Title: WashingtonBritish Columbia Border Region Traveler Information Systems
1Washington-British ColumbiaBorder Region
Traveler Information Systems
- Gordon RogersIMTC - Whatcom Council of
Governments - Transportation Border Working GroupJune 10,
2003Burlington, Vermont, U.S.A.
gordon_at_wcog.org
2Introduction
- International Mobility and Trade Corridor Project
- The Cascade Gateway
- Border-region needs for traveler information
- Trip planning cameras and historical data
- Driver information
- ATIS Border delay/other information
- ATIS details
- Integration of ATIS projects through IMTC
- Construction delay, re-routing
- Project benefits
- International and multi-agency implementation
issues and solutions
3Peace Arch Douglas Pacific Highway Lynden-Aldergro
ve Sumas-Huntingdon
4Cascade Gateway Traffic Volume
5IMTC
- Trade
- Transportation
- Tourism
- Infrastructure
- Information Technology
- Operations
6Needs for Traveler Information
- Trip planning.
- Shortest trip-time among proximate
ports-of-entry. - Construction delay.
- Advance notification.
- Real-time routing advice.
7Trip Planning -- Cameras
8(No Transcript)
9Historical Wait-time Data
10Peace Arch or Pacific Highway?
?
SURREY, BC
Pacific Highway
Peace Arch
, WA
?
11NB Save 45 minutes at Pac Hwy.SB Save 8
minutes at Peace Arch.
PA.25 minPH.37 min
SURREY, BC
Pacific Highway
Peace Arch
, WA
PA.55 minPH.10 min
12WSDOT ATIS Project
- Planning started in 1997
- Funded by WSDOT
- Scope refined in 2000 Now part of larger
project. - ATIS, traffic information cameras, advisory
radio. - Delays encountered negotiating use of existing
license-plate readers for queue-length
estimation. - Current Status Signs installed, BC installing
loops for sections of northbound approach in
Canada.
13(No Transcript)
14BC ATIS Project
- Funded by US FHWA Border Program, BC MoT,
Transport Canada FY 2001 - Project delivery integrated with WSDOT project
via IMTC. - Decision to use loop-detectors for queue
detection. - BC managing entire loop installation project
(with Canadian and US contractors)
15BC ATIS Project Area View
Vancouver
99
8th Ave
15
CAN POE
US POE
Primary inspection
Seattle
16BC ATIS Project Peace Arch Close-up
17Approach to US Primary at Peace Arch POE Schematic
N
18Wait-time Estimation Method
- Loop detectors at inspection booth.
- Sense presence of car operation of booth.
- Estimate service rate.
- Loop detectors placed at intervals in approach
lanes. - Detect low-resolution queue length (by road
segment between loops) - Loops beyond queue-end detect arrival rate.
- Interpolate estimated queue length.
- Wait-time (queue length) x (avg. service time.)
19Wait-time Estimation
KEY
Closed
Open primary booth
Closed
Closed primary booth
Closed
Car
Closed
ATIS loop detector
48 sec.
72 sec.
Closed
(15 sec.)
NEXUS
Average service time
60 sec.
Estimation Queue length is 26 cars. Service
rate is 60 seconds per car. Estimated wait time
(26 cars) (60 seconds) 26 minutes
20Information Dissemination
VMS-271 Birch Bay Lynden Rd.
21Construction Delay Information
VMS-261 Slater Rd.
22Other ATIS Benefits
- Trip planning
- Historical data
- Traffic volumes
- Arrival rates
- Wait times
- Queue lengths
- Staffing levels
23Implementation Challenges
- Binational project integration
- Binational funding arrangements
- U.S. and Canadian construction firms
- Permitting among multiple agencies,
jurisdictions, and countries - WSDOT, BC MoT, GSA, CCRA, International Boundary
Commission, NEPA, SEPA - Title 23 U.S.Code
24Future Issues Questions
- Drivers perceptions of reliability.
- System effects.
- Degree of error.
- Exit processing?U.S. V.I.S.I.T
- Emergency management
- Amber alert system
- What will it do? How will we know?
- Performance measures
25Construction Delay Rerouting Information
- SHIP
- BIF
- WSDOT/FHWA
- Facility replacements
- US VISIT outbound facilities?
26Coming Soon to the Cascade Gateway
27Estimated construction periodsSubject to change.
