Title: Supplier Introduction
1Supplier Introduction Tutorial 23 October
2007David MichaudSupplier SSC LT Chair
2First Time Mtg Attendees
- Introduce yourself, tell us
- Your Name
- Company Name
- What commodity(ies) will be audited
3Orientation Agenda
- Introduction to Nadcap
- Basic Tools and Advice
- How to Prepare for your Audit
- What to Expect During the Audit
- Important Post Audit Information
- Additional Information
4Welcome to Nadcap
- The leading, worldwide cooperative program of
major companies designed to manage a cost
effective consensus approach to special processes
and products and provide continual improvement
within the aerospace industry. - Nadcap is an industry managed program.
5(No Transcript)
6(No Transcript)
7(No Transcript)
8Industry Managed
Audit Checklist
Process Evaluation/ Improvement
Auditor Qualification Selection
Corrective Actions As Required
Industry experts manage all key steps
Audits Conducted
Audit Results
9PRI/Nadcap Organizational Structure
- Executive leaders
- Legal entity
- Fiduciary responsibility
- Set policy
- Provide the Vision
- Senior quality leaders managers
- Oversee operation of Nadcap
- Establish implement policy procedures
- Task group coordination development
- Identify, develop and deploy improvement
Task Groups Special Processes Chemical
Processing Coatings Heat Treating Materials
Testing Nondestructive Testing NonConventional
Machining Surface Enhancement Welding Systems
Products AQS (AC7004) Composites Distributors Elas
tomer Seals, Sealants Electronics Fluid
Distribution Systems
Supplier Support Committee
- Nadcap Accredited Suppliers
- Provide supplier voice on Nadcap issues
- Focused on issues common to all suppliers that
are non-technical
- Technical Experts
- Determine requirements
- Develop documents
- Accept corrective action
- Final decision on accreditation
10Industry-Managed Active Customer Audits/Certs
11Nadcap eAuditNet Process
Suppliers
PRI Audit Scheduled
Auditor Assigned
Request Audit
Task Group Approval
Audit Completed
PRI Technical Staff Review
Issue Cert
12Orientation AgendaSection II
- Introduction to Nadcap
- Basic Tools and Advice
- How to Prepare for your Audit
- What to Expect During the Audit
- Important Post Audit Information
- Additional Information
13Primary Documents
- The two most important documents you need are
the - Audit checklist
- Audit handbook (if available)
- You will be audited to the checklist AC7XXX as
developed by the Task Group. Secure both from
www.eauditnet.com in advance of the audit
14eAuditNet PRI Website
- www.eAuditNet.com
- Checklists
- Public Documents
- eAuditNet Supplier Guide Pre Post-Audit
Tutorials - Audit Handbooks
- Miscellaneous documents (Auditor training,
Pyrometry, etc.) - User Documents
- www.pri-network.org
- Nadcap, Supplier Info
- PRI/Nadcap from a Supplier Perspective
- Root Cause Corrective Action Tools
- Check both sites often updates are made
frequently
15Nadcap
16Supplier Page
Staff Contacts
eAuditNet
17Checklists
User Documents
Public Documents
18Nadcap Procedure Hierarchy
Roles and responsibilities for Nadcap Auditors,
and technical/administrative clarifications to
facilities.
Detail the procedures by which PRI/Nadcap Staff
operate.
Describe the scope and general procedures for
each specific PRI/Nadcap commodity program.
Procedures by which the Nadcap program operates.
Quality policy describing the quality system of
organization.
Aerospace Standard - requirements for
implementing Nadcap industry consensus-based
accreditation programs.
19NIP 7-04 Accreditation Term
- Your term of accreditation begins in conjunction
with your audit date, not the issue date of your
certificate. - Accreditation terms are tied to the Nadcap
quarterly cycles. - Reference NIP 7-04 on www.eauditnet.com under
User Documents
20NIP 7-07 ITAR/EAR
- The US government has determined that certain
products, processes and technical information
must be controlled. - The documents which control this are
- ITAR International Traffic in Arms Regulation
- EAR Export Administration Regulations
21 ITAR/EAR Supplier Responsibilities
- Determine whether you have material which is
protected under ITAR/EAR. - Contact your customers to be certain.
