McMathPierce Update - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

McMathPierce Update

Description:

(2) Comsoft, Tucson AZ http://www.comsoft-telescope.com/ No Bid? ... West library now a useful space with historic drawings, pictures and papers. 23 Jan 2006 ... – PowerPoint PPT presentation

Number of Views:42
Avg rating:3.0/5.0
Slides: 16
Provided by: mpe48
Category:

less

Transcript and Presenter's Notes

Title: McMathPierce Update


1
McMath-Pierce Update

2
McM/P Update
  • The McM/P is a 1.6m all-reflecting windowless
    solar telescope
  • It remains the only large telescope where mid-IR
    (2200?-5000nm) and thermal-IR (12000nm) solar
    data can be taken
  • McM/P SOLIS observing and mountain support 2
    FTE KPNO and 2 FTE NSO (shutdown,etc)

3
McM/P Update
  • NSO Array Camera
  • Imaging tests granulation, night-time
  • Spectroscopy at 2329nm (CO lines)
  • Initial polarimetry at 1565nm
  • Telescope Control System Upgrade
  • Guider
  • Clean-up storage and new work lab

4
NAC imaging tests
5
NAC imaging tests
Star 11.7mag
3 sec exposure H-band filter
6
NAC spectroscopy
7
NAC Spectropolarimetry
8
NAC problems
  • Solved issues
  • Spectrograph shake
  • Data storage (admin?)
  • Serial communication (slow)
  • Old issues
  • Higher noise level
  • Scripting trouble (no loops)
  • Spectrograph mounting
  • New issues
  • Fringes
  • Well depth too low (electronics trouble)

9
TCS Goals
  • Replace PDP 11 and relay cabinet (predates CAMAC
    technology by 10 years)
  • Modern code support and interface with new
    instruments
  • OTS components
  • Hand-paddle, scripting abilities
  • Integrate main spectrograph
  • Telescope relative pointing arcsecond scale
  • Solar coordinate pointing ability

10
TCS Upgrade - Status
  • Request for quotes written soliciting final
    comments.
  • Announcement target 1 Jan 2006
  • Select Spring 2006
  • Begin work Spring/Summer 2006
  • Finish in one-year
  • RFQ complete
  • 13 vendors identified
  • Mailed (15 Jan)
  • Select Spring 2007
  • Begin work Spring/Summer 2007
  • Finish one-year

11
TCS Upgrade - Vendors
  • (1) DFM Engineering, Longmont CO
    http//www.dfmengineering.com/index1.html
  • No Bid because of the way the specs were written
  • (2) Comsoft, Tucson AZ http//www.comsoft-telescop
    e.com/
  • No Bid?
  • (3) Astronomical Consultants Equipment Inc
    (ACE), Tucson http//www.astronomical.com/
  • Submitted Bid does not address upgrade
    realistically, 1.7 times estimated cost
  • (4) Optical Mechanics, Inc. (OMI), Iowa City, IA
    http//www.opticalmechanics.com/
  • No Bid out of range of capabilities
  • (5) EOS Technologies, Inc., Tucson AZ
    http//www.eostech.com/
  • No Bid too much risk
  • (6) The Pilot Group, Monrovia, CA
    http//www.the-pilot-group.com/index.html
  • No Bid?
  • (7) Observatory Sciences Ltd., Cambridge, United
    Kingdom http//www.observatorysciences.co.uk/
  • No Bid out of range of capabilities
  • (8) Cosylab, Ljubljana, Slovenia
    http//www.cosylab.com/
  • Submitted Bid 1.5 times estimated cost

12
TCS Upgrade
  • What do we do now?

13
Guider
  • Goals
  • Test and verify TCS upgrade
  • Replace old limb guiders
  • Allow pointing to 1.5 solar radii
  • Provide full-disk solar image (?)
  • Hardware CCD vs limb guider
  • One flat pickoff mirror between M1 and M2
  • Beamsplitter, H-alpha filter, 2 imaging lenses,
    CCD camera and video, PC control computer

14
Facility Clean-up
  • Goals
  • salvage or cannibalize any equipment which has
    not been used in the past 5 years
  • empty east instrument storage room and convert to
    a clean lab space
  • make new optics storage system
  • use west instrument storage room for storage of
    visitor instruments
  • Results
  • New semi-clean instrument lab
  • AO, NAC and visitor instruments now stored in
    west hallway
  • New optics and equipment cabinets in east hallway
  • Many truckloads of old equipment hauled away
  • West library now a useful space with historic
    drawings, pictures and papers.

15
Notes
  • E maintainence
  • 3 guys total
  • FTS?
  • Spare AO planetary grant mercury end 2007
  • Fringe merrill
Write a Comment
User Comments (0)
About PowerShow.com