Title: Tom Brockbank, PE
1CENTERS OF STANDARDIZATION SAS PROGRAM
OVERVIEW 1 July 2009
Tom Brockbank, PE Engineering Division, Design
Branch Chief, COS Section
Mike Sydow, PE Programs and Project Management
Division Assistant Chief, Programs Project
Management Division
2Direction from Army Secretariat
- Develop a strategy and implementation plan to
support the major permanent restationing
initiatives that the Army will execute. - Overall objective is to provide the ability to
establish, reuse/re-purpose facilities with
minimum lead-time, leverage private industry
standards and practices and to reduce
acquisition/lifecycle costs. -
DASA IH, Nov 2004
3The USACE Solution
- MILCON Transformation (MT)
- Implementation began during FY-06
- Focused on industry standards and practices
- Initially predicated on use D-B acquisition
process - Transition to use of Adapt-Build Models in FY-09
and beyond - Centers of Standardization (CoS)
- Transition to become mandatory Corps design and
contracting centers - Use MT process to arrive at Continuous Build
Program for assigned facilities - Achieve standardized facilities
- Select contractor pool building the same facility
over and over - Consistent engineering / construction /
acquisition application - Build a long-term relationship with select
contractors
4Execution Goals
- Turning dirt in the year of appropriation
- Occupancy within 18 months of NTP
- Build a quality facility within the 1391 Program
Amounts - Ability to lower unit costs (15 reduction
incorporated at time of programming) - Ability to absorb detrimental market conditions
- Achieve Army sustainability energy reduction
goals - Continue to meet Army/DoD Small Business
requirements
5Centers of Standardization
- Ft. Worth District/SWD (7)
- Unaccompanied Enlisted Personnel Housing
- Basic Training Complex/One Station Unit Trainee
- Advanced individual Training Complex
- Reception Barracks
- Warriors In Transition (WIT)
- General Purpose Warehouse
- Central Issue Warehouse
- Norfolk District/NAD (7)
- General Instructional Facility
- Classroom 21
- Enlisted personnel Dining Facility
- Mil. Entrance Processing Stations
- Family Housing RFP
- Information Systems Facility
- Criminal Investigation Facility
- Savannah District/SAD (6)
- Brigade Operations Complex
- Tactical Equipment Maintenance
- Company Operations Facility
- Battalion HQ
- Brigade HQ
- Command Control Facility (C2F)
- (Shared responsibility w/SAM)
- Division HQ
- Corps HQ
6Centers of Standardization
- Huntsville Center (15)
- Physical Fitness
- Outdoor Sports Facility
- Child Development (2)
- Youth Activity Centers
- Consolidated Fire, Safety and Security Facility
- Fire Station
- Army Community Service Center
- Bowling Center RFP
- Hazard Material Storage
- Range and Training Lands
- Close Combat Tactical Trainer
- Mil. Ops. Urban Terrain Facility
- Training Ranges
- Battle Cmd Training Ctr.
- Training Support Ctr.
