Title: Sustainment Center of Excellence
1CASCOM and the U.S. Army Training Support Center
- Sustainment Center of Excellence
- (Ordnance-Quartermaster-Soldier Support
Institute-Transportation) - Training Support System Review
- Mission Essential Review
- (TSSR / MER)
- 9 December 2008
- Quarterly Update and Planning
Training Support The Armys Advantage
2Agenda
- Purpose
- Issues Update (by exception)
- BCTSP
- SRP
- STSP
- MER Reset
- Key Planning Milestones
- Way Ahead
- Questions / Discussion
3Purpose
- To provide CASCOM/SCoE Proponent leadership with
an update on Training Support System
Review/Mission Essential Requirements Review
(TSSR/MER) issues captured during the May 2008
SCoE TSSR/MER and establish the way ahead for the
FY09 TSSR/MER.
4CASCOM and the U.S. Army Training Support Center
- Sustainment Center of Excellence
- BATTLE COMMAND TRAINING SUPPORT ISSUES
Training Support The Armys Advantage
4
11/10/2009
5TSSR Issue Sheet SCoE BC Training Strategy
As of 24 Nov 08
07 ISSUE UPDATE
- Lead
- SCoE Chris Johnson, christopher.johnson_at_us.army.m
il - CTD Mr. Dave Bowman, david.bowman_at_us.army.mil
Issue SCoE BC Training Strategy
(07-01-BC-SCoE) Discussion The current SCoE BC
training strategy addresses pooling of assets to
support multiple-like BC requirements across the
installation in support of institutional and
operational tenant unit requirements
(Lee/Eustis). There is a disconnect between the
VCSA guidance (ACP Update on 17 Apr 08) and the
emerging BCTS as to the responsibilities of CoEs
in training Operational Forces. Currently
DAMO-TRS has only validated Installation
(Lee/Eustis) requirement SCoE support of POIs
(Lee/Eustis/Jackson (future)) DAMO-TR has not
resourced requirement to provide pre-deployment
training support to TSC, ESC etc.
- STATUS Re-done draft BCTS is out for AO level
staffing before being resubmitted. Institutions
will have some limited Operational Training
responsibility as directed by TRADOC.
- Assistance necessary No
- Discussion
G
Recommendation/Timeline TRADOC, SCoE
coordinate logistics community BC training
requirements with FORSCOM, FIRST Army, USARC and
NGB. Next, provide comments to draft BCTS.
CAC-T consider all comments on draft BCTS obtain
approval of BCTS from DA G3.
5
6TSSR Issue Sheet BCTC Facility
As of 24 Nov 08
07 ISSUE UPDATE
- Lead DAMO-TRS (NSC-TCID for DAMO-TRS, Mr Dan
Buchberg dan.buchberg_at_us.army.mil - Support SCoE, Chris Johnson
- Issue BCTC Facility (07-02-BC-SCoE)
- Discussion
- Programmed MCA (Log U, PN64349) is a
projected SCoE BSC facility to support school
POIs. - BCTC is for tenant Operational units on Ft
Lee and Ft Eustis. It is not a SCoE BSC
facility. New FY 15 Operational BCTC MCA project
competing in FY10-15 POM. Based on DP 91, BCTC
Design Board consult with garrison and units to
determine operational facility requirement.
- STATUS BCTC requirement for Fort Lee was not
validated on the FY10-15 POM. Will re-compete in
FY12-17 POM. CAC-T, CTD and NSC reviewed the BCTC
facility requirements for training ESC/BSC type
units. Recommendation of increased building size
resulted and was briefed to Mr. Moore.
- Assistance necessary No
- Discussion Will re-compete in FY12-17 POM.
Y
Recommendation/Timeline Awaiting final POM
determination. SCoE provide minimal required BC
and C2 system training for operational units
tenant on Lee/Eustis until BCTC is operational.
6
7TSSR Issue Sheet Constructive SIM/STIM ERF-L
As of 24 Nov 08
07 ISSUE UPDATE
- Lead
- SCoE Chris Johnson, christopher.johnson_at_us.army.m
il
- Issue Constructive SIM/STIM ERF-L
(07-04-BC-SCoE) - Discussion
- ERF-L provides fidelity for brigade and below
sustainment operations - ERF-L may not be appropriate for
- Leaders heading to EAB units ISO theater-level
operations. - SSI for personnel and financial
managementreplacements postal operations, etc. - Other schools that fall under SCoE and that might
require LOD (JAG, Chaplain, Maritime)
- STATUS NSC currently conducting CoE/Institution
Requirements Study for Sim/Stim. This study will
reevaluate the requirement of ERF-L. In addition
Full Spectrum LOD will complete BETA test in Feb
09 and may be suitable for fielding in secong
half 09.
