ComET - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

ComET

Description:

... contact points for focused tracking on the poll day. ... For the Poll day, Do ... Ensure that coverage of mobiles, telephones etc gets maximized. ... – PowerPoint PPT presentation

Number of Views:91
Avg rating:3.0/5.0
Slides: 20
Provided by: eci7
Category:
Tags: comet

less

Transcript and Presenter's Notes

Title: ComET


1
ComET Communication Plan for Election Tracking
2
Communication Plan
  • A Perfect Communication Plan is an essential
    component of an effective Election Management
    System.
  • It enables micro-management of elections,
    concurrent tracking and evaluation of issues and
    mid-course corrections.
  • It helps the perception management and creates
    a huge psychological presence
  • It helps the prioritization for intervention.
  • It builds confidence.

3
Communication Plan
  • CP minimizes the response time.
  • Enhances Transparency.
  • As the free and fair elections is not only an end
    product but, a process in itself, effective
    information management energizes the process at
    every level.
  • Piloting during recent general elections (Madhya
    Pradesh, Rajasthan) proved the efficacy of the
    concept.
  • ComET seeks to upscale the plan for a country
    wide application during GE 2009

4
What is ComET
  • ComET is SEARCH enabled Database of Polling
    Station level communication contact points for
    focused tracking on the poll day.
  • The Plan operates through a well structured
    multi-layer Communication Teams (CTs)
  • ARO (Assembly segment level),
  • DEO (District Level)
  • CEO (State Level)
  • ECI (National Level )
  • Communication Teams will have clear demarcation
    of geographical areas and communication-related
    responsibilities geared to quick crisis
    resolution and grievance monitoring and
    information flow.

5
ComET- How it works?
  • The ECI has issued circulars on communication
    plan which are available on the front page of the
    Commissions website
  • Communication Plan circular 1 Dated 28th
    March,09 puts forth
  • Format 1 for Polling Station level CP
  • Format 2A for ARO (Assembly segment) level
    Communication Team groups of 10 to 25 Polling
    Stations to be assigned to 1 member of ARO level
    Communication Team.
  • Format 2B for DEO (District) level
    Communication Team each AC to be given to 2 or
    more persons in the Communication Team.
  • Format 2C for CEO (State) level Communication
    Team each PC/ District to be given to 2 or more
    persons in the Communication Team.

6
ComET- How it works?
  • The Election Commission of India has established
    a well equipped Control Room for the purpose of
    running the Communication Plan on the poll days.
  • The Communication Teams at ECI Head Quarters will
    track Poll Day events through State Level,
    District Level, AC level and at the Polling
    Station level.
  • OK reports and comfort messages will be
    obtained on pre-identified issues and events.
  • Significant events at any locations will be
    monitored in a focused manner.

7
ComET- Is about Team Work
  • Every member of the Communication Team at each
    tier, and the Polling Station level Communication
    Plan must know all contact numbers and other
    details of all the persons associated with him in
    related higher and lower tiers.
  • Every body in the Communication Plan setup must
    be clear as to WHO IS TO TALK TO WHOM, AND HOW.
  • Communication will be professional, focused,
    within the time frame given for tracking
    specific mile-stone feed-backs.
  • No extra word will be spoken.
  • It is not a free-for all, causal communication
    plan. It is about getting the correct information
    from the correct location by the correct persons
    to be passed on to the correct persons in a
    correct manner in correct time.

8
Organizational Tree for the Communication Plan
Level 1
ECI
Level 2
CEO
CEO
CEO
CEO
CEO
CEO
CEO
CEO
CEO
CEO
CEO
CEO
Level 3
DEO
DEO
DEO
DEO
DEO
DEO
DEO

DEO
DEO
DEO
DEO
DEO
DEO

Level 4
ARO
ARO
ARO
ARO
ARO
ARO
ARO
ARO
ARO
ARO
ARO
ARO
Zone/Sector
Zone/Sector
Zone/Sector
Zone/Sector
Zone/Sector
Zone/Sector
Zone/Sector
.
Level 5
Polling Stations
Polling Stations
Polling Stations
Polling Stations
Polling Stations
Polling Stations

9
ComET- The Logistics
  • The Team Members of ARO, DEO and CEO level
    Communication Teams should be given adequate
  • Landline phone connections
  • Mobile phone connections
  • Fax lines
  • E-mail connections with computers/ printers
  • (If the ARO, DEO and CEO level Communication
    Team, as well as the contacts in the Polling
    Station level CP, use their personal mobiles/
    resources for the purpose of running the CP on
    the day of the poll or during dry runs/
    rehearsals, they should be suitably reimbursed
    for the expense they incur in this regard by the
    CEO office.)

