Title: Antiproton source startup report
1Antiproton source startup report
- Bill Ashmanskas
- Dec 17, 2004
Will not cover Lots of shutdown activity
completed safely on time by many
people http//www-bdnew.fnal.gov/pbar/documents/A
ugust20200420shutdown20update2011-15-04.pdf
Detailed analysis of FY04 performance and FY05
stacking improvements/studies planned http//beam
docs.fnal.gov/DocDB/0014/001485/001/Run2comm120204
.pdf
2Startup has gone well so far
You are here
Shot 3821 Dec 7
Pilot shot to MI Dec 6
First beam Nov 28
3Stacking at close to August 2004 levels
Red Aug 1-23 Blue Dec 9-16
4Shots before vs. after shutdown
5Recent progress
- P1,P2,AP1,AP3 corrector strengths re-measured
- Software for Debuncher improvements tested out
- Running wave beam prep component centering
- Debuncher transverse gain ramping tuned up
- emittances 25-30 smaller at 2 seconds
- 4-8 GHz PU cryo amps cleanly measure cooling
progress - Instrumentation
- Forward pbars visible on all D/A SEMs
- Forward pbars seen (when bunched) on D/A BPMs
- Progress with accumulator flying wires
- New AP2 BPM board has recorded its first beam
signals - Debuncher barrier bucket AWG tested OK
6Debuncher vertical emittance vs time in cycle
7Scanning Debuncher transverse cooling gains
Horizontal emittance vs time in cycle
Vertical emittance vs time in cycle
8Recent glitches
- Dec 4 ALQ power supply ribbon cable failed
- Dec 7 AISEP1 power supply card failed
- Dec 12 AR1LCAP incident
- Protection implemented against huge bucket areas
- Dec 4 16 accumulator damper ENI amps failed
- Dec 17 no reading on TOR910 during shot setup
- Numerous cases of wrong saved settings restored
when switching to/from stacking
9Upcoming work
- Optimize stacktail phasing and gains with beam
- Continue to improve Debuncher apertures
- Follow through on plans for D/A and AP2 lines
- Get more of our stacking diagnostics read out /
logged all of the time - Expand the range of tuning/studies that can be
done while stacking - Given good knobs and good measurements of
progress, operators can do magic - Stack at 18 E10/hr ASAP
10(No Transcript)