- Assistance necessary No
- Discussion
G
Recommendation/Timeline Next, NSC (CD, OPS,
LESD) and SCoE analyze POI use cases to determine
if existing sim/stim capability ( ERF-L or other)
meets POI requirements. If other capability is
required, must include PEO STRI, TCM Gaming
Technology, etc. in the analysis.
7
8TSSR Issue Sheet Constructive SIM/STIM Fielding
As of 24 Nov 08
08 ISSUE UPDATE
- Lead
- NSCMAJ Spencer Norris, NSC-OPS,
spencer.norris_at_us.army.mil
- Issue Constructive SIM/STIM Fielding
(08-01-BC-SCoE) - Discussion
- SCoE BSC has been identified to receive ERF-L.
Fielding is tentatively planned for Dec 08.
Intent is for PEO STRI to drop-ship HW to site
prior to fielding. Operators will be trained at
NSC. - However, SCoE doesnt want ERF-L fielding until
new BSC is completed and operators are available
for training. SCoE currently runs JDLM out of QM
school and CLC3 this is adequate for current
training.
Issue on track CLOSED
- STATUS Fielding for all CoEs is now due to
occur in Apr/May 2010. No impact statement from
SCoE has been received. Fielding fall in line
with reviewed sim/stim manning to operate ERF.
- Assistance necessary No
- Discussion
G
Recommendation/Timeline ERF Fielding to be
conducted as scheduled in FY 10.
8
9TSSR Issue Sheet LVC Training Connectivity
As of 28 Aug 08
07 ISSUE UPDATE
- Lead
- SCoE Chris Johnson christopher.johnson_at_us.army.mil
- Issue LVC Training Connectivity (07-06-BC-SCoE)
- Discussion
- SCoE should consider future requirements for
integrated LVC training. Should not consider LVC
just because it is technologically feasible need
to determine the value added for BC training. - IOT conduct that training, consider the
potential network capability to connect Digital
Ranges, Battle Labs, BCTC, and/or School houses
(local distant). Considerations should also
include Video, Wireless, Voice over IP, Video
Teletraining and Teleconferencing, Voice
communications nets, Digital nets, Secure and
Classified nets and Satellite coverage.
- Assistance necessary No
- Discussion
G
Recommendation/Timeline SCoE examine the BC
training strategy and current capabilities
available IOT identify additional capabilities
required to fully satisfy any future LVC training
requirement.
9
10TSSR Issue Sheet Gaming Technology in POIs.
08 ISSUE UPDATE
As of 24 Nov 08
- Lead
- Pete Thibodeau, pete.thibodeau_at_us.army.mil
- Support TCM Gaming (Sheldon Parks,
Sheldon.parks_at_us.army.mil)
Issue Gaming Technology (GT) to enhance or fill
training gaps in institutional POIs.
(08-02-BC-SCoE) Discussion Initial focus of
this discussion is AIT however, GT capabilities
should be applicable beyond AIT and SCoE. Some
CoE POI training gaps are thought to have a
gaming solution. These gaps need to be clearly
identified before determining if they are
suitable for GT. Examples Lighting the M2
burner is a sequenced operation. GT could show
process of lighting M2 burner and negative
consequences of using improper procedures. Create
situational vignette with a specific problem to
solve (e.g., supply sergeant with weapon turned
in for repair). Need an authoring SW-based
capability that allows SCoE to easily create and
edit scenarios/vignettes to satisfy SCoE training
objectives. Would require a multi-media device
(e.g., laptop, PDA, Game-boy).
- STATUS Game After Ambush (GAA) is due to be
announced 2 Dec 08.
- Assistance necessary No
- Discussion
G
Recommendation/Timeline TCM-G have tentatively
scheduled a gaming demo of GAA for the SCoE
during the TSSR in May 09. Fielding is planned
for Sep 09 which will include training and the
Toolkit.
