Title: TPM:04
1WHOS TO BLAME ?
TPM04
2 TOTAL PRODUCTIVE MAINTENANCE
3TOTAL PRODUCTIVE MAINTENANCE
- TOTAL
- Business wide
- PRODUCTIVE
- Improve equipment performance
- MAINTENANCE
- Machine systems support
4(No Transcript)
5TPM...
...is a culture that focuses on improving the
effectiveness of the plant, equipment and
processes through the empowerment of PEOPLE
6(No Transcript)
7TOTAL PRODUCTIVE MAINTENANCE
- TPM is
- Having a clean, tidy and safe work place
- Keeping machines and tools in good condition
- Having a say in what goes on in your cell/area
- Getting things done
- Making life easier - being in control
- Working in a smart way
- Owning and having a pride in your
machines/cell/area - Teamwork - production and maintenance
- About making machines as effective as possible
8(No Transcript)
9 TOTAL PRODUCTIVE MAINTENANCE
- TPM IS NOT
- Operators carrying out Maintenance Engineers
jobs - A way of making people work harder
- Employees expected to carry out tasks that
they are not trained for - A way of monitoring employees
- Extra duties in your own time
- Anything other than common sense and correct
working practices - Just a change for the shop-floor
10Components of TPM
Continuous Improvement
CAN DO Activities
Machine Systems Effectiveness Improvements
Autonomous Maintenance
People
Machine Systems Maintenance
Prevention Design
Maintenance Systems
Machine Systems Integration
Machine Systems Specification Selection
11 If you leave us our money, buildings and our
brands but take away our people the company will
fail. But if you take away our money, our
buildings and our brands but leave our people, we
can rebuild the whole thing in a
decade. Chairman - Procter Gamble
12 TPM ACTIVITIES
- CAN DO Activities
- Bolt Tightening
- Identifying Actions
- Controlling Coolant and Swarf
- Calculating Machine Effectiveness
- Predicting Problems
13IDENTIFYING ACTIONS
14'CAN DO' into 5S
C
lean Seiso
Shine the workplace equipment and tools
A
rrangement Seiri
Sort through sort out
N
eatness Seiton
Storage set limits locations
D
iscipline Seiketsu
Share information and standards
O
rder Shitsuke
Stick to the rules self-discipline
15THE 6 BIG LOSSES
- Breakdown Losses
- Set up Adjustment Losses
- Idling Minor Stoppage Losses
- Reduced Speed Losses
- Quality Defects Rework
- Start up Losses
Availability
Performance
Quality
16THE EFFECTS OF THE 6 BIG LOSSES
6 Big Losses
Machine Equipment
- Breakdown
- Set up Adjust
- Idling Minor Stoppage
- Reduced Speed
- Scrap Rework
- Start up
Available Run Time
Downtime Losses
Net Operating Time
Speed Losses
Valuable Operating Time
Defect Losses
17Overall Equipment Effectiveness Availability x
Performance Rate x Quality Rate
85
Breakdowns per machine (stopped longer than 10
minutes)-less than once a month
Availability
Breakdowns
1
Operating Time - Down Time
Operating Time
Equipment
Setup/ adjustment
Setup/adjustment time - less than 10 minutes
2
Operating Time
Greater than 90
Down Time Losses
Available Run Time
Net Operating Time
Speed Losses
Idling and minor stoppages per machine (under 10
minutes)
Idling minor stoppages
Performance rate
3
Quality losses
Valuable Operating Time
Ideal cycle time x Output
Available Run Time
Achieve ideal cycle times (design speed)increase
15 or more
Speed
4
Greater than 95
Average total operating loss 30 - 50
Quality defects in process rework
Rate(including products to be reworked)-less
than 0.1
Quality rate (quality products)
5
Input-volume of quality defects
Input
Start-up losses
Start-up yield - 99 or more of lot
6
Throughout process - greater than 99
Optimal conditions in operator-machine system
Improve the overall condition of the workplace
18THE EFFECTS OF THE 6 BIG LOSSES
6 Big Losses
Machine / Equipment
Operating Time
Breakdown Set Up Adjust
Available Run Time
Idling Minor Reduced Speed
Net Operating Time
Scrap and Rework Start Up
Valuable Operating Time
19 OVERALL MACHINE EFFECTIVENESS
OME Availability x Performance rate x
Quality rate
20 TOTAL PRODUCTIVE MAINTENANCE
AVAILABILITY
Operating time - downtime Operating time
PERFORMANCE
Number of parts produced
Number of parts expected to be produced
QUALITY
Number of parts produced - Scrap
Number of parts produced
21 TOTAL PRODUCTIVE MAINTENANCE
AVAILABILITY
Changeovers
Breakdowns
- Training
- Methodology
- Technology
- M/c Modifications
- Control System
- Maintenance Systems
- Predictive, Preventive,
- Planned, Operator,
- Breakdowns
- Design-out Activities
- Spares Control
- Make Vs Buy
- Refurbishment
22 TOTAL PRODUCTIVE MAINTENANCE
PERFORMANCE
Method
Machine
- Method Study
- Re-design
- Tooling Fixturing
- modifications
- Manufacturing Systems
- Material Handling
- Optimum Cutting Conditions
- Tooling
- Programming
- Control System Update
- Refurbishment
23 TOTAL PRODUCTIVE MAINTENANCE
QUALITY
Capability
Errors
- Capability Studies
- Design of Experiment
- Re-design and
- Implementation
- SPC Implementation
- Process Control
- Poka Yoke
- (Fool Proofing)
- Training
- FMEA
-
- Machine Modification
24IMPROVING OVERALL MACHINE EFFECTIVENESS
Continuous
Improvement
Japanese
Total
Continuous
Step
Machine
Improvement
Improvement
System
Effectiveness
Indian Incremental
Improvement
Time
Now
25(No Transcript)
26 TPM ACTIVITIES
- CAN DO
- Data collection
- OME
- Waste
- Targets
- Kaizen
- Autonomous maintenance
- Inspection
- Tagging
- Focused Improvements
- Waste Reduction
- ATTENTION TO DETAIL
27TPM ACTIVITIES
Targets
CAN DO
Data Collection
OME
Waste
Inspection
Kaizen
Waste Reduction
Tagging
Autonomous Maintenance
Focused Improvements
ATTENTION TO DETAIL
28IMPLEMENTATION
- Start with simple activities which will bring
good returns - Plan the TPM programme in detail
- Probably 3 years overall
- Ensure that appropriate measures of
performance are in place - Accompanying change in management style
- Employee participation, motivation and
enhancement
29THE 11 BASIC IMPLEMENTATION STEPS
1. Identify Key Machines in Cell 2. Clean
Machines Thoroughly 3. Identify Problems and
Fit Tags to faults 4. Identify Tools,
Equipment and Arrange Neatly 5. Gather Shop
Floor Data and Calculate OME 6. Plot OME Value
and Display 7. Generate Cleaning, Lubricating,
Bolt Tightening and Inspection Procedures 8.
