Required Total System Performance RTSP Bernard Miaillier EUROCONTROL - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Required Total System Performance RTSP Bernard Miaillier EUROCONTROL

Description:

Plans and actual levels. Support / facilitate decision making. Understand the effect of changes ... of the ATM Concept Components in a given environment ... – PowerPoint PPT presentation

Number of Views:104
Avg rating:3.0/5.0
Slides: 13
Provided by: gra5153
Category:

less

Transcript and Presenter's Notes

Title: Required Total System Performance RTSP Bernard Miaillier EUROCONTROL


1
Required Total System Performance (RTSP) Bernard
Miaillier EUROCONTROL
Agenda Item 3
2
Genesis of RTSP
  • RCP, RNP, RSP
  • Conceived within the FANS Committee
  • For CNS Performance Requirements
  • Notion generalised to RTSP
  • ICAO ATMCP tasked to investigate feasibility
  • Future ATM to be performance based (incl.
    safety)(see Agenda Item 1, WP/4 - operational
    concept )
  • Complex topic, initial work aimed at ANC/11

3
Need for Performance Orientation
  • ATM serves society and air traffic stakeholders
  • Various expectations, safety comes first
  • Performance, always a reference
  • safe, orderly and expeditious flow of traffic
  • Performance orientation trend in economy
  • Communicate on goals, achievements
  • Current and future requirements
  • Plans and actual levels
  • Support / facilitate decision making
  • Understand the effect of changes
  • To move system developmentfrom add-ons to goal
    driven

4
A Performance Framework to Structure Discussion
  • Three pillars
  • A hierarchy of ATM Performance Concepts
  • Accurate models of what drives what
  • e.g. cause/effect relationships between
    expectations, functions, system components,
    concept of use, architecture
  • Rigorous description of traceable performance
    parameters
  • An approach ISO13236 Quality of Service Framework

5
Hierarchical ATM Performance Concepts Models
Level 1 Political and socio-economic
requirements safety, security, environmental
efficiency, costs, etc.
6
Quality of Service (QoS) Framework ISO 13236
  • Use for RTSP seems appropriate for
  • ATM system constituents, even operational
    services
  • they can be represented in terms of information
    processing
  • Describing underlying technical services
  • Main requirements covered by 4 characteristics
  • Delay - Transient responsiveness
  • Capacity - Throughput
  • Integrity - Accuracy
  • Reliability - Availability
  • Illustration
  • RNP
  • navigation accuracy
  • RCP
  • 95 transit delay
  • message integrity
  • reliability/availability

7
From Expectations to System Characteristics
Trade-offs, except for safety
Operational concept Scenarios System architecture
RTSP
ATM System
RASP
Expectations
SMART Metrics
Global / regional / local targets Vs global
standards
8
RTSP an aggregate of ATM system component
requirements
  • Describes the performance of the ATM Concept
    Components in a given environment
  • Adapted to local and user needs
  • Defined for most demanding characteristics
  • Not independent from available implementation
    options
  • balance between generic (to keep implementation
    flexibility), specific (to prevent proliferation
    of solutions)
  • Driven by most stringent requirements
  • likely conflict management and navigation
    (real-time, safety related decisions)
  • Summed up by a few Categories only ?

9
RTSP / Performance in ICAO Activities
  • Framework to facilitate co-ordination of
    individual contributions
  • Planning Tool
  • Global, regional or local same model,
    consistency, harmonisation
  • For the target situation and the implementation
    steps towards it
  • Monitoring Tool
  • Against objectives, at appropriate level
  • Feed back is essential

10
Future Work
  • Feasibility to be confirmed
  • Define metrics
  • Further develop the framework
  • Distribute individual aspects to panels with an
    overall consolidation body
  • Keep momentum on SARPs development and planning
  • Priorities
  • Upper layers, definition of indicators/targets
  • Understand ATM system behaviour

11
Agenda Item 3 Expected Discussion Outcome
  • WP/8 basis for discussion
  • Conference expected to
  • Support performance orientation for future ATM
    definition
  • Call for, and support, more work to
  • Formulate and define objectives/targets metrics
  • Harmonise all contributions within an overall
    framework.

12
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com