10
11CASCOM and the U.S. Army Training Support Center
- Sustainment Center of Excellence
- SUSTAINABLE RANGE PROGRAM ISSUES
Training Support The Armys Advantage
11
11/10/2009
12TSSR Issue Sheet Range Control Facility
08 ISSUE UPDATE
As of 8 Dec 08
- Lead FLVA
- Mr. Bryan Holtman, DPTMS FLVA, 804-765-366
- Mr. Tom Taylor, DPTMS-Range Manager FLVA,
804-765-3673
Issue Range Control Facility. (08-03-SRP-SCoE) D
iscussion Due to BRAC-COE increased training
load and the consolidation of AIT on Ft. Lee
(from Ft. AP Hill, APG, Redstone Arsenal, Ft.
Eustis), the installation has identified a
requirement for a range control facility capable
of conducting 24 hour operations, needed to
control the live fire range complex. This is
especially critical due to the close proximity of
major civilian thoroughfares and urban
encroachment (Hopewell, Colonial Heights, Prince
George, and Petersburg).
- STATUS
- 75 design completed (80K)
- Requirement is still in need of funding and/or
POM recognition. Identified in FY08 T-BUD
(Projects)
- Assistance necessary No
- Discussion
R
Recommendation/Timeline Request funding
through the T-BUD funding requirement process
and/or TRADOC Soldier Focus funding (750K)
13CASCOM and the U.S. Army Training Support Center
- Sustainment Center of Excellence
- SOLDIER TRAINING SUPPORT PROGRAM ISSUES
Training Support The Armys Advantage
13
11/10/2009
14TSSR Issue Sheet Plan for move of OD TADSS to
SCoE
As of 4 Dec 08
08 ISSUE UPDATE
- Lead
- Ms. Gayle Olszyk, OCS
- Mr. Bob Santillan, ATSC-Fielded Devices, (757)
878-2910 -
- Issue OD/PEO-STRI/ATSC plan for move of OD TADSS
to SCoE (08-01A-SP-SCoE) - Discussion
- Not everyone is tied-in to the plan for the
movement of devices from current locations to the
SCoE. - Example is EST-2000, APG does not want to
release 4 SS to meet Fort Lee endstate
requirement.
- STATUS Have received initial ROMS for all PEO -
STRI, TADSS movement from APG and RSA to Fort
Lee. Requesting revised ROM for TSED BEMT move
in 4th QTR 09.
- Assistance necessary Yes
- Discussion PEO-STRI will pack TADSS at current
location and functionally set-up at Fort Lee.
School will move TADSS during course move
timeline by commercial carriers.
G
Recommendation/Timeline Will provide course
move timeline to PEO-STRI once firm. Dates have
been provided to PEO-STRI for FY 09 TADSS.
15CASCOM and the U.S. Army Training Support Center
- Sustainment Center of Excellence
- ORDNANCE ISSUES
Training Support The Armys Advantage
16TSSR Issue Sheet BEMT reset planning
As of 25 NOV 08
08 ISSUE UPDATE
- Lead
- John DeRaimo, CASCOM SID, 804-765-2342
Issue Basic Electronic Maintenance Trainer
(BEMT) reset planning (08-09-SP-SCoE) Discussion
BEMT Trainers require reset starting in FY11.
Redstone, APG, and Edgewood need to be reset and
fall in on new BEMT trainers when they arrive at
Ft Lee (vice moving old systems or being reset
prior to the move to Lee). The same is true for
Knox systems moving to Ft. Benning. Current
on-hand/required for each location are Redstone
(OMEMS), 224 APG (OMMS), 239 and, Knox, 74.
The Ft. Lee BRAC Team must validate total
requirement for BEMT at Ft. Lee to ensure reset
and refresh in conjunction with moves (464). One
additional instructor station required at Ft.
Leehence 464.
- STATUS BEMT IPT meeting was conducted at
Redstone on 21-22 Oct to address the capability
document and STRAP
- Assistance necessary No
- Discussion
G
Recommendation/Timeline Training Strategy being
developed and will be completed end of Nov.
Strategy will be staffed and a draft STRAP will
be completed for staffing. ATSC developed COAs
for BEMT refresh at OD School/Lee provided COAs
to CASCOM on 28 Aug 08 for further consideration.
COAs still under review.
17TSSR Issue Sheet Bradley HOTS upgrade for RSA
As of 19 Nov 08
08 ISSUE UPDATE
- Lead
- John Clancy, CASCOM, 804-765-1130
Issue Bradley HOTS upgrade for Redstone Arsenal
(05-03-12OD-SCoE) Discussion RSA need their
HOTS upgraded (currently, A1 version is on hand).
