Title: Comal County Chip Sealing


1
Comal County Chip Sealing
June 26, 2007
2

3
(No Transcript)
4
(No Transcript)
5
(No Transcript)
6
(No Transcript)
7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
Chip sealing is the application of a bituminous
binder immediately followed by the application of
an aggregate. The aggregate is then rolled to
embed it into the binder.
Binder Application
Aggregate Application
Rolled
18
Advantages of Chip Sealing
  • Improved Skid Resistance
  • Cost Effective Treatments
  • Good Durability (Typically 5-7 Years)
  • Ease of Construction
  • Chip Seal 1 Mile/Day
  • Asphalt 1 Mile/Week

19
Disadvantages of Chip Sealing
  • Flying Chips Broken windshields and vehicle
    damage
  • Noise Considerations Chip seals can be noisy
    to travel on
  • Weather Considerations Must be constructed
    during warm, dry weather during daytime only
  • Pedestrian Not good for roller-blading
    skateboarding

20
Materials
Binders must provide good adhesion, or stickiness
  • Aggregates must have following characteristics
  • Single-sized, if possible
  • Clean
  • Angular (not rounded)
  • Aggregates must be damp for emulsion use

21
Construction Process
Surface Preparation
  • Crack Sealing or Filling of Cracks
  • Patching Deteriorated Areas
  • Cleaning or Brooming Any Loose Material
  • Removing Pavement Markers and Delineators

22
Construction Process
Binder Application
  • Uniformly Apply the Binder Over the Surface at a
    Designed Rate
  • Pavement Surface Temperature Should be 55ºF and
    Rising
  • Humidity Should be 50 or Lower
  • Most Important Step in Process

23
(No Transcript)
24
Construction Process
Aggregate Application
  • Should Follow the Binder Application by no more
    than 90 Seconds
  • Should be no more than 100 Feet Behind
    Distributor Truck

25
Construction Process
Aggregate Application
  • Should Follow the Binder Application by no more
    than 90 Seconds
  • Should be no more than 100 Feet Behind
    Distributor Truck

26
Construction Process
Rolling
  • Initial Rolling by Pneumatic Roller or Steel
    Rollers
  • Compaction by Traffic Finishes the Process
  • Should be Done During Hotter Weather
  • Should Follow Aggregate Spreading by no more
    than 500 Feet
  • Minimum of Two Rollers Should be Used to Cover
    the Full Width of the Chip Spreader

27
(No Transcript)
28
Construction Process
Brooming
  • After Chip Seal, Excess Aggregate Must be
    Broomed Off
  • Within 2 to 4 Hours after Sealing

29
(No Transcript)
30
Possible Problems
  • Bleeding Too much binder leading to leaking
    of emulsion
  • Traffic Control Ensure that vehicles do not
    drive on binder application
  • Shelling Aggregate not applied in a timely
    manner. Binder sets. Aggregate does not stay
    in place.

31
(No Transcript)
32
Comal County Canyon Lake Spillway Canyon
June 26, 2007
33
Storm Total for 1998
1998 Storm Totals
34
Storm Total for 2002
35
Structural Flood Control Measures in Comal County
Canyon Reservoir
36
Structural Flood Control Measures in Comal County
Emergency Spillway
37
Structural Flood Control Measures in Comal County
x