South Ayrshire Sustainability Forum - PowerPoint PPT Presentation

About This Presentation
Title:

South Ayrshire Sustainability Forum

Description:

Developed a Remediation Guide which summarised remediation techniques ... Developing Suppliers standards and Buyers Guide to Green procurement. Greening our Suppliers ... – PowerPoint PPT presentation

Number of Views:90
Avg rating:3.0/5.0
Slides: 39
Provided by: ABro5
Category:

less

Transcript and Presenter's Notes

Title: South Ayrshire Sustainability Forum


1
George Wimpey
2
Summary
  • Background
  • Measuring environmental improvements
  • Waste
  • Remediation
  • Procurement
  • Sustainability in design
  • Communication and Training
  • Why do we do it?
  • How we compare to our competitors
  • WWF Insight Investment survey

3
Background
4
  • 125 years experience in the house building
    industry
  • 26 regional companies across UK
  • Build from one bedroom apartments to large
    detached family homes
  • First UK volume housebuilder to achieve ISO 14001
    for its EMS - covering design, land development
    house building

5
Key Performance Indicators
6
Environmental KPIs
2003 2004 2005
Measure and maximise number of homes built on brownfield sites (Government target 60 by 2008) 67 68 66
Measure and highlight the average SAP rating of new houses built each year 92 94 95
Measure and reduce the tonnage of waste (t) produced per unit of housing completed 9.7t 9.6t 7.0t
Measure and increase the percentage of waste segregated on site - 83 84
Measure and reduce the percentage of waste sent to landfill - 35 30
Measure and increase the percentage of waste recycled - 65 70
7
Waste
8
  • Generation of waste on site is a big issue both
    environmentally and financially

Key drivers
  • Introduction of Landfill Directive and
    Hazardous Waste Directive
  • Increased landfill disposal costs
  • Limited number of landfills accepting hazardous
    waste

9
What have we done about it?
  • Improved waste management on site through
    segregation

10
  • Inert Clean Waste
  • e.g. broken bricks, broken blocks, broken
    kerbs
  • Recycled where possible

11
  • Waste campaigns to provide practical advice and
    support to site
  • Suppliers assist in recycling i.e British gypsum
    and plasterboard

12
Plasterboard Waste returned to British Gypsum
for recycling
13
Remediation
14
(No Transcript)
15
On site remediation now preferable to dig and dump
  • Promote the use of remediation to reduce quantity
    of contaminated soil to landfill
  • Developed Land Quality Manual to ensure process
    is well controlled and validated
  • Developed a Remediation Guide which summarised
    remediation techniques

16
Guide to Remediation
17
Procurement
18
Green Procurement Policy
19
Procurement
  • Part of suppliers contract to remove certain
    packaging materials
  • Examples
  • White Goods - reduce packaging / recycle
    packaging
  • PvcU Windows/Doors- subcontractors collect and
    return all pallets

20
Procurement
  • Minimise use of toxic and hazardous materials
  • Use
  • dual flush toilets
  • low emission boilers
  • stock energy efficient white goods A and B
    rated
  • All virgin timber in UK comes from sustainable
    sources
  • - FSC certified timber and PEFC certified
    softwood

21
Greening our Suppliers
  • Carried out sustainability survey of suppliers
  • Developing Suppliers standards and Buyers Guide
    to Green procurement
  • Encouraging optimal recycled content of products

22
Sustainability in Design
23
  • Our average SAP rating across our housetype range
    has been independently verified as being 94 - one
    of the highest in the UK for a volume housebuiler
  • Environmental / Ecological Surveys of all major
    new sites
  • Layout of developments to help encourage good
    neighbourliness and create a sense of community
  • Wherever possible houses take advantage of
    southern aspect for passive solar gains through
    enlarged south facing windows
  • Landscape planting to help ensure that shelter
    from cold northerly winds is maximised

24
  • Provision of good access to local and long
    distance path network from the site to encourage
    people to walk to access local services, where
    possible
  • Houses have designated spaces for at least two
    wheelie-bins to enable separation of household
    waste
  • Embracing change in urban design developing
    schemes which support greater emphasis on green
    links with priority given to pedestrian / cycle
    movement, improved access to public transport and
    reduced impact of the car

25
  • Houses are equipped with low energy light bulbs
    and householders are provided with guidance on
    how to save energy in the home
  • Inclusion of sustainable urban drainage solutions
    SUDS with associated landscape and ecological
    designs. No. of recent examples - retention pond
    in Dalry and our SUDS features at Ardler Dundee
    and in the eastern expansion of Dunfermline are
    cited as textbook examples by Scottish Water
  • Our UK house type range almost achieves a good
    eco rating before any site specific credits are
    awarded

26
The Developers Challenge
  • Customers not always willing to pay premiums for
    an eco-home
  • Facilities not necessarily what required e.g.
    Customers want to park their car and have more
    than one car parking space
  • We can only do so much in a competitive market
    land
  • Others need to play a role in raising awareness
    of these issues to the public to stimulate the
    market

27
Communication and Training
28
Communication and Training
  • Staff and sub-contractors receive extensive
    environmental training
  • Have regular campaigns on environmental issues to
    promote best practice
  • Produce an internal environmental bulletin

29
Communication and Training
30
Employment
31
Employment
  • Apprentice training scheme / older recruits
  • Recruit majority of employees and site operatives
    from local communities around offices and
    developments
  • Committed to qualify entire UK site work force
    under Construction Skills Certification Scheme by
    2010
  • Continuity of employment
  • Growing Wiser - Partnering with Contractors

32
Why do we do it?
33
Why do we do it?
  • Cost savings
  • Examples
  • Fuel spill clean up costs can be several thousand
    pounds.
  • Every cubic metre of land remediated on site
    saves a significant sum in disposal costs
  • Legal compliance saves on fines
  • Management of financial liabilities

34
Why do we do it?
  • Investor relations
  • Socially Responsible pension funds projected to
    account for 15 of UK stock market by 2009
  • Socially Responsible Investment 250 billion of
    institutional investment in the UK, dramatic
    growth in recent years.

35
How we compare to our competitors
36
WWF and Insight Investment survey
  • Benchmarked environmental, social and corporate
    risk management performance of 13 FTSE listed
    housebuilders
  • George Wimpey was one of the three clear
    leaders when Environmental, social and risk
    management issues examined together
  • Noted Integrated sustainability into their
    business strategies and have set clear objectives
    and measurable targets

37
George Wimpey top in Environmental Performance
2005
38
Any Questions?
Write a Comment
User Comments (0)
About PowerShow.com