PM is aware of requirement. Requirement is
currently not funded. Currently Redstone uses
actual turrets to conduct training, but lacks the
ability to insert faults for troubleshooting.
- STATUS CG signed memorandum outlining Bradley
Maintenance Training Strategy requirements.
Memorandum given to PM on 2 Nov 08 for review and
recommendations.
- Assistance necessary No
- Discussion
G
Recommendation/Timeline Pending meeting with PM
to discuss requirements in memorandum.
18TSSR Issue Sheet Sustainment for Virtual
Welding Trainers
As of 3 Dec 08
08 ISSUE UPDATE
- Lead
- CW5 Peters, OMMS-WMSD, 410-278-9887.
- John DeRaimo, CASCOM-SID, 804-765-2342
Issue Sustainment for Virtual Welding Trainers
(08-02-SP-SCoE) Discussion Virtual Welders
were purchased by OMMS. Need sustainment
funding. Purchased off the shelf by OMMS. Eight
student stations and one instructor station. Has
been online for a yearmanufactures warranty has
two years left on it. Support runs out in June.
No requirement document. Trying to link to SEW
STRAP.
- STATUS Determine ITRM funding support Develop
TSRD CW5 Peters, OMMS S 30 Sep 08 Local
TADSS Device number assigned. Working to add to
Equipment Summary. Will then work ITRM linkage.
Draft requirements document developed 2 Dec.
Will forward to SID NLT 19 Dec 08. Will
coordinate efforts with ATSC.
- Assistance necessary No
- Discussion
G
Recommendation/Timeline Look at possibly of ITRM
funding support. Link to SEW STRAP or develop
requirements document. Develop TSRD to identify
specific requirements. Include Ft Leonardwood
and RTSM requirements. Update ORD to CPD to
capture virtual welder requirements in the SEW
CPD.
19TSSR Issue Sheet M109A6 Panel Trainers are out
of date
As of 21 NOV 08
08 ISSUE UPDATE
- Lead
- USAFAS DOTD/TCM Cannon - Steve Sells,
stephen.sells_at_us.army.mil, DSN 639-3454, Comm
(580) 442-3454 - Support
- USAOMMS - AJ Jones, aj.jones_at_us.army.mil. DSN
298-7385, Comm (410) 278-7385 - TCM-HBCT - Mike Karbon, michael.karbon_at_us.army.mil
, DSN 786-6681 Comm (586) 214-6681
Issue M109A6 Panel Trainers are out of date
(08-03-SP-SCoE) Discussion The M109A6 Panel
Trainers became outdated when the turrets were
modified several years ago. USAFAS, with input
from USAOMMS, is developing the requirements to
replace the outdated panel trainers with virtual
3-D desk top trainers. PM HBCT is working the
funding for the new trainers with PM FSP.
- STATUS Unfunded requirements for the M109A6
included in FY10-15 POM review. Efforts include
coordination with PEO STRI Customer Support
Group. M109A6 cost estimates are 0.75M for
Non-Recurring Expenses in FY11 and 1.6M in FY12
for updates.
- Assistance necessary No
- Discussion
G
Recommendation/Timeline Continue to refine cost
data. Continue coordination and requirements
development effort. Replace Panel Trainers with
3D Virtual Desk Top Trainers.
20TSSR Issue Sheet Equipment upgrade process
As of 2 Dec 08
08 ISSUE UPDATE
- Lead
- Steve McWilliams, OMMS, 410-278-4115
- John DeRaimo, CASCOM SID, 804-765-2342
Issue Process for upgrading equipment is not
well defined. As a result outdated equipment is
used for training Professional Development
students. (08-04-SP-SCoE) Discussion
Professional Development Soldiers are being
trained on M1A1 Abrams tanks and M2A2 Bradley
Fighting Vehicles. These systems are not
representative of systems in the field. The
process for updating equipment is not clearly
defined or understood. Equipment requiring
upgrade has been identified on the TRADOC
Equipment Modernization List.
Issue on track CLOSED
- STATUS CG signed memorandum outlining Bradley
Maintenance Strategy requirements. Abrams
requirements identified previously. (Received 6
upgraded M1A1 Abrams Tanks. NET will take place
from 8-12 Dec 08.) Key to this effort is to get
the STRAP Writing Tool implemented and
operational. (ATSC Lead)
- Assistance necessary No
- Discussion
G
Recommendation/Timeline Discussed at the Bradley
Maintenance Training Strategy Summit 10-12 June
2008. Memo process is not the systemic answer
only an interim measure. Ensure STRAP is
coordinated and accurately reflects requirements.
