Title: Presentazione di PowerPoint
1CMS RPC production scheme Revised version
Assumptions for phase I (end 2003/start 2004)
Glossary
- PV is devoted to chamber test only and to
bakelite QC - An additional external company (HT) will be
involved in the assembly (under the control of
NA group) - Gap production and quality control remains
mainly with the BA group with some help from the
NA group - Chamber assembly at GT remains with the BA group
only - BA remains as chamber test site and an assembly
sites for RB3 chambers in the first phase.
PV Pavia INFN group NA Naples INFN group BA
Bari INFN group GT General Tecnica
(Frosinone) HT High Tech (Caserta) CERN CERN-ISR
SO Sofia group PU Peking University group
More assumption for phase II (2004/2005)
- SO becomes an assembly and test site for RB3 in
the phase 2 BA site can be considered as back
site for RB3 assembly in case of difficulties - RB1 chambers are built in Italy (GT) and tested
at PV - A way to involve physicists from PU in the RB1
test should be envisaged - RB2 are built at HT and tested at BA.
2RPC chambers production plan phase I
NA group is involved in the RB1/RB2 assembly at
HT and the tests at BA PV group is involved in
the test of chambers RB1 BA group is involved
in the assembly and in the test at BA. BA
group is also involved in the assembly at GT.
CERN
Pavia
Bari
GT
- Assembly
- BA SO 28 RB3
- GT
- HT 33 RB1
- Test
- BA SO 28 RB3
- BA 36 RB4 48 RB2 6 RB4 (2500 mm)
- PV 33 RB1
- BA NA 13 RB2 6 RB4
HT
Napoli
3Chamber to be installed at the end 2003
10
Tutte le camere non classificate out sono da
considerare in. Nelle camere out
lelettronica è verso lesterno, mentre nella
in è verso linterno
4Chamber to be installed at the end 2003
Tutte le camere non classificate out sono da
considerare in. Nelle camere out
lelettronica è verso lesterno, mentre nella
in è verso linterno
5Chamber to be installed at the end 2003
W -1
Tutte le camere non classificate out sono da
considerare in. Nelle camere out
lelettronica è verso lesterno, mentre nella
in è verso linterno
6Chamber to be installed at the beginning of 2004
Tutte le camere non classificate out sono da
considerare in. Nelle camere out
lelettronica è verso lesterno, mentre nella
in è verso linterno
7Chamber to be installed at the beginning of 2004
Tested
W 0
Built
Tutte le camere non classificate out sono da
considerare in. Nelle camere out
lelettronica è verso lesterno, mentre nella
in è verso linterno
8Chamber to be installed at the beginning of 2004
3 bi gap
W -2
-
8
-
out
9
Tested
Built
Tutte le camere non classificate out sono da
considerare in. Nelle camere out
lelettronica è verso lesterno, mentre nella
in è verso linterno
9Summary for phase I installation
Needed Built Tested To
build 48 RB1 15 1
33 24 RB2/2 12
4 12 24 RB2/3
1 0 23 6 RB4
6 48 RB3 20 20
28 12 RB4
12 24 RB4
0 0 24
2080 mm
2500 mm
1500 mm
2000 mm
2080 mm 33
2500 mm 41
1500 mm 40
2000 mm 24
10Chamber production for phase I
2002
2003
2004
GT
Double gaps 20 24 32 32
32 10 32 30 32 24 28
32
24 RB4 (2000 mm)
12 RB2/2 1 RB2/3
2 RB2/2 11 RB2/3
12 RB4 (1.55 m) 6 RB4 (2.5m)
10 RB2/2 12 RB2/3
Single gap ready in GT. Double gap to be assembled
20 RB1
HT
13 RB1
Assemblaggio pilota.
Single gap and double gap to be assembled in GT.
28 RB3
BA
Single gap ready in GT. Double gap to be assembled
11Chamber test in phase I
2004
2003
10 RB2/2 5 RB2/3
12 RB2/2 8 RB2/3
24 RB4 (2000 mm)
BA
28 RB3
2 RB2/2 11 RB2/3 6 RB4 (2500mm) 12 RB4 (1500)
BA NA
PV
20 RB1
13 RB1
12RPC chambers production plan phase II
CERN
- Assembly
- SO 72 RB3
- GT 72 RB1 78 RB4
- HT 72 RB2
- Test
- BA 78 RB4 36 RB2
- PV 72 RB1
- SO 72 RB3
- BA NA 36 RB2
Pavia
Sofia
Bari
GT
HT
Napoli
13Chamber Production in 2004-2005
2004
2005
72 RB1 78 RB4
GT
HT
36 RB2/2 36 RB2/3
72 RB3
SO
BA
Back up for RB3
14 Chamber test in 2004-2005
2004
2005
72 RB1
PV
78 RB4 36 RB2
BA
SO
72 RB3
36 RB2
BA NA
15 ISR
A test bench is being prepared at ISR Limited
test capability (4 chambers) with
cosmics Sampling test with cosmics Extensive
tests on current and rates chamber by chamber 1
physicist 1 technician as minimal team
permanently at ISR starting in June More
technicians during the installation (help from
DT?)
16 Man power
Bari Post doctoral Fellowship
1 Phds
2 Stuff (young!!!) 3 ( 1
in stand by) Stuff ( aged)
3 INFN foreigner fellowship
1 Engineers 2 ( 1 art. 23 from
Sofia) Technician 5
Napoli Stuff
(young!!!) 2 Stuff (
aged) 2 Technician
2 (from pool) Pavia Stuff (young!!!)
2 Stuff ( aged)
1 Technician 2 (from pool)
17Critical issues
GT production of double gaps and chambers not in
parallel Bari chamber test at the moment takes
more time then foreseen. Improve trigger to take
date simultaneously on forward and back part
Pavia the test facility will be ready in the
summer Cern GIF activity will slow down the ISR
preparation. X5 managers have decided to clean au
the area and reinstall experiment during middle
April - middle May!!!
18Work organization
Example of planning for activity at BA and GT
gtgtgtgtgt
Needed manpower for each site
Bari 2 physicist 2 technicians from
Ba Team Pavia 2 physicist 2 technicians
from PV Team GT 1 physicist 1-2
technicians from Ba Team HT 1
physicist 1-2 technicians from Na Team
ISR 1-2 physicist 2 technicians from
BA/NA/PV teams
Bari man power look saturated help from SO for
the RB3 assembly and test. Moreover a more
constant presence of people from Sofia could
free Bari people for ISR work.
At the start up ( first 1-2 months) Bari
expert will participate
19Needed
Bari 12 month-physicist from SO
art. 15 expiring end of year. Absolutely needed
to renew the contract Pavia 6
month-physicist from PU Napoli Roscilli
involved in the cable layout project. Resources
needed to have him at Cern for
a while
20Conclusion