Title: prsentation Bilan Prospective GAME
1Plans from Météo-France / CNRM and CERFACS for
CMIP5
D. Salas-Mélia, S. Planton, A.-L. Gibelin and A.
Voldoire (CNRM) L. Terray and C. Cassou (CERFACS)
2CNRM-CM3
Introduction
Ozone chemistry MOBIDIC
Aerosol DataGHG
Zonal Statistics
O3
10 years
Atmosphere ARPEGE-Climat, T42, L45
Continental Surfaces ISBA (cycle C)
24h
24h
24h
OASIS
Sea Ice
Ocean OPA 2, L31
Rivers TRIP
24h
3CMIP3 / IPCC AR4
Simulated SST (global mean, year average)
4ENSEMBLES stream 2 simulations
- Recent developments since CMIP3
- Include ARPEGE-Climat 4 (new dynamical core)
- Sulphate aerosols first indirect effect
- Improve ARPEGE-OPA coupling (energy conservation)
- Changing land-use new vegetation map
- New ozone linear scheme
- Impact of volcanic eruptions (stratospheric
aerosols)
5CNRM-3.3 (2008)
- Last millenium climate simulation (CERFACS)
- Simulations of 1860-2000 with CNRM-CM3.3 (DMI,
Denmark), ENSEMBLES project
6ENSEMBLES Stream 2 Control exp. / 20C / 21C-A1B
Simulated SST (global mean, year average)
71. Which model ?
- AOGCM two versions may be available higher
priority - CM4LR Lower resolution ARPEGE-Climat 5
(2.8-L31) NEMO (2-L31) our current model - CM4HR Higher resolution ARPEGE-Climat 5
(1.4-L31) NEMO (1-L31) (promising trials with
ARPEGE 4, 1-L31 / NEMO 0.5-L31) - ESM uncertain
- PMIP tier 1, possibly part of tier 2
- CFMIP
- Off-line COSP calculations, on-line if time
allows
82. Which experiments ?
- Short term decadal
- Run by CERFACS, initialization anomalies,
10-member ensembles - Higher resolution ARPEGE-Climat 5 (1.4-L31) NEMO
(1-L31) - Initial ocean conditions provided by ECMWF
(obtained from NEMO 1 runs) - Long term simulations
- Run by CNRM
- At least all mandatory most very high
priority runs will be done
93. Interactive chemistry, coupled chemistry ?
- Interactive ozone (linear scheme)
- As for CMIP3, but formulation of the scheme is
improved - Aerosols will be prescribed from RCPs
104. When are we starting ?
- Simulations will start in early 2010
- Computing system will be upgraded in March 2009
(NEC) - Current version of CNRM-CM a 1000-yr simulation
takes 4 months to complete on current NEC machine
115. Constraints
- People
- Technical supports for running simulations ok
- Lack of physics developers
- Data storage (publicly available data through
DODS server) - A question how shall we transfer the data to
PCMDI ? - Exchanging 1Tb disks with PCMDI ?