- Medical Facilities
- Louisville District/LRD (2)
- Army Reserve Centers
- Operational Readiness Training Complex
- Omaha District/NWD (2)
- Religious Facilities
- Access Control Points
- Honolulu District/POD (2) OCONUS
- Unaccompanied Officers Quarters
- Transient Officers Quarters
- Mobile District/SAD (2)
- Aviation Vertical Construction
- Command Control Facility (C2F) (Shared
responsibility w/SAS) - Numbered Army/Army Service Component Command
(ASCC) HQ - Army Command (ACOM) HQ
7Three Phases of MT Transition
Phase 3 FY09-11 MILCON
- Fully develop Adapt-Build /
- BIM Model
- Move toward Adapt-Build D-B-B
- contracts / task orders using
- standardized designs
Phase 2 FY08 MILCON Program
- Stand-up COSs and program
- COS Awards facility IDIQ contracts using RFP
Wizard - for regional MATOCs
- Gather / incorporate best practices
Phase 1 FY06 07 MILCON Program
- Invite Construction Industry feedback, pilot
projects - Identify and begin Stand-up of facility Centers
of Standardization (COS) - Geographic Districts award contracts using the
USACE D-B Model RFP template. - Use industry standards, codes and processes
- Contains non-prescriptive bubble diagrams,
performance reqmts of facility standards - Uses standardized award and post-award
construction processes and activities -
8Adapt-Build (A-B) Approach
- WHAT IS A-B
- HOW IS IT PRODUCED
- HOW IS IT DELIVERED
- WHY IS A-B REQUIRED
9Adapt-Build (A-B) Approach
- WHAT IS A-B A-B is the next step in the
evolution of the MILCON Transformation initiative
to achieve standardized facilities. It draws
upon design solutions from both private and
public sectors to arrive at a design model that
can be repetitively constructed with minimal
adaptation in a given geographical location.
10Adapt-Build (A-B) Approach
- HOW IS IT PRODUCED SAS adapt-build models are
predicated on design products received from
successful D-B proposers for CoS contracts
awarded during FY-08. These models consist of a
100 complete design package for a typical
(sample) application of each assigned facility
type (TEMF, COF, and Bn/Bde HQ). These sample
designs will include a BIM product, 2-D
construction drawings, and UFGS formatted
specifications.
11Adapt-Build (A-B) Approach
- HOW IS IT DELIVERED
- For FY-09, begin using D-B solicitations with a
sample adapt-build model attached as an
appendix, and allow D-B proposers to adjust
technical elements of the design as necessary to
meet site specific requirements. - In FY-10, the CoS or local Geographic District
will begin developing 100 site specific designs
predicated on the adapt-build models prior to
construction advertisement, and solicit as D-B-B
task orders against the CoS MATOCs.
Approximately 1/3 of program will solicited in
this manner, with 2/3 still executed as D-B task
orders with a sample A-B model solution included
as a reference. - In FY-11, all solicitations for standardized
facilities will be predicated on the A-B process
with 100 site specific designs provided at
construction advertisement.
12Adapt-Build (A-B) Approach
- WHY IS A-B REQUIRED
- To achieve repetitively built, standardized
