1Design Development of an integrated ME System
in the Eastern Cape Province (ECMES)
- ME Learning Workshop, Gallarger Estate
- 15 September 2004
- Presenter Herbert Batidzirai
- Authors METTT
2Objectives
- To share the Eastern Cape experiences on ME
development. - To learn from other public-sector wide ME
processes. - To adopt best practice ME protocols and
platforms that will allow inter-provincial
coordination and comparions.
3Summary of presentation
- Provincial planning process.
- Components of ECMES.
- Indicators for PGDP programs.
- Data collection reporting tools.
- Institutional arrangements.
- Capacity development.
- Gantt chart for further development.
- Challenges lessons learnt.
4PGDP as basis for ME
5Mandate
- Request to develop composite ME system through
the PGDP-PMU. - OTP/DG endorsement.
- Cluster support.
- UNDP support.
- Demand for data/infor FOSAD, clusters, OTP,
Legislature, public etc.
6PGDP Framework
7Integrating ME into PGDP programs
8Processes
9Basis for Quantified vision
- Pyramid of purpose.
- Current socio-economic development of the EC.
- National district development strategies.
- Sector studies conducted in the EC.
- UN millennium development goals.
- Projected state non-state resources.
10PGDP Programs
- Context within National Treasury 5-yr, annual
operational plans. - 28 Programs in response to the PGDP framework.
- Clustered programs with lead Depts.
- Bilaterals with all Departments.
- Budget Indibano.
- Budget hearings.
11Characteristics of ME Environment
- No ME systems in 7 Departments
- Multiple ME systems e.g. in DRPW, DoE, DoH.
- No Baseline data generated.
- ME function is not integrated with project
management. - Ill-defined objectives indicators.
- Irrelevant poor quality information generated.
12Characteristics ofME Environment 2
- Impact of most programmes is not known.
- Lack of commitment incentives.
- Poor Horizontal vertical linkages.
- Limited staff capacity.
- No active engagement with data generated.
13Proposed infor. flows (ECMES)
14 - Centralized system (option 1)
- Decentralized system (option 2)
- Dual system (option 3) - ECMES
15Datasets - relationships
16Key ECMES pillars
17Components of ECMES
- Indicators (developed).
- Data collection tools (developed).
- Data reporting tools (developed).
- Database (being developed).
- Socio-economic profile (developed).
- Departmental ME systs (revamp).
- Capacity building (started).
- Reporting, f/back comm.(activated)
18ECMES operational framework
- Clear terms of reference on ME.
- Structures, roles responsibilities
- OTP/PCMU
- METTT
- ECMERG
- BPAT
- Participatory process/bilateral meetings.
- Planning operational process.
- Clusters (X3).
19ECMERG representation
20Objectives of ME integration
- Contribute to the attainment of quantified
objectives of the PGDP. - Improve programme/project management.
- Improve planning projections.
- Improve information gathering, management,
analysis dissemination. - Improve coordination.
21Objectives of ME integration 2
- Increase efficiency capability of ME staff.
- Increase participatory consensual development
processes. - Contribute to the development of accurate,
relevant retrievable data. - Reduce duplication in data collection
management.
22Key Principles
- Results Oriented ME system.
- ECMES builds on existing departmental systems.
- Balance high low objective level indicators.
- Use of SMART practical indicators.
- Collect relevant, manageable, and verifiable data.
23Key principles 2
- Alignment of Depts. PMS to ECMES.
- ECMES is an integral part of the overall project
management portfolio. - ECMES is a dual system (centralized
decentralized) linking all Depts. - The PGDP, ME framework and Departmental
strategies are the basis for the ME plan.
24Key Principles 3
- Emphasis on participatory process.
- The ME plan is an evolving document.?
- Approximately 4 - 10 of the programme budget
should be allocated to ME. - ECMES is a structured learning tool.
- ECMES to use different comm channels .
25Assessment of ME systems
- Questionnaire design based on functional areas of
ECMES. - Bilateral meetings.
- MIS workshop.
- Methodology.
- Rolling assessment.
26Indicators ME plan
- Derived from PGDP programs.
- Logical framework matrix.
- To be complemented by other ME tools being
developed. - METTT vs Depts. Indicators.
- Participatory workshops.
- UNDP, IDPs, Presidency, sectoral indicators.
- ME plan tools, methods appr.
27ME levels
Direct
Risks
28ME matrix
29Data collection management
- Dual system.
- ICT campus network PGITO Council (close to 100
Bisho campus). - Database development.
- ECMES structured unstructured data.
- GIS interface with ECMES.
- Departments responsible for data collection
analysis - Strategic gap analysis, decision balance scores
etc.
30Capacity dev. institutional arrange.
- PCMU in OTP.
- Integrated ME units within Provincial
departments. - Anchor staff in each dept. connected to ECMES.
- Structured capacity development linked to
performance with support from DBSA. - Network/ knowledge learning process.
31Data Comm., Reporting feedback
- PCMU, Clusters, Legislature
- Outreach programs DMs LMs.
- WWW LAN.
- Internal feedback in depts. (formal informal)
- Communications Dept. (OTP)
- Media
- ME newsletter
32Critical reflection
- Feedback to source.
- PCMU, Treasury, Depts., External stakeholders.
- Performance threshold.
- Performance reserve.
- Formation of PPET.