PCI for Rs.2248 m as Phase-I
15- SMALL RESERVOIRS
- A. Existing Dams in NWFP
16B. Under implementation
17C) Small Dams whose Feasibilities have been
completed.
18D) Small Dams whose Pre-feasibilities have been
completed.
19VI. POSITION ON LARGE DAMS
- Storage capacity of existing reservoirs
diminishing. - Need for new reservoirs.
- Consensus between the Provinces on selection of
dam sites.
20Sites for Large Dams
21NWFPs POSITION
i. Wide range of choice. ii. Bhasha Dam
suitable and non-controversial
22POSITION ON WATER ACCORD 1991 Water utilization
- MAF
- Present Withdrawal 7.82
- Future Interventions
- CRBC 1st Lift 0.78
- Improvement to existing Irrigation System 0.18
- Total 8.78
- Un-utilized share 0.96
23- VIII. ENVIRONMENTAL/ECOLOGICAL CONSIDERATION
- Kabul river polluted due to untreated municipal /
industrial effluents - Canals passing through urban areas polluted due
to untreated domestic sewerage disposal. - Contamination and mining of the ground water.
- Environmental Ecological effect of GBHP on
Indus river between Tarbela Attock.
24- IX. Tubewells Status and Plan
- A) Status
- CCA 100800 acres - Discharge 711
cusec - Irrigated Area 66400 acres (66
intensity) - Annual Expenditure Rs. 224.00
million - Abiana assessed Rs. 13.422
million
25B) Plan
- Dug wells in Peshawar City and Cantonment to be
abandoned/transferred to District Government. - SCARP Tubewells/Dug wells in canal commanded area
to be transferred to the beneficiaries or
abandoned. - Irrigation Tubewells/Dug wells outside the canal
commanded area to be transferred to the
beneficiaries. - Regulation of new tubewells.
26IX. POSITION ON PAK WATER SECTOR
STRATEGY Total estimated cost of the strategy
(2002-2025)
27Mid Term investment Plan (MIPT) 2002-2011
28- Position of NWFP
- The ten years provincial perspective plan
(2001-2011) amounting to Rs. 163,641 million has
not been reflected in the strategy. - Provincial share in the MTIP indicated as Rs
72,558 million is hardly 9 of the total MTIP
which is far short of the requirements. - The projects proposed by the province while
offering comments on the strategy have not been
included. - FATA totally ignored in the report of April,
2002.
29End of Presentation