facilities - Minimize re-design effort and associated costs
for these repetitively built facilities
13MILCON Transformation Design Evolution
14SAS CoS Program Summary
15CoS Regional Acquisition Map
Three 8(a) NWR MATOC
NER
NWR
Tobyhanna Army Depot
Scranton AAP
Carlisle Barracks
Letterkenny AD
Aberdeen Proving Ground
Ft Detrick
Ft. AP Hill
Adelphi Lab Ctr
Fort Eustis
Parks RTFA
Fort Monroe
Fort Lee
Fort Story
Moffett Field RFTA (USAR)
Radford AAP
Ft. Meade
Walter Reed
Fort McNair
Fort Myer
Fort Belvoir
SWR
Fort Bragg
MOT Sunny Point
Fort Jackson
Fort Gordon
Fort McPherson
Fort Benning
Fort Gillem
Fort Rucker
Fort Stewart/Hunter AAF
SER
Mississippi AAP
USAG Miami
Three UR Western Region MATOC
Fort Buchanan
Two Eastern Region MATOC HubZone, 8(a)
16SAS CoS Facilities
FY09 1T, 1C FY11 2T, 1C, 1H FY12 1T, 1C,
1H FY13 2T, 3C, 1H
NWR
Fort Lewis
NER
FY08 1T
FY08 1T FY09 3T,3C, 3H FY10 1T, 1C, 1H FY11
2T, 3C, 3H FY12 3T, 4C, 3H FY13 1C, 1H
FY09 2T, 3C, 2H FY10 1T, 2C, 2H FY11 1T,
1C, 1H FY12 1C, 1H
Fort Drum
FY08 1T, 1C, 1H FY09 2T, 2C, 2H FY10 1T,
2C, 2H FY11 1T, 1C, 1H FY13 1C, 1H
FY12 4T FY13 1T, 4C, 1H
FY09 1C FY13 1T
West Point
FY13 1C, 1H
Fort Eustis
Fort Belvoir
Fort Leavenworth
Fort Lee
Fort Story
Fort Carson
FY09 1C
FY08 1C, 1H FY10 2T, 1C FY11 4T, 6C, 5H
Fort Leonardwood
FY08 1C, 1H FY13 2T
Presidio of Monterey
FY08 1C, 2H FY09 2C FY10 1C, 1H FY11
1T,2C, 1H FY12 2T FY13 1T, 3C, 2H
Fort Bragg
Fort Knox
Fort Campbell
Fort Irwin
Fort Jackson
Fort Sill
SWR
FY08 1C, 1H FY12 1T, 1C, 1H FY13 1T, 1C, 1H
White Sands Missile Range
McAlester AAP
FY08 1C FY11 1T, 1C, 1H
HAAF
Fort Stewart
Fort Benning
Fort Polk
Fort Bliss
FY08 1H FY09 1 C, 1H FY10 1 C, 1H FY11
1C, 1H FY12 1C, 1H FY13 1T, 1C, 1H
Fort Hood
FY08 1T, 1H FY09 2T, 3C, 1H FY10 6T, 5C,
2H FY11 1T, 1C, 1H FY12 2T, 1C, 1H FY13 1T,
1C, 1H
Fort Sam Houston
FY08 2H FY09 1C, 1H FY11 1T, 2C, 1H FY12
1C, 1H FY13 1T
FY08 1T, 1C
FY09 1C FY12 1C, 1H FY13 1T
FY09 1T, 1C FY10 2T, 1C FY11 2T, 3C, 2H
SER
17Approved COS Acquisition Plan
18Pending CoS Acquisition Plan Strategy
REQUESTING APPROXIMATELY 2.9B TOTAL CAPACITY
19CoS Challenges
- The largest construction program in the Armys
history has resulted in a substantial workload
increase, combined with adopting new business
processes. - Variability of program is forcing changes to the
acquisition strategy. Amendment pending to CoS
acquisition plan to add capacity for FY10. - Impacts of the economy on industry.
- Cost of doing business (labor, commodity prices,
credit) - Ability to secure bonding, especially for Small
Business - Meeting Small Business Goals.
20What Is USACE Doing to Respond
- Leverage internal resources throughout USACE to
ensure that execution schedules are met. SAS
delegated authority to Geographic Districts to
award CoS Task Order Awards. - More coordination between districts to minimize
the number of concurrent RFPs being issued to
same MATOC pool. - Provide industry advance notice of planned RFP
issuance for new and established contracts. - Standardization of Installation Design Guide and
Area Development Guide requirements (WIZARD,
Paragraph 6). - Conduct Regional Industry Days.