- If you have material protected under ITAR/EAR,
you must indicate this by answering the ITAR/EAR
question after accepting the supplier agreement
when your audit is scheduled. - This alerts PRI Scheduling as to whether ITAR/EAR
controlled work exists and guides the
assignment of the auditor.
22ITAR/EAR Supplier Responsibilities
- Work with PRI Scheduling - if you have ITAR
controlled material they will attempt to schedule
an unrestricted auditor (one who can look at ITAR
controlled material). - If an unrestricted auditor cannot be scheduled,
you must ensure that only non ITAR work is
presented to the auditor for the audit. - Screen all documents for ITAR controlled
requirement before presenting to auditor. - Details can be found in eAuditNet (Public
Documents) and on the Supplier page of the Nadcap
website.
23Supplier Merit (NOP-008)
- Accreditation term for initial audits is 12
months. - Suppliers with superior performance will be
eligible for longer terms 18 months or 24
months - Merit is based on performance in two consecutive
audits for most task groups. - Eligibility is contingent on no Product Impact
findings and no adverse Supplier Advisories - Each Task Group has specific criteria. Refer to
the NTGOP Appendices, available on
www.eAuditNet.com under User Documents
24Failure Policy (NOP-011)
- Suppliers can fail an audit for
- Supplier stops the audit
- Excessive number of findings
- Severity of findings
- Too many corrective action response review cycles
to close - Nonresponsiveness
- The above criteria are not automatic failure
points the Task Group votes and makes the final
decision - Only 4 of all audits conducted in 2006 resulted
in failure the majority were due to
Nonresponsiveness - Specific criteria determined by Task Group
refer to - NOP-011,User Documents, www.eauditnet.com
25Orientation AgendaSection III
- Introduction to Nadcap
- Basic Tools and Advice
- How to Prepare for your Audit
- What to Expect During the Audit
- Important Post Audit Information
- Additional Information
26Initial Steps
- Register in eAuditNet.com
- Contact PRI Scheduling
- Complete a preliminary questionnaire and return
to Scheduling - Obtain length of audit and cost
- Obtain access to Nadcap checklists
- Schedule Audit
- Pre-Audit Preparation participate in NCSI!
27Pre-Assessment Audit
- You can schedule a pre-assessment audit using a
Nadcap auditor BEFORE your actual Nadcap audit. - Three types procedural review, complete
documentation review, full scope audit. - All the data from the audit will be left with
you. No need to close out findings with Nadcap. - If there is a finding which clearly may affect or
has affected product, it will be sent to the
Primes. - Contact PRI Scheduling and refer to NIP 7-06 for
more information.
28A Nadcap Audit is . . .
- The most thorough and comprehensive audit you
probably have ever had. - Conducted by experts in the field with technical
special process knowledge and background.
The more you prepare the greater success you
will have.
29Quality System Approval
- Before you can receive a Nadcap special process
accreditation, your quality system must be
approved - Nadcap recognized quality systems approvals
- AS9003 and AS/EN/JISQ 9100 quality system
approvals performed by approved registrars -
listed in the IAQG Oasis database.
(www.iaqg.org/oasis). Product groups require
AS9100. -
- ISO/IEC 17025 for testing laboratories (AC7101),
must cover the Nadcap scope of accreditation and
be from an approved NACLA/ILAC accreditation
body. -
- If you have neither of these, you will need a
Nadcap AQS audit to AC7004 or AC7006 (labs) to
support the special process accreditation. - Refer to NOP-002 in www.eAuditNet.com.
30Quality System Approval (Contd)
- Suppliers scheduling an initial Nadcap audit
shall provide PRI a recognized quality system
certification prior to the time the audit is
entered into eAuditNet or an AC7004 assessment
audit shall be scheduled, unless TG requires more
than AC7004. - For reaccreditation audits, where no existing
recognized quality system approval exists,
Suppliers shall have two options - a minimum of 90 days prior to the audit start
date schedule an assessment to AC7004, unless TG
requires more than AC7004 - provide PRI a valid Quality System accreditation
certificate no later than 60 days following the
end of the Nadcap audit - Suppliers who fail to provide a valid quality
system accreditation certificate to PRI by this
date shall have the process audit automatically
failed without further notice.
