CASH FROM TRASH AT TMMK - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

CASH FROM TRASH AT TMMK

Description:

... cotton/leather gloves, process wax paper, and cotton rags. ... The Waste is processed for approx 10 days, and then staged in windrows for 3-6 months. ... – PowerPoint PPT presentation

Number of Views:177
Avg rating:3.0/5.0
Slides: 16
Provided by: tet
Category:
Tags: cash | from | tmmk | trash

less

Transcript and Presenter's Notes

Title: CASH FROM TRASH AT TMMK


1
CASH FROM TRASH AT TMMK
2
TOYOTA
Toyota Motor Manufacturing Kentucky
7.92 million sq. ft. under roof
Approximately 7,000 Team Members
Manufacturing over 500,000 vehicles annually
ISO 14001 CertifiedKY EXCEL-Charter Member
US EPA Energy Star Award 2003 2007
Coming Soon
EPA Sustained Excellence Award 2006
Plant Energy Award 2006
VENZA
Kentucky Governor's Award for Science
TechnologyUS EPA National Performance Track
member
CAMRY HYBRID
CAMRY
AVALON
EA_001823_00
3
WASTE
  • In 2004, Toyota achieved Zero Landfill status by
    a very methodical process of waste
    identification.

4
WASTE
  • TMMK has significantly reduced its landfill
    volume by 16,000 tons per year.
  • The only way TMMK can achieve this reduction is
    by Reducing, Reusing and Recycling.
  • Any person on the TMMK site is expected to
    segregate all the waste they generate into
    reusable or recyclable waste streams.

5
BREAKAREA CAFETERIA WASTE
  • Aluminum Cans
  • Plastic Bottles
  • Paper
  • Other Waste
  • Compostable Waste

6
BREAKAREA OFFICE SEGREGATION
CAFETERIA SEGREGATION
7
LINE SIDE PROCESS WASTE
  • Commercial Solid Waste by-product generated from
    vehicle production and non-production processes
    that can be reused, recycled, or reclaimed. The
    term Process Waste does NOT refer to wastes
    that are regulated as Used Oil, Universal Waste,
    or Hazardous Waste, or Industrial non-regulated
    waste.
  • Process Owner is responsible for proper
    segregation on line
  • Training available on Intranet for all team
    members
  • Line side process waste segregation and recycling
    animation
  • Waste Segregation/Recycling Training Packet

8
LINE SIDE PROCESS WASTE SEGREGATION
9
LINE SIDE PROCESS WASTE
ROSIE CORRAL
SEGREGATED WASTE CARTS
10
RECYCLING
  • Recycled in 2007
  • Steel 97,000 tons
  • Aluminum 2,600 tons
  • Plastic 2,000 tons
  • Cardboard 500 tons
  • Paper 30 tons
  • We also recycle copper, glass, wood, electronic
    scrap, rubber, kevlar gloves and sleeves, etc.

11
COMPOSTING
  • We process about 1.5 tons, or 500 bags, of
    Compostable Waste daily (thats 400 tons a
    year!).
  • This Waste consists of café waste, R/R paper
    towels, cardboard, cotton/leather gloves, process
    wax paper, and cotton rags.

12
TURNING TRASH INTO TREASURE
  • The Compostable Waste is transported, mixed with
    other organic waste, and loaded into TMMKs
    on-site In-Vessel Composter.
  • The Waste is processed for approx 10 days, and
    then staged in windrows for 3-6 months.

13
Flowers, bedding plants, vegetables start
growing here
Landscaping flower beds
TMMKs six-acre garden tomatoes, beans, corn,
pumpkins, peppers, cabbage, broccoli, cauliflower
14
Team MemberInvolvement
  • Quality Circles
  • Kaizens

15
QUESTIONS
Write a Comment
User Comments (0)
About PowerShow.com