Title: The Palmetto Expressway S.R. 826


1
The Palmetto Expressway (S.R. 826) The Dolphin
Expressway (S.R. 836) Interchange Expansion
Project
Public Information Meeting
  • Financial No. 2495811
  • May 19, 2009

2
Project Overview
  • PROJECT HISTORY
  • First built in the late 1950s
  • Expanded in the mid-1970s
  • Steady increase in traffic during the 1980s
  • Beginning in the early 1990s Palmetto Expansion
    Program divided into 12 sections

3
(No Transcript)
4
Master Plan Concept Project Limits
  • Palmetto Expressway (S.R. 826) project limits
    are just north of NW 12th Street to just south of
    West Flagler Street.
  • Dolphin Expressway (S.R. 836) project limits are
    from just west of NW 87th Avenue to just east of
    NW 72nd Avenue/Milam Dairy Road.

End Project (3880 ft north of NW 12th St)
End Project (3880 ft. north of NW 12th St.)
End Construction (4690 ft. east of NW 72nd Ave.
Begin Construction (2660 ft. west of NW 87th Ave.)
Begin Construction (2660 ft west of NW 87th Ave)
Begin Project (1300 ft. south of West Flagler St.
Begin Project (1300 ft south of West Flagler St)
5
Design-Build Process
  • Design-Build Finance Project
  • Project Maximum Cost 559,000,000
  • Budget includes funds from FDOT, MDX, Stimulus
    (ARRA Funding)
  • Public Information Meetings to continue after
    design-build selection process

Please note that this schedule is tentative and
is subject to change.
6
Project Overview
  • Total Reconstruction of S.R. 826 (Palmetto
    Expressway)
  • Total Reconstruction of S.R. 836 (Dolphin
    Expressway)
  • Construction of direct connectors to provide
    traffic movements between the two expressways in
    all directions.

EXISTING CONDITIONS
CONCEPTUAL IMPROVEMENTS
7
Project Overview
  • Improvements to West Flagler Street Include
  • -Milling, resurfacing and widening of West
    Flagler Street and reconstruction of all ramps
    connecting to S.R. 826
  • -Triple left turns for all movements at S.R. 826
    intersection.
  • Improvements to NW 72nd Avenue/Milam Dairy Road
    Include
  • -Reconstruction of NW 72nd Avenue/Milam Dairy
    Road and all ramps connecting to S.R. 836
  • -Provide connectivity for NW 72nd Avenue/Milam
    Dairy Road
  • -Intersection improvements on NW 11th Street and
    NW 7th Street

8
Project Overview
  • Reconstruction of NW 12th Street underneath S.R.
    826
  • Reconstruction of NW 11th Street between NW 72nd
    Avenue/Milam Dairy Road and NW 72nd Avenue
  • Replacement all existing bridges with the project
    limits
  • Anticipated duration of construction 6 years

(Schedule may vary depending on selected
design-build firm.)
9
Project Benefits
  • TRAFFIC IMPROVEMENTS
  • Less congestion and improved traffic flow along
    two of
  • Miami-Dade Countys most vital corridors
  • Separation of mainline traffic from local
    movements
  • Enhance communications and traffic monitoring
    through Intelligent Transportation Systems (ITS)
    devices.
  • SAFETY ENHANCEMENTS
  • Smoother and safer expressway to expressway
    connections
  • Elimination of all left hand entrances/exits to
    enhance driver expectancy.
  • Enhanced shoulder widths throughout the project
    limits
  • WATER QUALITY
  • Drainage system is being replaced with a more
    efficient system to collect and treat a greater
    amount of rain water
  • LANDSCAPING/AESTHETICS
  • Install low maintenance landscape within project
    limits
  • SOUND BARRIERS
  • Construct sound barriers per state and federal
    regulations

10
Master Project Concept
11
Project Concept
12
Construction Requirements
  • Existing travel lanes on the expressways will
    remain open during construction
  • Expressway to expressway movements will remain
    the same during construction
  • No lane closures allowed during special events or
    peak traffic hours
  • Lane closures to occur during non-peak hours
  • 1000 p.m. 500 a.m.-Monday through Thursday
    nights
  • 1100 p.m. - 500 a.m.-Friday through Sunday
    nights
  • Public Information Specialist to provide frequent
    construction advisories

13
Contact Information
  • The Public Information Specialist is available 24
    hours a day
  • seven days a week to answer any questions you may
    have
  • regarding this project.
  • Please feel free to contact Jeannette Lazo,
    Public Information
  • Specialist at (305) 499-2417 or
    Jeannette.Lazo_at_dot.state.fl.us
  • You may also visit us on the web at
    www.fdotpalmetto.com for
  • lane closure information, project updates and
    etc.