10
ComET- Deadlines
  • All Polling Station CP information was to be
    manually collected in handwriting in copies of
    Format 1 at DEO levels by 2nd April, 2009.
  • All information in Formats 2A, 2B, 2C was to be
    sent on the e-mail addresses
  • ecicp2009_at_gmail.com and ashishs_at_eci.gov.in
  • latest by 6th April, 2009.

11
ComET- Deadlines
  • All data entries of Format 1 on the URL
    http//ecicp.nic.in to be completed in a
    staggered manner phase wise as follows
  • Phase Number Original T/L Revised T/L
  • Phase 1 6 April, 2009 11 April, 2009
  • Phase 2 8 April, 2009 14 April, 2009
  • Phase 3 10 April, 2009 17 April, 2009
  • Phase 4 13 April, 2009 20 April, 2009
  • Phase 5 15 April, 2009 24 April, 2009

12
ComET- The Access
  • In order to facilitate faster data entry in the
    web form for Format 1
  • A number of NIC servers across the country have
    been made available for hosting this application
    and database.
  • CEOs can ask their SIO of NIC to explore the
    possibility of hosting their states databases
    (along with the application) at the state level.
  • Phase-wise, PC-wise PDFs of Polling Station wise
    CP data with SEARCH option are being prepared at
    the ECI.
  • ECI shall attempt to make available to CEOs
    PC-wise PDFs for every phase, which the CEOs can
    further provide to the ROs/ DEOs in their states.
  • SIOs of NIC can on parallel basis explore the
    possibility of doing the same in their states.
  • (For data entry the application has been written
    with SQL back-end and ASP front-end).

13
ComET- The Access
  • Analysis and Report options are disabled from
    time to time for the state/ district levels (in
    order to reduce the load arising from such
    queries on servers).
  • CEOs are requested to collect daily District-wise
    progress of data entry of Polling Station CP on
    the web-form through direct information gathering
    and inform the ECI of the same.

14
MOCK-RUNS / REHEARSALS
  • OBJECTIVE
  • To make every person, who is a part of the CP
    set-up - at the PS, ARO, DEO/ RO, CEO, ECI levels
    have hands-on awareness, knowledge and practise
    about his role and responsibilities in the CP.
  • SCHEDULE
  • Phase Number 1st Mock-Run 2nd Mock-Run
  • Phase 1 13 April, 2009 14 April, 2009
  • Phase 2 18 April, 2009 20 April, 2009
  • Phase 3 25 April, 2009 27 April, 2009
  • Phase 4 2 May, 2009 4 May, 2009
  • Phase 5 9 May, 2009 11 May, 2009
  • TIME 2 PM to 4 PM

15
ComET Precautions
  • Keep conversation brief and to-the-point to keep
    the communication channels free from being jammed
    and congested.
  • Ensure constant contacts with service provider
    and ensure the net-works are in good health.
  • Ensure that every person in the hierarchy, who is
    a part of the CP, is fully supplied with all the
    contact numbers and other details of all the
    related persons above and below him in the CP
    hierarchy.
  • Try and keep separate phone lines for incoming
    and outgoing phone calls, where ever possible.

16
ComET Poll Day Priorities
  • Poll day Collection of Information about
  • Conduct of mock-poll and mock-poll certificate
  • Presence and absence of polling agents (specially
    during mock-poll)
  • EVM malfunctioning and replacement-time
  • Tracking of voting by voters from pre-identified
    vulnerable locations
  • Percentage polling from time to time
  • Use of EPIC and other identification documents
  • Significant events at polling stations if any
  • And other reports which must be made available in
    TimeLimits.
  • For the Poll day, Do
  • Ensure that coverage of mobiles, telephones etc
    gets maximized.
  • Enlist and ensure co-operation from individuals
    whose telephone numbers have been incorporated in
    CP with their consent.

17
ComET The Scope
  • The efficacy of this Communication Plan actually
    depends on how many focused calls made by
    Communication Teams on the poll day at every
    level.
  • It is not about how many calls will be made from
    New Delhi but about how many calls are made to
    polling stations by AC/ DEO/ CEO teams.
  • Except for random verifications, the tracking
    protocol should be adhered to. But, random
    contacts from any level to any level is a MUST.

18
ComET Let us take the Call.
  • We Promise to Make Calls from National Control
    Room to Polling Stations across the country, the
    CEOs control rooms, DEO control rooms and AC
    control rooms.
  • The Commission expects that every body who is
    part of this CP, anticipates the Call and he
    TAKES THE CALL.
  • Let us TAKE THE CALL.
  • THIS is THE CALL that WE WONT MISS.

19
THANKS
Write a Comment
User Comments (0)
About PowerShow.com