Limited Streamer Tubes - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Limited Streamer Tubes

Description:

The Limited Streamer Tube (LST) has been used in experiments around the world ... The tube will be built at Pol Hi Tech in Italy and after extensive testing will ... – PowerPoint PPT presentation

Number of Views:63
Avg rating:3.0/5.0
Slides: 10
Provided by: WilliamR166
Category:
Tags: limited | streamer | tube | tubes

less

Transcript and Presenter's Notes

Title: Limited Streamer Tubes


1
Limited Streamer Tubes
  • Mechanical Design Review

William Sands , Princeton
University, 10-21-03
2
Overview
  • The Limited Streamer Tube (LST) has been used in
    experiments around the world with great success
    as a particle detector. This is not a new
    technology and its proven effectiveness in other
    experiments was a leading reason for the LST
    being chosen for RPC replacement in BaBar.
  • The individual LST will be referred to as a tube
    and an assembled set of two or more will be
    referred to as a module.
  • The tube will be built at Pol Hi Tech in Italy
    and after extensive testing will be sent to the
    U.S. for assembly at Ohio State University and
    Princeton University.
  • It will take 1164 tubes to make 564 modules to
    populate the needed layers in all sextants.

3
Basic LST Components
4
Basic Handling
  • The tubes and modules will always be
    handled out of boxes and fixtures with there
    x-axis vertical for greatly increased strength
    against deflection. Although they are very long
    and made of PVC they are quite robust especially
    as a module.

5
Assembly of Modules
  • Modules will be assembled in fixtures such as
    shown here. The individual parts will be bonded
    with a 2 part epoxy made by Shell ,using Epon
    resin 815C and Epi-Cure 3140 as the hardening
    agent.

6
Assembly Procedure Diagram
The PHI strip is placed in the fixture and
epoxy is applied, then epoxy is applied to the
inner sides of the tubes and rib prior to being
set on the PHI strip and hold downs placed on.
After curing the fixture is pivoted vertical for
module removal.
The stainless rib is placed in the module to
assist in the rigidity of the module when the
x-axis is in the horizontal position in the
magnet. The rib will help overcome any anomalies
in the magnet steel.
7
Shipping ,Testing and Installation
Box
  • From the gluing fixture the module is moved
    to a specialized box deemed the H-box because of
    its shape. The box will be constructed in Italy
    and shipped to the U.S. with tubes inside and
    then be able to accept modules for testing and
    shipping.

8
H-Box Properties
As long as only the top is removed the H-Box
remains very resistant to deflection and prop
twist. After testing one side the top is replaced
and the box is flipped to access the other side.
The aluminum foil is in place for testing
purposes.
9
Conclusion
  • Spare tubes and modules will be built but
    with extensive testing and quality control these
    should be at a minimum.
  • The overall structure of the tubes and the
    modules are simple and robust making them a
    reliable detector for BaBar.
Write a Comment
User Comments (0)
About PowerShow.com