281. Hwy 15 99 ATIS
292. Hwy 15 truck lane
1. Hwy 15 99 ATIS
307. Hwy 15 88th Ave.
9. 8th Ave
8. Hwy 99/8th Ave IC
4. Hwy 15 NEXUS lane
5. Hwy 11 truck staging area
2. Hwy 15 truck lane
3. Hwy 99 NEXUS laneextension.
6. Douglas temporary building
1. Hwy 15 99 ATIS
?. Entry-Exit Data SystemOutbound Booths
317. Hwy 15 88th Ave.
8. Hwy 15/8th Ave IC
9. 8th Ave
8. Hwy 99/8th Ave IC
4. Hwy 15 NEXUS lane
5. Hwy 11 truck staging area
2. Hwy 15 truck lane
3. Hwy 99 NEXUS laneextension.
6. Douglas temporary building
11. Douglas perm. building
1. Hwy 15 99 ATIS
?. Entry-Exit Data SystemOutbound Booths
327. Hwy 15 88th Ave.
8. Hwy 15/8th Ave IC
9. 8th Ave
8. Hwy 99/8th Ave IC
4. Hwy 15 NEXUS lane
12. Hwy 13 truck climbing lane
5. Hwy 11 truck staging area
2. Hwy 15 truck lane
3. Hwy 99 NEXUS laneextension.
6. Douglas temporary building
11. Douglas perm. building
14. WA SR 9 upgrade
1. Hwy 15 99 ATIS
13. WA SR 543
16. I-5 Interchanges at Blaine
?. Entry-Exit Data SystemOutbound Booths
15. WA SR 539
337. Hwy 15 88th Ave.
8. Hwy 15/8th Ave IC
9. 8th Ave
8. Hwy 99/8th Ave IC
4. Hwy 15 NEXUS lane
12. Hwy 13 truck climbing lane
5. Hwy 11 truck staging area
2. Hwy 15 truck lane
17. New Aldergrove Facility (?)
3. Hwy 99 NEXUS laneextension.
6. Douglas temporary building
11. Douglas perm. building
14. WA SR 9 upgrade
1. Hwy 15 99 ATIS
13. WA SR 543
16. I-5 Interchanges at Blaine
?. Entry-Exit Data SystemOutbound Booths
15. WA SR 539
/11
347. Hwy 15 88th Ave.
8. Hwy 15/8th Ave IC
9. 8th Ave
8. Hwy 99/8th Ave IC
4. Hwy 15 NEXUS lane
12. Hwy 13 truck climbing lane
5. Hwy 11 truck staging area
2. Hwy 15 truck lane
17. New Aldergrove Facility (?)
3. Hwy 99 NEXUS laneextension.
6. Douglas temporary building
11. Douglas perm. building
14. WA SR 9 upgrade
1. Hwy 15 99 ATIS
13. WA SR 543
16. I-5 Interchanges at Blaine
?. Entry-Exit Data SystemOutbound Booths
15. WA SR 539
357. Hwy 15 88th Ave.
8. Hwy 15/8th Ave IC
9. 8th Ave
8. Hwy 99/8th Ave IC
4. Hwy 15 NEXUS lane
12. Hwy 13 truck climbing lane
5. Hwy 11 truck staging area
2. Hwy 15 truck lane
17. New Aldergrove Facility (?)
3. Hwy 99 NEXUS laneextension.
6. Douglas temporary building
11. Douglas perm. building
14. WA SR 9 upgrade
1. Hwy 15 99 ATIS
13. WA SR 543
18. U.S. Peace Arch Facility
16. I-5 Interchanges at Blaine
?. Entry-Exit Data SystemOutbound Booths
15. WA SR 539
367. Hwy 15 88th Ave.
8. Hwy 15/8th Ave IC
9. 8th Ave
8. Hwy 99/8th Ave IC
4. Hwy 15 NEXUS lane
12. Hwy 13 truck climbing lane
5. Hwy 11 truck staging area
2. Hwy 15 truck lane
17. New Aldergrove Facility (?)
3. Hwy 99 NEXUS laneextension.
6. Douglas temporary building
11. Douglas perm. building
14. WA SR 9 upgrade
1. Hwy 15 99 ATIS
13. WA SR 543
18. U.S. Peace Arch Facility
16. I-5 Interchanges at Blaine
?. Entry-Exit Data SystemOutbound Booths
15. WA SR 539
377. Hwy 15 88th Ave.
8. Hwy 15/8th Ave IC
9. 8th Ave
8. Hwy 99/8th Ave IC
4. Hwy 15 NEXUS lane
12. Hwy 13 truck climbing lane
5. Hwy 11 truck staging area
2. Hwy 15 truck lane
17. New Aldergrove Facility (?)
3. Hwy 99 NEXUS laneextension.
6. Douglas temporary building
11. Douglas perm. building
14. WA SR 9 upgrade
1. Hwy 15 99 ATIS
13. WA SR 543
18. U.S. Peace Arch Facility
16. I-5 Interchanges at Blaine
?. Entry-Exit Data SystemOutbound Booths
15. WA SR 539
387. Hwy 15 88th Ave.
8. Hwy 15/8th Ave IC
9. 8th Ave
8. Hwy 99/8th Ave IC
4. Hwy 15 NEXUS lane
12. Hwy 13 truck climbing lane
5. Hwy 11 truck staging area
2. Hwy 15 truck lane
17. New Aldergrove Facility (?)
3. Hwy 99 NEXUS laneextension.
6. Douglas temporary building
11. Douglas perm. building
14. WA SR 9 upgrade
1. Hwy 15 99 ATIS
13. WA SR 543
18. U.S. Peace Arch Facility
16. I-5 Interchanges at Blaine
?. Entry-Exit Data SystemOutbound Booths
15. WA SR 539
39Other Cascade Gateway ITS
- CVO
- WIM
- E-seal
- CVISN
- FAST
- NEXUS
40NO EXIT SEEK OTHER MODES
Thank you. Travel safely.
gordon_at_wcog.org