21TSSR Issue Sheet 12 M1A2 SEP V2 HOTTS to
support 63A
As of 2 Dec 08
08 ISSUE UPDATE
- Lead
- John DeRaimo, CASCOM SID, 804-765-2342
- Terry Young, 1/81 Armor Bn, 502-624-5685
Issue 1/81st Armor, Ft. Knox, KY, requires 12
M1A2 SEP V2 HOTTS to support 63A AIT and BNCOC
training. (08-05-SP-SCoE) Discussion TCM HBCT
included 12 M1A2 SEP V2 HOTTS for 63A AIT and
BNCOC training at Ft Knox, KY in their FY 09
budget. Memorandum identifying M1 Abrams
Training Equipment requirements has been signed
by CG and forwarded to TCM HBCT on 7 Nov 07.
Issue on track CLOSED
- STATUS TCM HBCT indicates this is on track and
funded. Funding issues may impact delivery
schedule. Anticipated delivery for these trainers
is FY 11-12. Will continue to monitor.
- Assistance necessary No
- Discussion
G
Recommendation/Timeline Continue to monitor
until complete. These items have been included
on the TRADOC Equipment Modernization Plan.
Request for proposal has been funded. Addressed
at Bradley maintenance Training summit 10-12 Jun
08.
22TSSR Issue Sheet Bradley A3 DTT software upgrade
As of 19 Nov 08
08 ISSUE UPDATE
- Lead
- John Clancy, CASCOM TD, 804-765-1130
- Terry Young, 1/81 Armor Bn, 502-624-5685
- Steve McWilliams, OMMS, 410-278-4115
Issue The Bradley A3 DTT and Instructor/Operator
Station require software upgrade.
(08-06-SP-SCoE) Discussion The upgrade is in
support of the Bradley A3 Chassis Modernization
Embedded Diagnostics (CMED).
- STATUS CG signed memorandum outlining Bradley
Maintenance Training Strategy requirements.
Memorandum given to PM on 2 Nov 08 for review and
recommendations.
- Assistance necessary No
- Discussion
G
Recommendation/Timeline Pending meeting with PM
to discuss requirements in memorandum.
23TSSR Issue Sheet Bradley A3 CMED software
upgrade
As of 19 Nov 08
08 ISSUE UPDATE
- Lead
- Tim Durbin, CASCOM SID, 804-765-1206
- Assist Terry Young, 1/81 Armor Bn, 502-624-5685
- Assist Steve McWilliams, OMMS, 410-278-4115
Issue The Bradley A3 Chassis Modernization
Embedded Diagnostics (CMED) software requires
upgrade to allow for hull fault insertion
capabilities. (08-07-SP-SCoE) Discussion The
upgrade is in support of the Bradley A3 CMED
(Hull) training. Currently the Bradley A3 turret
has fault insertion capabilities with Vehicle
Diagnostic Management Software (VDMS).
- STATUS CG signed memorandum outlining Bradley
Maintenance Training Strategy requirements.
Memorandum given to PM on 2 Nov 08 for review and
recommendations.
- Assistance necessary No
- Discussion
G
Recommendation/Timeline Pending meeting with PM
to discuss requirements in memorandum.
24TSSR Issue Sheet Bradley A3 HOTT required for
training
As of 19 Nov 08
08 ISSUE UPDATE
- Lead
- Tim Durbin, CASCOM SID, 804-765-1206
- Assist Terry Young, 1/81 Armor Bn, 502-624-5685
- Assist Steve McWilliams, OMMS, 410-278-4115
Issue A Bradley A3 Hands-On Turret Trainer
(HOTT) is required for future Bradley training
due to substantial number of Bradley A3 platforms
being fielded. (08-08-SP-SCoE) Discussion If
the future Bradley fleet will primarily be
composed of the Bradley A3 variant, it is
imperative that a HOTT be developed in order to
support turret training requirements. In addition
to a turret maintenance HOTT, a trainer for hull
maintenance training should simultaneously be
explored. IAW the M2A3/M3A3 System Training Plan
(STRAP) version 12.2 approved 8 April 2003,
provisions are outlined for maintenance trainers
in support of Ordnance MOSs
- STATUS CG signed memorandum outlining Bradley
Maintenance Training Strategy requirements.
