Summary of MAG High Capacity Transit Study - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

Summary of MAG High Capacity Transit Study

Description:

Existing Freight Operations Limit Passenger Operation. Right-of-Way ... Annual Operating Cost with Locomotive (millions of. 2002 $) 12,034. 4,722. 6,471. 2,235 ... – PowerPoint PPT presentation

Number of Views:39
Avg rating:3.0/5.0
Slides: 20
Provided by: GTy
Category:

less

Transcript and Presenter's Notes

Title: Summary of MAG High Capacity Transit Study


1
Summary of MAG High Capacity Transit Study
  • June 2003
  • Commuter Rail Summary

2
Comparison of Rail Technology and Peer Systems
Comparison
3
High Capacity Transit Alternatives
4
Commuter Rail
Detailed Review
5
MAG Region Rail Status
6
BNSF Existing Conditions
  • No Existing Signal System
  • MAX Speed 49 MPH
  • 100 Foot Right-of-Way
  • 4-5 Trains Daily

7
BNSF Commuter Rail Potential
  • Existing Freight Operations Limit Passenger
    Operation
  • Right-of-Way is Suitable for Second Track
  • Upgrades/Changes Desired for Implementing
    Commuter Rail
  • New Signals
  • Second Track
  • Lengthen Sidings
  • Reduce Main Track Switching Activity

8
UP Existing Conditions
  • Main Track is Signalized
  • MAX Speeds 15 to 60 MPH
  • 100 Foot Right-of-Way
  • 6 Daily Trains

9
UP Commuter Rail Potential
  • Requires Coordination of Schedules with Freight
    Traffic
  • Future Upgrades
  • Replace Signal Systems
  • Upgrade Rails
  • Replace Ties
  • Industrial Branches Require
  • Signals
  • Protected Grade Crossings

10
Operational Issues
  • Ownership
  • Agency Purchases Rail Line
  • Agency Leases Rights
  • Freight/Passenger Capacity Conflicts
  • Scheduling
  • Dispatching
  • Track Capacity Enhancements
  • Grade Crossings
  • Noise Impacts
  • Track Noise and Whistle Noise

11
Operational Issues (cont.)
  • Capital Needs
  • Track Enhancements
  • Stations
  • Rolling Stock
  • Station Impacts
  • Traffic Issues
  • Governance Structures
  • Local Transit Agency
  • Joint Powers Authority
  • Regional Planning Agency

12
Commuter Rail
  • Phase 1 Service
  • 3 Peak Period Trains, inbound a.m., outbound p.m.
  • Phase 3 Service
  • 15 minute peak service inbound
  • 30 minute peak service outbound
  • Off-peak service (30 to 60 minute frequency)
  • Reverse commute
  • Intermediate phasing will vary by corridor,
    ridership, funding

13
Commuter Rail Phasing
14
Dallas Area Rapid Transit (DART) Subsidy per
Passenger
Source Dallas Area Rapid Transit (DART) FY 2005
Business Plan FY 02 FY 04 Actual FY 05B
Budget FY 06P Projected
15
Commuter rail study update
  • Review of peer commuter rail systems
  • Rail conditions operations
  • Statewide and region
  • Freight
  • Ridership projections
  • Capital operating costs
  • Implementation steps

16
Possible Next Steps
  • Coordinate with ADOT on statewide strategy.
  • Commuter rail
  • Freight issues
  • Convene regional stakeholders.
  • Develop draft scope of work to update commuter
    rail study.
  • Issue RFP and select consultant.
  • July 2007 begin work.

17
Dallas Trinity Railway Express
Source Dallas Area Rapid Transit (DART) FY 2005
Business Plan FY 02 FY 04 Actual FY 05B
Budget FY 06P Projected
18
Dallas Trinity Railway Express Key Performance
Indicators
Source Dallas Area Rapid Transit (DART) FY 2005
Business Plan FY 02 FY 04 Actual FY 05B
Budget FY 06P Projected
19
Dallas Trinity Railway Express FY 2005 Cost Model