1
Multi-Modal Trip Planner System(MMTPS)
  • UIC Computational Transportation Science
  • Thursday, November 1st

2
(No Transcript)
3
MMTPS Project Overview
  • Scope
  • Demonstration of a Web-Based Multi-Modal Trip
    Planner
  • Vision
  • Include Transit, Driving, and other Modes
  • Incorporate Historical or Real-time Data to
    Compute Travel Times
  • Provide Information on Transit and Traffic
    Incidents and Delays
  • Comply with ITS Standards

4
MMTPS Project Objectives
  • Demonstrate Multi-Modal Trip Planner Feasibility
  • Study Ridership Impacts
  • Test implementation of ITS Standards
  • Provide a Model Deployment for other Regions

5
Project Partners and Stakeholders
  • National Level
  • USDOT
  • Volpe Center
  • Oregon DOT
  • Portland Tri-Met
  • Bay Area MTC
  • NYSDOT
  • OCTA
  • Transport Direct
  • WMATA
  • Local Level
  • CTA, Metra and Pace
  • RTA TIC
  • IDOT
  • ISTHA
  • CMAP
  • CNT
  • Standard Parking
  • Chicagoland Bicycle Federation

6
Regional Transit ITS Program (RTIP)
7
Project Approach
  • Use of Systems Engineering Principles
  • Concept of Operations
  • Technical Requirements
  • Detailed Design
  • Implementation
  • Validation Verification

8
Project Approach
  • Implement in a phased structure
  • Transit Trip Planning
  • Driving Directions
  • Real-Time Traffic Conditions
  • Parking Data
  • Emissions Avoided Data
  • Attractions Data
  • Real-Time Arterial Travel Times
  • Real-Time Transit Information

9
Project Approach
  • Assess Technology Options
  • Alternative 1 Existing Systems Integration
  • Alternative 2 Enhanced Systems Integration
  • Alternative 3 Open Source (OS) Development
  • Alternative 4 Customize Existing OS Efforts
  • Alternative 5a COTS - HAFAS Itinerary Trip
    Planner
  • Alternative 5b COTS MENTZ Intermodal Journey
    Planner
  • Alternative 6 Combination

10
Detailed Design
11
Evaluation
  • Does it affect mode choice?
  • System costs and effect on other agency costs
  • Development
  • Operations and maintenance
  • Analyze effects on call center, using existing
    data on call volume, types of calls, customer
    wait time (cost/call)
  • Monitor use of MMTPS and component systems
    (implications for costs of Operations and
    Management)
  • Technical and institutional issues
  • Use of ATIS and TCIP standards
  • Technical issues associated with data
  • Coordination, communication, staff response,
    training, other institutional issues

12
MMTPS Development Site
13
Project Status
  • Concept of Operations August 2005
  • System Req./High-Level Design September 2006
  • Alternatives Analysis November 2006
  • Detailed Design January 2006
  • Implementation November 2007
  • Validation Verification
  • Volpe Evaluation
  • ITS Standards Test