Memorandum given to PM on 2 Nov 08 for review and
recommendations.
- Assistance necessary No
- Discussion
G
Recommendation/Timeline Pending meeting with PM
to discuss requirements in memorandum.
25TSSR Issue Sheet Sustainment for Major
Assemblies
As of 2 Dec 08
08 ISSUE UPDATE
- Lead
- Tim Durbin, CASCOM SID, 804-765-1206
- Steve McWilliams, OMMS, 410-278-4115
Issue Sustainment for Major Assemblies used for
Maintenance Training. (08-23-SP-SCoE) Discussion
Major assemblies (engines, transmissions,
transfers, etc) that are used for Maintenance
Training at APG, FT Knox and FT Jackson become
worn over time from the frequent disassembly and
assembly of the items. There are currently no
procedures in place to periodically refresh or
reset these items as we are now doing with the
TRADOC Equipment Modernization Plan. Procedures
need to be established and internalized to plan
for the refresh of these items.
- STATUS Developed and submitted unfunded
requirements to CASCOM. UFR is low on the
priority list. Developing memorandum for Chief
of Ordnance signature to request sustainment at
PM level.
- Assistance necessary No
- Discussion
G
Recommendation/Timeline Program Managers plan
for the sustainment of these items in the Life
Cycle Management Plan for the system. Addressed
at 10-12 June 2008 summit. Recommend CASCOM
engage ASAALT community, outlining the funding
issue, to see if there is a method to get funding
through the Life Cycle Management Command.
26TSSR Issue Sheet Basic hydraulics training
capability
As of 2 Dec 08
08 ISSUE UPDATE
- Lead
- Steve McWilliams, OMMS, 410-278-4115
- John DeRaimo, CASCOM SID, 804-765-2342
- Sonia Klein, ATSC-STIDD, 757-878-2910
Issue Basic hydraulics training capability.
(08-04A-SP-SCoE) Discussion A number of MOSs
require hydraulic training, much like basic
electronics training. The current hydraulics
system trainer is antiquated, and there is a
desire to explore the possibility of
incorporating basic hydraulics training
capabilities into the current BEMT system.
Current Hydraulic Trainer, device number 55-23,
is outdated. Leverage BEMT to incorporate
hydraulics training capability. Requires
Proponent to update the BEMT requirements
document (ORD, 99) to a Capability Production
Document (CPD) and update the System Training
Plan (STRAP). ATSC will provide Proponent
assist.
- STATUS A two day meeting to rewrite the BEMT
ORD was held from 21 - 22 Oct 08 at Redstone
Arsenal, AL. Leveraging hydraulic training into
the ORD was discussed during this meeting.
- Assistance necessary No
- Discussion
A
Recommendation/Timeline Determine if hydraulics
requirements need to be added to the BEMT
Requirement Document Strategy being drafted
will be staffed the end of NOV. Develop Hydraulic
system attributes to possibly add into
requirements document. (Possibly add Hydraulics
TADSS into TWV requirements as a common
hydraulics trainer.)
27CASCOM and the U.S. Army Training Support Center
- Sustainment Center of Excellence
- TRANSPORTATION ISSUES
Training Support The Armys Advantage
28TSSR Issue Sheet USAODS Driver Trainers
Distribution Plan
As of 24 Nov 08
06 ISSUE UPDATE
- Lead
- Mr. Charles J. (CJ) Florence, TSCH-ADSO,
757-878-6557 - Mr. Joe Giunta, PEO-STRI, 407-384-3688
- Issue USAODS Driver Trainers Distribution Plan /
LCMP is outdated (06-11-01TC-SCoE) - Discussion
- Currently there are multiple variants of the
ODS system fielded all covered by WCLS - 26 thru PEO-STRI original plan called for these
26 to be upgrade to a CDT variant - 47 were purchased by TRADOC
- Thru LCMP the PM is responsible for execution
(cradle to grave) - Life Cycle Management Activity, responsibility
of the PM is not being executed (PM-TV did not
sign LCMP) - There are ongoing unauthorized modifications to
these devices. Army unable to control
configuration management - Current conditions put at-risk current HQDA
funding support
- STATUS ONGOING Driver trainers at Bliss will
move to FLW in the July/Aug time frame as 88M
training is consolidated at FLW. Further, the PM
TV is currently working the tech refresh funding
through the weapon system review (WSR) in support
of TADSS. TSCH supports the migration overall
concept and path of ODSs to CDT trainers.
