CE 454 Fall 2004 Urban Transportation Systems - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

CE 454 Fall 2004 Urban Transportation Systems

Description:

'Alternative Sign locations and driving directions for OMSI' Presentation Outline. Objectives ... Find alternative driving directions. Problem Recognition ... – PowerPoint PPT presentation

Number of Views:64
Avg rating:3.0/5.0
Slides: 25
Provided by: Naw7
Category:

less

Transcript and Presenter's Notes

Title: CE 454 Fall 2004 Urban Transportation Systems


1
CE 454 Fall 2004Urban Transportation Systems
  • Dr. Robert L. Bertini
  • Final Project
  • By
  • Ali Al-Qubaisi
  • Nawaf AL-Nuaimi
  • Sulaiman AL-Neyadi

2
Project
  • Alternative Sign locations and driving
    directions for OMSI

3
Presentation Outline
  • Objectives
  • Problem Recognition
  • Problem Definition
  • Methodology
  • Outcomes

4
Objectives
  • Upgrade the location of signs
  • Find alternative driving directions

5
Problem Recognition
  • System Environment
  • Industrial District
  • Street Quality
  • Slopes and elevations
  • Rails
  • Controlled System
  • Only one inlet
  • Streets leading to the inlet

6
System Environment
  • Industrial District

- OMSI is located in an industrial district that
is surrounded by lot of warehouses.
N
OMSI
7
  • System Environment
  • Street Quality

- Most streets are in bad condition
8
  • System Environment
  • Slopes and elevation

- OMSI happens to be located at a low elevation
(34 ft) compared to its surroundings (55 ft).
Down ? looking ? Up
Up ? looking ? Down
9
  • System Environments
  • Rails
  • - Trains delay traffic at certain times
  • Old rails make the streets undesirable to
    motorists

N
OMSI
10
  • Controlled System
  • Only one inlet

- This adds another type of difficulty
11
  • Controlled System

N
  • Streets leading to the inlet
  • Clay St (?)
  • Taylor St (?)

12
  • Controlled System

N
  • Streets leading to the inlet
  • Clay St (?)
  • Taylor St (?)

13
  • Controlled System

N
  • Streets leading to the inlet
  • Clay St (?)
  • Taylor St (?)

14
Problem Definition
  • The problem can be stated as
  • Getting people to OMSI with a clear directions
    and enough signs

15
Methodology
  • Measure of Performance
  • Generation of Alternatives

16
Measure of Performance
  • Constraints Quality, speed, Volume
  • Objectives Delay, signs.

17
  • Measure of Performance
  • Constraints Quality
  • Pavement (cracking)
  • Marking
  • Geometric characters (width, bike lane, median)

Scale 4 (Excellent) to 1 (Poor)
18
  • Measure of Performance
  • Constraints Speed, Volume

19
  • Measure of Performance
  • Objectives Delay
  • Most streets carry big trucks.
  • Train passes frequently many times a day.

20
  • Measure of Performance
  • Objectives Signs
  • Signs should be consistent

21
  • Generation of Alternatives

N
  • Current routes and signs

22
  • Generation of Alternatives

N
  • Current routes and signs

23
  • Outcomes

N
  • 5 signs removed
  • 2 signs added
  • 2 new routes

24
Questions ?
Write a Comment
User Comments (0)
About PowerShow.com