Title: Required Total System Performance RTSP Bernard Miaillier EUROCONTROL
1Required Total System Performance (RTSP) Bernard
Miaillier EUROCONTROL
Agenda Item 3
2Genesis of RTSP
- RCP, RNP, RSP
- Conceived within the FANS Committee
- For CNS Performance Requirements
- Notion generalised to RTSP
- ICAO ATMCP tasked to investigate feasibility
- Future ATM to be performance based (incl.
safety)(see Agenda Item 1, WP/4 - operational
concept ) - Complex topic, initial work aimed at ANC/11
3Need for Performance Orientation
- ATM serves society and air traffic stakeholders
- Various expectations, safety comes first
- Performance, always a reference
- safe, orderly and expeditious flow of traffic
- Performance orientation trend in economy
- Communicate on goals, achievements
- Current and future requirements
- Plans and actual levels
- Support / facilitate decision making
- Understand the effect of changes
- To move system developmentfrom add-ons to goal
driven
4A Performance Framework to Structure Discussion
- Three pillars
- A hierarchy of ATM Performance Concepts
- Accurate models of what drives what
- e.g. cause/effect relationships between
expectations, functions, system components,
concept of use, architecture - Rigorous description of traceable performance
parameters - An approach ISO13236 Quality of Service Framework
5Hierarchical ATM Performance Concepts Models
Level 1 Political and socio-economic
requirements safety, security, environmental
efficiency, costs, etc.
6Quality of Service (QoS) Framework ISO 13236
- Use for RTSP seems appropriate for
- ATM system constituents, even operational
services - they can be represented in terms of information
processing - Describing underlying technical services
- Main requirements covered by 4 characteristics
- Delay - Transient responsiveness
- Capacity - Throughput
- Integrity - Accuracy
- Reliability - Availability
- Illustration
- RNP
- navigation accuracy
- RCP
- 95 transit delay
- message integrity
- reliability/availability
7From Expectations to System Characteristics
Trade-offs, except for safety
Operational concept Scenarios System architecture
RTSP
ATM System
RASP
Expectations
SMART Metrics
Global / regional / local targets Vs global
standards
8RTSP an aggregate of ATM system component
requirements
- Describes the performance of the ATM Concept
Components in a given environment - Adapted to local and user needs
- Defined for most demanding characteristics
- Not independent from available implementation
options - balance between generic (to keep implementation
flexibility), specific (to prevent proliferation
of solutions) - Driven by most stringent requirements
- likely conflict management and navigation
(real-time, safety related decisions) - Summed up by a few Categories only ?
9RTSP / Performance in ICAO Activities
- Framework to facilitate co-ordination of
individual contributions - Planning Tool
- Global, regional or local same model,
consistency, harmonisation - For the target situation and the implementation
steps towards it - Monitoring Tool
- Against objectives, at appropriate level
- Feed back is essential
10Future Work
- Feasibility to be confirmed
- Define metrics
- Further develop the framework
- Distribute individual aspects to panels with an
overall consolidation body - Keep momentum on SARPs development and planning
- Priorities
- Upper layers, definition of indicators/targets
- Understand ATM system behaviour
11Agenda Item 3 Expected Discussion Outcome
- WP/8 basis for discussion
- Conference expected to
- Support performance orientation for future ATM
definition - Call for, and support, more work to
- Formulate and define objectives/targets metrics
- Harmonise all contributions within an overall
framework.
12(No Transcript)