- Assistance necessary No
- Discussion
- Combine this slide with next issue,
Redistribution status of the 88M driver trainers
G
- Recommendation/Timeline
- Update, approve and fund LCMP by PM-TV
- Future Drivers Trainers should be CDT
28
29TSSR Issue Sheet Redistribution status of the
88M driver trainers
As of 24 Nov 08
06 ISSUE UPDATE
- Lead
- Mr. Charles J. (CJ) Florence, TSCH-ADSO,
757-878-6557 - Kevin Landy, ATSC-STIDD, 757-878-2910
- Issue Redistribution status of the 19 - 88M
driver trainers at Ft Bliss. (06-11-03TC-SCoE) - Discussion
- 88M10 will be consolidated at FT Leonard Wood
(FLW) and the trainers are a part of that
transition. - The provisional plan is to ship those systems
between July Sept 09 (Bliss to FLW). - This issue does not fall under BRAC funding
because it is considered a discretionary move.
- Assistance necessary No
- Discussion
- Combine this slide with previous issue, USAODS
Driver Trainers Distribution Plan / LCMP is
outdated
G
STATUS Move will be funded
internally by HQ TRADOC. Movement is planned
for July/Aug 09 time frame.
Recommendation/Timeline TRADOC determine the
funding resource to support the command directed
move
30TSSR Issue Sheet Capabilities document for
locomotive trainer
As of 21 Nov 08
06 ISSUE UPDATE
- Lead
- Mr. Caprio, CASCOM, 804-765-1882
- Donna Heck, TRADOC G-3/5/7, 757-788-3884
- Tim Durbin, CASCOM SID
- Issue No capabilities document for locomotive
trainer thus no sustainment funding.
(06-11-08TC-SCoE) - Discussion
- Two trainers were purchased by DCSLOG for TSCH
757th Trans Bn (Milwaukee, WI). - Without capabilities document no sustainment
funding for LETS system. Sep 08 warranty ended. - No sustainment dollars identified for FY10 or
11.
- STATUS Sustainment dollars available thru
FY09. LETS non-system CPD previously denied by
ATSC - Locomotive is a Commercial of the Shelf
(COT) item not supported by any TOE, therefore no
system CPD can be developed. Non-system CPD/STRAP
currently being staffed.
- Assistance necessary No
- Discussion
- STRAP also completed , both documents being
staffed.
Y
Recommendation/Timeline CASCOM developed
Non-System Capability Production Document (CPD)
for Locomotive Engineer Training Simulator
(LETS). 90/120 days expected for staffing.
31TSSR Issue Sheet Funding legacy watercraft TADSS
As of 22 Aug 08
08 ISSUE UPDATE
- Lead
- Don Topping, TSCH, 757-878-1069
- Fred Williams, PD AWS, 586-574-8830
- Andrew Lawfield, PM Force Projection,
586-753-2677 - Keith Caprio, CASCOM, 804-765-1882
- Issue No funding for legacy-class watercraft
TADSS. (08-10-SP-SCoE) - Discussion
- Legacy-class watercraft (LSV, LCU, etc.) Training
Aids, Devices, Simulators, and Simulations
(TADSS) remain a continual unfinanced requirement
(UFR). - While this fleet of watercraft has been fielded
new technology upgrades (e.g. C4ISR
capabilities), TADSS technology
refresh/modernization has not been program funded
(although, the TSCH has been aggressive about
pursuing other funding sources). - As the Army watercraft life cycle manager,
Product Director, Army Watercraft Systems (PD
AWS, Mr. Fred Williams) coordinate with DA G8,
TRADOC Capabilities Manager-Transportation, and
the USATSCH in identifying, requesting,
obtaining, and executing funding sufficient to
resolve this issue.
- STATUS PD AWS has submitted funding requests in
the FY10-15 POM sufficient to fund non-JHSV TADSS
requirements, if approved. JHSV TADSS funding
requested in the FY10-15 POM, 9.9M, is short by
approximately 1.7M. This shortfall and any
other shortfalls resulting from receiving less
than the amount of funding requested in the
FY10-15 POM will be requested in the FY12-17 POM.
- Assistance necessary No
- Discussion
G
Recommendation/Timeline Costs for TADSS
refresh/upgrades provided to PD AWS by USATSCH as
of 15 Aug 08.
