Title: APS Dual Site ECC


1
APS Dual Site ECC
CIPC Confidentiality Public Release
  • Primary Site Shutdown/Restart

2
The Need for a Power Outage
  • Information Services installing a new UPS for
    Business Continuity.
  • Two feeder breakers identified as needing
    replacement.
  • Power outage to entire building during breaker
    work.
  • ECC Migration to alternate site

3
EMS/ECC Shutdown
  • Failover primary EMS application functions to
    alternate site.
  • Failover front-end processors to alternate site.
  • Failover EMS business applications to alternate
    site.
  • Failover primary EMS network communications to
    alternate site.
  • Ensure ECC personnel onsite at DV-ECC and ready
    for site cutover.
  • Prepare and test Avtec communications for
    transition to alternate site.

4
EMS/ECC Shutdown
  • Ensure EMS support personnel are at both sites
    and ready for cutover.
  • Transfer Avtec communications from primary site
    to secondary site.
  • Shutdown ECC consoles at the primary site.
  • Ensure cutover is complete.
  • Obtain ECC approval and power down all remaining
    EMS servers and related equipment.

5
EMS Functional/Logical Distribution
6
EMS/ECC Restart
  • Ensure EMS support personnel are at both sites
    and ready for cutover.
  • Restart and validate operation of computer
    network switches at primary site.
  • Restart and validate operation of the Avtec
    communication equipment at primary site.
  • Restart and validate operation of EMS Business
    application services at primary site.
  • Failover primary EMS network communication to
    primary site.

7
EMS/ECC Restart
  • Power up and validate EMS application running in
    backup configuration from primary site.
  • Transfer Avtec communications from secondary site
    to primary site.
  • Failover front-end processors to primary site and
    validate proper scanning.
  • EMS servers functionally evaluated in backup
    configuration at primary site.
  • ECC move from secondary location to primary
    location.

8
Learning's and Action Items
9
Learning's and Action Items
10
Conclusion
  • Breaker replacement was successful.
  • Processes and scripts have demonstrated success
  • APS EMS/ECC functionally split between sites.