Running wave; beam prep; component centering. Debuncher ... New AP2 BPM board has recorded its first beam signals. Debuncher barrier bucket AWG tested OK ... – PowerPoint PPT presentation

Number of Views:58
Avg rating:3.0/5.0
Slides: 11
Provided by: beamsdi
Category:

less

Transcript and Presenter's Notes

Title: Antiproton source startup report


1
Antiproton source startup report
  • Bill Ashmanskas
  • Dec 17, 2004

Will not cover Lots of shutdown activity
completed safely on time by many
people http//www-bdnew.fnal.gov/pbar/documents/A
ugust20200420shutdown20update2011-15-04.pdf
Detailed analysis of FY04 performance and FY05
stacking improvements/studies planned http//beam
docs.fnal.gov/DocDB/0014/001485/001/Run2comm120204
.pdf
2
Startup has gone well so far
You are here
Shot 3821 Dec 7
Pilot shot to MI Dec 6
First beam Nov 28
3
Stacking at close to August 2004 levels
Red Aug 1-23 Blue Dec 9-16
4
Shots before vs. after shutdown
5
Recent progress
  • P1,P2,AP1,AP3 corrector strengths re-measured
  • Software for Debuncher improvements tested out
  • Running wave beam prep component centering
  • Debuncher transverse gain ramping tuned up
  • emittances 25-30 smaller at 2 seconds
  • 4-8 GHz PU cryo amps cleanly measure cooling
    progress
  • Instrumentation
  • Forward pbars visible on all D/A SEMs
  • Forward pbars seen (when bunched) on D/A BPMs
  • Progress with accumulator flying wires
  • New AP2 BPM board has recorded its first beam
    signals
  • Debuncher barrier bucket AWG tested OK

6
Debuncher vertical emittance vs time in cycle
7
Scanning Debuncher transverse cooling gains
Horizontal emittance vs time in cycle
Vertical emittance vs time in cycle
8
Recent glitches
  • Dec 4 ALQ power supply ribbon cable failed
  • Dec 7 AISEP1 power supply card failed
  • Dec 12 AR1LCAP incident
  • Protection implemented against huge bucket areas
  • Dec 4 16 accumulator damper ENI amps failed
  • Dec 17 no reading on TOR910 during shot setup
  • Numerous cases of wrong saved settings restored
    when switching to/from stacking

9
Upcoming work
  • Optimize stacktail phasing and gains with beam
  • Continue to improve Debuncher apertures
  • Follow through on plans for D/A and AP2 lines
  • Get more of our stacking diagnostics read out /
    logged all of the time
  • Expand the range of tuning/studies that can be
    done while stacking
  • Given good knobs and good measurements of
    progress, operators can do magic
  • Stack at 18 E10/hr ASAP

10