32TSSR Issue Sheet Conduct of FORSCOM required
vehicle operator training
As of 24 Nov 08
08 ISSUE UPDATE
- Lead
- Mr. Charles J. (CJ) Florence, TSCH-ADSO,
757-878-6557 - Mr. Sam Woolf, CASCOM TD
Issue Conduct of FORSCOM required vehicle
operator training is limited due to lack of
virtual simulator support (08-11-SP-SCoE) Discussi
on Resource constraints dictate that drivers,
commanders, and their units do not have
sufficient operational miles/hours (or other
resources) to hone these individual and
collective skills in a purely live-fire or
live-maneuver environment. Therefore, drivers
will require access to virtual training
capabilities. Current construct of the 7th
SBDEs driver training program consists of 23
hours of classroom and 17 of hours of live
driving prior to a Soldier being certified to
operate a vehicle on Ft Eustis and Ft Story, VA.
Systems will support deployment training for up
to 3,395 FORSCOM personnel. It is anticipated
that 8 hours of live training will be replaced by
virtual training
- STATUS USATSCH and CASCOM are leading the
TRADOC effort to craft the Army Drivers Training
Strategy to virtual drivers training via TADSS.
- Assistance necessary No
- Discussion
G
- Recommendation/Timeline
- Pass back to FORSCOM to resource their
requirement. - TRADOC re-address the Drivers Training
Training Strategy.
32
33CASCOM and the U.S. Army Training Support Center
- Sustainment Center of Excellence
- QUARTERMASTER ISSUES
- NO TSSR Level Issues
- All issues are being worked in-house
Training Support The Armys Advantage
34CASCOM and the U.S. Army Training Support Center
- Sustainment Center of Excellence
- SOLDIER SUPPORT INSTITUTE (SSI)
- NO TSSR Level Issues
- All issues are being worked in-house
Training Support The Armys Advantage
35CASCOM and the U.S. Army Training Support Center
- Sustainment Center of Excellence
- MER UPDATE
Training Support The Armys Advantage
36STSP and MER Reset Issue SCoE Warrior FTX
NEW DRAFT ISSUE
As of 1 Dec 08
- Lead
- Doug Gretka, CASCOM, 804-765-1495 and LTC Jack
Demuynck, QMCS, (804) 734-3175
Issue Realign FTX related TADSS requirements to
FT AP Hill Discussion The SCoE has changed the
location of the TRADOC mandated 5 day AIT FTX
from Ft Lee, VA to FT AP Hill, VA. The QMCS will
begin 100 of its FTX at FAPH beginning Jan 09.
The OCS will begin arriving in the 4th QTR of
FY09 and will continue to build, culminating with
10 of their Soldiers training by 4th QTR FY11.
TCS will only have one course (88N) participating
in the FTX and that course load begins training
at FAPH in the 1st QTR of FY11.
- Assistance necessary No
- Discussion
R
- Recommendation/Timeline
- Conduct Mission Essential Requirements
reassessment to identify TADSS requirements in
support of realignment - Realign TADSS, as defined by the QMCS, to be
located at FT AP Hill TSC IAW MER analysis.
37SRP and MER Reset Issue SCoE Warrior FTX
As of 1 Dec 08
NEW DRAFT ISSUE
- Lead
- Doug Gretka, CASCOM, 804-765-1495 and LTC Jack
Demuynck, QMCS, (804) 734-3175
- Issue Realign FTX related range requirements to
FT AP Hill - Discussion
- The SCoE has changed the location of the TRADOC
mandated 5 day AIT FTX from Ft Lee, VA to FT AP
Hill, VA. The QMCS will begin 100 of its FTX at
FAPH beginning Jan 09. The OCS will begin
arriving in the 4th QTR of FY09 and culminate to
100 in 4th QTR FY11. TCS will only have one
course (88N) participating in the FTX and that
course load begins training at FAPH in the 1st
QTR of FY11. - The SCoE will utilize ranges for M16A2/M4
qualification/ zero Convoy Live Fire Range
Urban Operations Site
- Assistance necessary No
- Discussion
A
- Recommendation/Timeline
- Conduct Mission Essential Requirements
reassessment to identify Range requirements in
support of realignment - Realign applicable range program requrieements,
as defined by the QMCS, to be located at FT AP
Hill TSC IAW MER analysis.
38Key Planning Milestones
39Way Ahead
- Continue working ongoing/emerging issues, as
needed (Program / Proponent) - Solidify key planning milestone dates for FY09
TSSR/MER (ATSC / SCoE)
40QUESTIONS/ DISCUSSION