2TOPIC
- ? GENERAL
- ? BALL GUARD AOTCS HOW DOES IT WORK
- ? FAMILY OF BALL GUARD AOTCS ACCESSORIES
- ? CONDENSER TUBES CONDITION BEFORE AND AFTER BALL
GUARD AOTCS OPERATION - ? PROJECT REFERENCE
3GENERAL
4AIR CONDITIONING STANDARD IN BUILDING BY DEDP.
- HOTEL
- DEPARTMENTSTORE
- HOSPITAL
- COMMERCIAL BUILDING
NOTE DEDP DEPARTMENT OF ENERGY DEVELOPMENT
AND PROMOTION
5HOTEL
Light 13
Other 19
A/C Systems 68
6DEPARTMENT STORE
Light 22
Other 18
A/C Systems 60
7HOSPITAL
Light 21
Other 21
A/C Systems 58
8COMMERCIAL BUILDING
Light 24
Other 16
A/C Systems 60
9AIR CONDITIONING STANDARD IN BUILDING BY DEDP.
10AIR CONDITIONING STANDARD IN BUILDING BY DEDP.
11MAIN EQUIPMENT OF A/C SYSTEMS
- CHILLER
- AIR HANDLING UNIT
- COOLING TOWER
- CIRCULATING WATER PUMP
Cooling Tower
Condenser Water Pump
Chiller
Chill Water Pump
Air Handling Unit
12MAIN EQUIPMENT OF A/C SYSTEMS
WATER CHILLER
AIR HANDLING UNIT
COOLING TOWER
CIRCULATING WATER PUMP
13COOLING TOWER CONDITION
- OPEN SYSTEM
- TO COLLECT IMPURITIES FROM INVIRONMENTAL
- CALL FOULING
- MAJOR FOULING MECHANISM CONSIST OF
- - PRECIPITATION FOULING ( SCALING )
- - BIOLOGICAL FOULING ( SLIME )
- - CORROSION FOULING
- - PARTICULATE FOULING ( SEDIMENTATION )
14FOULING EFFECT ON CONDENSER SYSTEM
SCALE ON CONDENSER TUBES
FOULIING OF CONDENSER WATER
SCALE ON FIILLER OF COOLING TOWER
SCALE ON CONDENSER PIPE
SCALE ON CONDENSER PUMP
SCALE FROM FILLER OF COOLING TOWER
15REFRIGERANT SIDE CONDITION
16EFFECT OF FOULING ON CHILLER
17AIR-WATER-REFRIGERANT TEMPERATURE RELATION IN
CHILLER
18NEW CONDENSER TEMPERATURE CONDITION
- AT FULL LOAD OPERATION
- CONDENSER WATER TEMP.
INLET 90 deg. F. - TEMP. OUTLET 100 deg. F.
- Tout - Tin 10
deg. F. - Refrigerant Temp. 103 deg. F.
- Condensing Approach Tref. - T out
- 103 -
100 - 3
deg. F. -
19CONDENSER TEMPERATURE CONDITION WITH FOULING
- AT FULL LOAD OPERATION
- CONDENSER WATER
TEMP. INLET 90 deg. F. - TEMP. OUTLET 97 deg. F.
- Tout - Tin 7
deg. F. - Refrigerant Temp. 107 deg. F.
- Condensing Approach Tref. - T out
- 107 -
97 - 10
deg. F.
20FOULING RESISTANCE VS. TIME Water condition -
450 ppm Caco3 / 95 deg.f., - Velocity 5 ft /
sec. Result - Constant fouling resistance(
0.001 )/ 900 hrs. Additional chemical to water
- 2,000 ppm Caco3 / 110 deg f. - Velocity 5
ft / sec. Result - Quickly fouling resistance
increase ( 0.006 )/ 100 hrs
21 kw/ton Record ( Before After Hand Brush
Cleaning )Novotel Lotus Hotel
22HEAT TRANSFER SURFACE REQUIRED TO OFFSET FOULING
23ENHANCED TUBE GEOMETRIES
24BALL GUARD AOTCS HOW DOES IT WORK
25BALL GUARD ON-LOAD TUBE CLEANING SYSTEM
26HOW DOES IT WORK
INJECTION CYCLE
COLLECTION CYCLE
27FAMILY OF BALL GUARD AOTCS ACCESSORIES
28FAMILY OF BALL GUARD
29Flow diagram model ABGS-3C-1BSxx For 3-chillers,
One Ball strainer and Separator
30Ball collection system model ABGS-3C-1BSxx For
3-chillers, One Ball strainer and Separator
31Piping work model ABGS-3C-1BSxx For 3-chillers,
One Ball strainer and Separator
32CONDENSER TUBES CONDITION BEFORE AND AFTER
BALL GUARD AOTCS OPERATION
33CONDENSER TUBES BEFORE BALL GUARD
OPERATIONJOMTIEN PALM BEACH RESORT ( 19/7/97
)CHILLER TRANE 550 TON
34CONDENSER TUBES AFTER 3 MONTHS BALL GUARD
OPERATION
35KW/TON COMPARISON BEFORE AFTER BALL GUARD
OPRATION
36PROJECT REFERENCE
37PROJECT REFERENCE
38BALL GUARD ON-LOAD TUBE CLEANING
SYSTEM SHINAWATRA UNIVERSITY
CHILLER YORK 380 TON 2 SET CHILLER YORK 190
TON 2 SET CHILLER MANAGER CONTROLLED
CHILLER YORK 380 TON
39BALL GUARD ON-LOAD TUBE CLEANING
SYSTEM SHINAWATRA UNIVERSITY
MODEL ABG-4C-4BS08 CHILLER MANAGER CONTROLLED
BALL STRAINER INSTALLATION
CONTROL PANEL
CONTROL PANEL DETAILS
BALL STRAINER
COLLECTION SIGHT GLASS
40BALL GUARD ON-LOAD TUBE CLEANING SYSTEM SHINWATRA
TOWER 3
BALL GUARD MODEL ABG-3C--3BS14
BALLSTRAINER MODEL BS-14
CHILLER TRANE 900 TON 3 SET CHILLER TRANE 300
TON 3 SET CHILLER MANAGER CONTROLLED
BALL GUARD MODEL ABG-3C--3BS08
BALLSTRAINER MODEL BS-08
41BALL GUARD ON-LOAD TUBE CLEANING SYSTEM SHINWATRA
TOWER 3
MIMIC DIAGRAM
SPONGE BALLS IN BALL COLLECTORSEE THROUGH SIGHT
GLASS
BALL GUARD MODEL ABG-3C--3BS08
CONTROL PANEL DETAILS
BALL GUARD CONTROL PANEL
GRISWOLD SOLID SEPERATOR MODEL GS-04 T