Title: Long Range Planning Revised Master Site Plan Presentation
1Long Range Planning Revised Master Site Plan
Presentation
2Church Approved Activities
- 10/16/05 - The Church authorized the Long Range
Planning Committee to obtain the services of an
architect for the purposes of revising the Master
Site Plan that is a part of the 20 Year Plan. - 1/15/06 - Church approved partnership with the
design/build firm of Myrick, Gurosky and
Associates to complete the revision to the 1996
Long Range Plan and to design, and build the next
phase of the Mount Zion Baptist Church revised
Master Site Plan. - The Church will review and approve the various
phases throughout the process.
3Timeline Milestones
2006
January
February
March
April
May
June
- February
- MGA Deliver Master Plan Including Next Phase
Recommendation - MZBC Approve Revised Master Plan
- MZBC Approve Next Phase Design Initiation
- June
- MGA Deliver Final Design Plans
- Begin Construction
- March
- MZBC Initiate Capital Fund Raising
- February
- MGA Deliver Master Plan Including Next Phase
Recommendation - MZBC Approve Revised Master Plan
- MZBC Approve Next Phase Design Initiation
- April
- MGA Deliver Next Phase Design and GMP
- MZBC Approve Next Phase Design GMP
- MZBC Approve Construction Start Date
4Master Plan Options
- In a series of meetings MGA presented multiple
Master Plan concepts. - After several iterations and much prayer, the
committee has selected the plan we feel God is
leading us to.
5Projected Community Growth 2005 - 2010
- Within a 5 mile radius of the church
- Population Growth Rate 8 (4200)
- Household Increase 11 (2200)
- BRAC will result in 4100 new federal jobs (13000
including contractor support), approximately
20,000 new Madison Co. residents.
These numbers are from SBOM and chamber of
commerce (conservatively estimated) and pre-date
BRAC info.
6Church Growth Projections
Based on MGA Projections, growth spikes coincide
with construction
1 Parking based on 2.25 passengers per car 2 2005
numbers are actual 3 2006 Worship attendance 630
7Current Building Layout
8Master Site Plan COMPLETE
9Master Site Plan - Complete
10Master Site Plan - Complete
Proposed Phase 1
11(No Transcript)
12(No Transcript)
13(No Transcript)
14(No Transcript)
15Master Plan Phase 1
- Includes the following
- Worship Center and Supporting Areas 800 Seat
Capacity 17,500 sq. ft. - Childrens Preschool Education 551 Student
Capacity 15,000 sq. ft. - Fellowship/Commons Area 6000 sq. ft.
- Parking 356 spaces
- The existing West building will be removed prior
to construction.
16Master Plan Phase 1
80 of seating capacity
17(No Transcript)
18Master Plan Phase 2
- Includes the following
- Youth / Education Space 16,800 sq. ft.
- Administration 6,400 sq. ft.
- Fellowship/Commons Area 4,500 sq. ft.
- Parking 556 total spaces
- The rear section of the existing East building
will be removed prior to construction.
19(No Transcript)
20Master Plan Phase 3
- Includes the following
- Education Space 17,300 sq. ft.
- Administration 6,400 sq. ft.
- Fellowship/Commons Area 4,500 sq. ft.
- Parking 556 total spaces
- The forward section of the existing East building
will be removed prior to construction.
21(No Transcript)
22(No Transcript)
23(No Transcript)
24Existing Building Disposition
- Current Sanctuary Not impacted
- CMC Not impacted
- West Building Removed prior to Phase 1
- East Building Removed prior to Phases 2 3
- Fellowship Hall TBD, we may choose to use the
structure in Phase 2. - Missionary House We will need to ultimately
remove to accommodate more parking. Our desire is
to keep it as long as possible, but it may need
to be removed as early as summer 2007 (after the
Wilkinsons move).
25Committee Recommendation
- Approve the Revised Long Range Master Plan as
presented. - Church enter into a contractual agreement with
MGA to complete the preliminary design of Phase
1 of the Master Plan. Included in this approval
is the expenditure of funds from the existing
building fund balance not to exceed 325,000,
such expenditure to include the following - Preliminary Design Expenses (AE)
- Design Management GMP Preparation
- Survey Topo Map
- Sewage Hook-up Septic Tank Removal
- Challenge to Build Expenses
- Other miscellaneous expenses