Title: Ashley Lyon. CGSIC. May 7th 2006. European Satellite Servic


1
European Satellite Services Provider EGNOS
Operations Status
  • Ashley Lyon
  • CGSIC
  • May 7th 2006

2
ESSP in EGNOS
  • A centralized management entity for EGNOS ESSP
  • ESSP has been created from a subset of the EOIG
    (EGNOS Operators and Infrastructure Group)
  • ESSP has been founded to become the
  • EGNOS Operator
  • EGNOS Safety of Life Service Provider, for
    example for Civil Aviation

3
EGNOS Operations Consortium
4
EGNOS Timeline
Jan 2005
Jan 2007
Jan 2006
System Operations
System Initial Operations
System Development
System Evolutions
5
EGNOS Services
Jan 2005
Jan 2007
Jan 2006
System Operations
System Initial Operations
System Development
System Evolutions
Open Service
Commercial Services
SoL Service
System and Application Certification ( Safety
Case)
6
Initial Operations
Jan 2005
Jan 2007
Jan 2006
System Initial Operations
7
Initial Operations Ramp-up
  • Start of EGNOS operations
  • by the ESSP Operation Consortium
  • Increase of staff and resources to fully support
    EGNOS operations
  • Facilitate the transfer of knowledge and
    experience from ESA / Industry to Operator
  • Test the operations processes and procedures
  • Deliver remaining training packages to build up
    team capabilities

8
Initial Operations Stabilization
  • Reach nominal EGNOS operations performance
    (started on April 3rd 2006)
  • Stabilise team resource profiles, to support
    EGNOS operations according to the operations
    performance requirements
  • Run nominal maintenance procedures across the
    EGNOS system
  • Complete operations processes and procedure
    testing

9
Initial Operations Qualification
  • Operational qualification of EGNOS system
    operations
  • Demonstrate that EGNOS operations staff, plus
    procedures and documentation, can support EGNOS
    operations performances
  • Provide evidence towards the EGNOS System Safety
    Case with nominal operations
  • Concludes with the Operations Qualification
    Review (OQR) in early 2007
  • Safety of Life service provision planned to
    follow this milestone

10
EGNOS Sites
GPS GLONASS
3 Satellites EGNOS
6 NLES Navigation Land Earth Stations
34 RIMS Ranging Integrity Monitoring Stations
2 Support Facilities
4 MCC Mission Control Centers
EWAN EGNOS Wide Area Network
User Segment
11
EGNOS system handover
  • Full handover of the EGNOS system did not take
    place at ORR
  • A subset of the EGNOS system was provided to
    EGNOS industry
  • 1 CPF, 1 CCF, 3 RIMS (Paris, Toulouse,
    Lappeenranta), 2 NLES
  • EGNOS industry retained IOR-W (PRN 126)
  • ESTB was continued using AOR-E (PRN 120)
  • EGNOS was broadcasting on ARTEMIS (PRN 124) only
  • 1 NLES only due to technical problem with other
    NLES
  • Remaining subset of RIMS
  • 3 CPFs with numerous stability problems

12
Recent changes
  • PRN 120 - AOR-E
  • ESTB operating continuously since 09/06/05
  • Will be used for EGNOS SIS operations as from
    early July 2006
  • PRN 124 ARTEMIS
  • Operated by ESSP consortium since 26/07/2005
  • Software version 0.4.9 currently being broadcast
    since December 2005
  • Swap with PRN 126 mid June 2006 for operations
    mid July 2006
  • PRN 126 IND-W
  • Swap with PRN 126 mid June 2006 for industrial
    testing mid July 2006
  • Limited transmissions over recent months with
    long periods of inactivity

13
System Releases
  • New release 2.0.2 as from mid June 2006
  • Another planned at the end of the year to solve
    CPF common mode failures

14
SIS Availability
15
Operational EGNOS
16
EGNOS System Test Bed
17
Operations User Support Website
  • New ESSP website (www.essp.be) planned in a few
    weeks providing additional information to the
    users per market domain
  • Link to the Operations User Support Web Site
    (already existing on current ESSP website)
  • General information on EGNOS operations.
  • Projection of performances on a weekly basis
    (registered users).
  • Performance information at RIMS sites (registered
    users).
  • EGNOS Subsystem status (restricted).
  • SIS-down alerts by e-mail (registered users)
  • Existence of a Helpdesk (already existing on
    current ESSP website)

18
EGNOS Operations Website Services
19
Information
ESSP Avenue Louise 240 1050 Brussels BELGIUM Telep
hone 32 (0)2 641 17 50 Fax 32 (0)2 641 17
59 Ashley.Lyon_at_essp.be
More about EGNOS www.essp.be www.esa.int/navigati
on