Agree Responsibility for Fault Rectification 9.
Agree Actions to Eliminate Problems 10. Notify
Works Engineer with Job Scheme 11. Monitor
Performance Against Agreed Works Engineer Schedule
30STRUCTURED IMPLEMENTATION PROCESS
Detail Planning
Site Awareness
TPM Diagnostic
Feedback / Commitment
Implement Pilot
On-going Plan
Owner Site wide Environment IR issues Structure Ro
les Shift patterns Need for change Benefits Planni
ng
Agreement Budget Facilities Resources
Detail plans Identify pilot
Management Supervisors Support functions Shopfloor
Training room Team building Planning Hands
on Data collection Effectiveness Procedures
Review Roll out Projects
31A Step Approach To Implementation...1
Select on initial Cell/Area Simple CAN DO
activities Simple bolt tightening and
lubrication Identify critical machinery and
benchmark figures Focused project(s) to improve
effectiveness Measure improvements and
publicise Set up continuous improvement groups
32A Step Approach to implementation...2
- Select more machinery and repeat
- Spread to other cells/areas
- Introduce operator maintenance
- Maintenance System Diagnostic and Design
- Maintenance System Implementation
- Maintenance Prevention Design Projects for
critical machinery - Procedures for machinery selection and
procurement
33TPM ROLES
Operators Role
Carry out
Maintenance of basic machine
improvements
conditions prevent deterioration
Improve weak points
Monitor OME
set-right deterioration
measure deterioration
Periodical restoration
Inspect, detect
time based maintenance
predict problems
Technical analysis of breakdowns
Minor repairs
predictive maintenance
improvements
Maintenance Role
34LEVERAGING THE EQUIPMENT
TPM MEASURES
Overall Equipment Effectiveness
Production Cost Efficiency
Product Lead Time Efficienc
Performance Rating
Quality Rating
Man-Hour Efficiency
Materials Efficiency
Heat/Power Efficiency
Lead Time Efficiency
Availability
Minor Stops
Breakdown
Man-Hour Loss
Inventory Loss
Defects
RM Yield
Energy Loss
Changeover
Speed Loss
Production Control
Tool Change
Start-up
35TPM BENEFITS
- To The Business
- Teamwork, Improved Morale and Unlocked Shop
floor Potential - More Effective Machines
- - Meet Customer Requirements
- - Produce More for the Same Cost
- - Become More Competitive
- - Less Expenditure on Breakdowns, Machine
Parts, Scrap, Panic Measures, etc.
36TPM BENEFITS
- For Maintenance Engineers
- Less Breakdown Maintenance (Firefighting)
- Machines which are Clean and kept in Good
Condition - More Time to Spend on Preventing Breakdowns
Using - - Preventive Techniques
- - Predictive Techniques
- - Design out Problems
- Opportunity to Increase Skills and Knowledge
37 TPM BENEFITS
- For Operators and Setters
- A Clean, Tidy and Safer Workplace
- Problems and Faults Fixed
- A say in What goes on in the Cell
- Opportunity to increase Skills and Knowledge
- Less Panic - More Control
- Smarter Methods of Working on More Effective
Machines
38TPM BENEFITS
- Overall Benefits
- Productivity
- - Throughput Increased, breakdowns reduced
- Quality
- - Defects reduced, re-work reduced
- Cost
- - Maintenance costs reduced, energy conserved
- Delivery
- - Stock reduced, stock turnover increased
- Safety
- Morale
-
39TPM CYCLE
40TOTAL PRODUCTIVE MAINTENANCE
- The requirements for TPM to succeed are
- Commitment from Management - initial drive
from top down - Commitment from shop floor - Bottom up driven
after start - The necessary resources made available
- Support from Maintenance Departments
- Everybody to try it.
41CONCLUSION
- Typically 60 of breakdowns are caused by loose
bolts and poor lubrication - Dirty conditions are a major cause of failure
and accelerate wear and deterioration of
machinery - Product quality, throughput, safety and morale
are all inextricably linked to the machine
condition
42TPMOHP42