21 22Back-up Slides
23Army Expectations for Standardization
- Secretariat / VCSA Must have consistent
delivery of Army facilities. - Soldiers should have facilities w/same
capabilities and features regardless of where
they are - Why do I pay for the design of a barracks over
and over again? DASA(IH) - Why dont my facilities look and act the same
from one placeto another? VCSA
- Functional Proponent Facilities must meet
functional and operational needs. - Functional operational requirements reflect
Current Future Force needs - How do I ensure what is built will support
emerging initiatives and programs? DCS, G-4 - What facility capabilities or limitations do we
need to consider for FCS? DCS, G-8 FCS
Training Supportability IPT
247 Keys to MILCON Transformation
- 1. Greater emphasis on master planning
- 2. HQDA and Army functional proponent determines
mandatory requirements for each facility type - 3. Standardization of facilities processes
- 4. Change how we execute
- 5. Continuous building program
- 6. Use of manufactured/pre-engineered components
- 7. Teaming with customers and industry
25CoS Goals
- Goal for end-state Develop standard design to
an 80 regional solution (spiral development) - FY-08 Program Develop a basic floor plan for
use in D/B RFPs. Evolve existing standard
designs to the 80 solution and utilize in
adapt-build (D-B) contracts to the maximum extent
possible. - FY-09 Program Incorporate best designs from the
FY-08 model RFP packages and proceed further to
the 80 solution with eventual goal of a
site-adapt model. -
(from OPORD, Annex U)
26CoS Strategy
- Moving away from acquiring facilities one at a
time - MCA Program Execution as a continuous building
program - Maintain strong support to installations through
continued geographic district PM and cradle to
grave project involvement
27COS Standard Designs
- Warfighter focused priorities on functional and
operational scope/needs - Adaptive Open-space designs and construction
that can be easily modified as missions change. - Pragmatic - use the best industry practices for
sound, economic facilities that can be
constructed in the shortest time period
28Barracks IDIQ (SWF)
GYM IDIQ (HNC)
Chapel IDIQ (NWO)
Headquarters IDIQ (SAS)
DFAC IDIQ (NAO)
SITE WORK (GEOGRAPHIC DISTRICT)
COF IDIQ (SAS)
TEMF IDIQ (SAS)
29COS Geographical District Responsibilities
- COS Responsibilities (8 CoS Districts)
- Develop maintain Army Standards (criteria) and
Standard Designs - Represent Army in facility design decisions
related to materiel and operational issues
(DOTMLPF), i.e. Program Certification, Project
Definition, Project Development - Design Consultant for Geographical Districts
- Prepares RFP Statement of Work (SOW) packages for
assigned facilities - Award CoS contracts maintain KO authority or
delegate as deemed appropriate to Geographic
Districts - Manage/monitor the Program for facility
uniformity and consistency - Incorporate lesson learned
- Geographical District Responsibilities (All
Districts) - Retain PM Responsibilities
- Manage / distribute project PD Funds
- Develop project specific requirements site,
utilities, environmental coordination,
geotechnical investigation, and topographical
survey - Coordinate local installation / DPW requirements
- Manage execution of projects in AOR
- Perform construction supervision (ACO on COS
facilities)
30SAS Adapt-Build (A-B) Approach for FY-09
- Adapt-Build Solicitation Language
- An Adapt-Build Model for a TEMFCOFBn/BdeHQ,
which contains a fully developed design,
including a Building Information Model (BIM), 2-D
CADD files, and specifications, can be downloaded
from the following FTP site ftp//ftp.usace.arm
y.mil/pub/sas/TEMF/ ftp//ftp.usace.army.mil/pub
/sas/COF/ ftp//ftp.usace.army.mil/pub/sas/BDE-B
N_HQ/. This design is provided as a guide that
exemplifies a technically suitable product and
incorporates mandatory functional/operational
requirements for a similar (although perhaps not
an exact) facility to be constructed under this
solicitation. It will be left to the offerors'
discretion if, and how, they will use the sample
design provided to satisfy the requirements of
this Request for Proposal. This model is not
intended to modify or over-ride specific
requirements of this RFP and, under all
circumstances, it will be incumbent upon the
successful offeror to adhere to the site specific
scope and functional/operational requirements
specified within the RFP. Neither this statement
of work, nor the adapt-build model, are intended
to diminish the offerors responsiblities under
the clauses titled Responsibility of the
Contractor for Design, Warranty of Design, and
Construction Role During Design. The successful
offeror shall be the designer-of-record and shall
be responsible for the final design and
construction product, including but not limited
to, adherence to the installation architectural
theme, building code compliance and suitability
of the engineering systems provided. The
government assumes no liability for the model
design provided and, to the extent it is used by
an offeror, the offeror will be responsible for
all aspects of the design as designer-of-record.