... 'front loaded' and consensus based to reduce future costs to the City ... City Council Presentation. Public Meeting 1. Stakeholders Group Check-in. Draft Report ... – PowerPoint PPT presentation

Number of Views:36
Avg rating:3.0/5.0
Slides: 21
Provided by: rockyj
Category:
Tags: seh | presents | team

less

Transcript and Presenter's Notes

Title: SEH Team Presents How


1
SEH Team Presents How
  • Windom Dam Feasibility Study Leads to a Publicly
    Approved Dam Removal/Repair Project
  • for theCity of Windom

2
Windom Dam needs an immediate solution
3
Proposed SEH Team provides all required
experience
  • Key team members
  • Steve Robinson Client Service Manager
  • Rocky Keehn Project Manager
  • Jeremy Walgrave Project Engineer
  • Support team members
  • More than 150 years combined experience in
    geotechnical, structural, environmental,
    hydrology, and hydraulics, planning
  • Financial Advisory Team (F.A.T.)

4
Successful final project minimizes total project
cost
5
Successful final project minimizes total project
cost
6
Successful final project minimizes total project
cost
7
SEHs approach is front loaded and consensus
based to reduce future costs to the City
8
Consensus Based Approach (CBA) assures City will
make the right final decision
City Council Presentation
Final Report
FOUNDATION
City Staff Interview
Data Collection
Stakeholders Group Meeting
Charrette or Brainstorming
9
SEHs proposed project approachreduce final
project costs
  • Stakeholders group
  • Open house style public meetings
  • Charrette/brainstorming session
  • Project financing options

10
Stakeholders group involvement builds project
consensus
Implementation
Construction
Future Phase Support
Plans and Specifications
Public Works
ProDam
MnDOT
DNR
Council
Citizens
Parks
11
One-on-one public meetings allow for concise
input from citizens
QA at end of presentation
Internet questionnaire prior to meeting Written
feedback from meeting Display boards One-on-one
feedback
Open House
12
Evaluating project financing options determines
the out of pocketproject cost to the City
13
Evaluating project financing options determines
the out of pocket project cost to the City
14
Charrette process leaves no project issues
unaddressed
  • One day onsite event
  • Direct involvement of experienced team
  • Approach includes City staff and key agency
    technical staff
  • Several alternatives can be evaluated
  • Propose eight preliminary alternatives

15
Feasibility Study contains all the required
information and more
  • Feasibility Report
  • Four options including hydroelectric
  • For each option will provide
  • Drawing
  • Total project construction cost estimates
  • Funding alternatives to pay for project
  • Permit requirements and associated costs
  • Operational and Maintenance costs
  • Final estimate of out of pocket costs to the
    city

16
Feasibility Study contains all the required
information and more
  • Technical Appendix
  • Information (minutes, etc.) from all meetings
  • Information from Charrette Process
  • Other additional technical or research information

17
SEHs project experience closely matches the
requirements of Windom Dam Project
  • Dam removals
  • Rock dams
  • Dam rehab
  • Hydroelectric

18
Hiring SEH for the Windom Dam Feasibility Study
ensures a publicly approved dam removal/repair
project
  • SEHs project experience closely matches the
    requirements of Windom Dam Project
  • Feasibility Study contains all the required
    information and more
  • A Consensus Based Approach (CBA) ensures City
    will make the right final decision

19
Hiring SEH for the Windom Dam Feasibility Study
ensures a publicly approved dam removal/repair
project
  • SEHs project experience closely matches the
    requirements of Windom Dam Project
  • Feasibility Study contains all the required
    information and more
  • A Consensus Based Approach (CBA) ensures City
    will make the right final decision
  • Our approach minimizes final "out of pocket"
    project costs to the City

20