31Self Audit
- Perform a thorough and complete self-audit using
the Nadcap checklist. - Record for each question, where in your system
you meet the requirement - Record for each question, where you have
objective evidence of compliance - If you can not list where in your system you have
documentation and what you will show the auditor
the answer is No! - Fix all Nos with complete root cause
corrective action prior to audit.
32Additional tools
- Use the tools on www.eauditnet.com
- Tutorials
- Audit Handbooks
- Checklists
- Contact your customers to verify your audit scope
- Read the preparation instructions for your
commodity. You must send certain documents
(quality manual, procedures, etc.) to your
auditor AT LEAST 30 days prior to your audit. - Familiarize yourself with www.pri-network.org and
the tools available - Keep your management informed
Do your Own Job Audits
33Job Audit
- Job Audits a key part of the Nadcap audit is
the job audit. - A job audit is a step by step review of all
processing on actual hardware evaluating how you
meet your customer requirements. - Each special process family has a numbers of job
audits that will be conducted with the special
process checklist.
34Job Audit (Contd)
- Schedule the Nadcap audit when you can perform as
- many of the job audits as possible.
- Work with PRI scheduling and your internal
scheduling - to ensure you will have jobs for the audit.
NOTE select only non- ITAR work if you are
going to have a restricted auditor. - You should have available a REAL part from a
Nadcap - aerospace Prime
- NOTE Each Task Group has specific requirements.
You MUST review the Audit Checklist for specific
details and speak to the Staff Engineer if you
will not have a part from a Nadcap aerospace
Prime at the time of your audit.
35Supplier Mentoring
- SSC has established a mentoring program for
suppliers - The program matches suppliers who need assistance
with experienced suppliers who can help them
succeed in the Nadcap process - Goal educate supplier base reduce cycle time
- Go to www.pri-network.org SSC page for more
information. - To request a mentor, send an email to
NadcapSSC_at_sae.org
36PRI Staff Engineer
- The PRI Task Group Staff Engineer has commodity
specific knowledge and expertise. - The Staff Engineers review and approve all
specified audits. - Staff Engineers have years of audit review
experience use their expertise before and after
your audit
37Staff Engineer Advice
- Do not rely on your customer to have found
everything in the specification. - It is your responsibility to ensure that you meet
all requirements. - The auditor will check for complete compliance
and ensure compliance flows throughout your
documents.
38More Staff Engineer Advice
- If there is a conflict between the checklist and
your customer requirement, pick the most
stringent. - Multiple customer requirements require a more
robust system. - The specification is the requirement. Procedures
must meet all requirements in the specification. - All process requirements must
- Be Documented
- Be Complied with
- Have objective evidence of compliance.
39Still More Staff Engineer Advice
- Ask questions early regarding interpretations.
- Typical problem areas
- NDT Exams (Level III)
- HT - Pyrometry
- CP Periodic testing
40Orientation AgendaSection IV
- Introduction to Nadcap
- Basic Tools and Advice
- How to Prepare for your Audit
- What to Expect During the Audit
- Important Post Audit Information
- Additional Information
41Scope Verification
- Audit In-briefing Sets the stage for the audit.
Supplier auditor will verify the scope of the
audit. - This requires access to the internet for auditor
to conduct a sign-off process in eAuditNet. - Any changes or corrections to the scope must be
made before the audit starts. - After the audit is conducted, no changes can be
made to the scope of your accreditation.
42Daily Briefings
- At the end of each audit day, the auditor will
conduct a daily briefing. - Meeting is designed to review any findings from
that day and to ensure all findings are
understood. - Make certain that you have proper supplier
personnel attend this meeting. - Raise any issues or problems that arose during
the audit.
43NCR Classifications
- Major Nonconformance
- The absence of, or systemic breakdown of, the
Process Control and/or Quality Management system.
Or - Any non-conformance where the effect impacts or
has the potential to impact the integrity of the
product. - Minor Nonconformance
- Any single system failure or lapse in conformance
with the - applicable standard or audit criteria.
- Refer to PRI Quality Manual available in the User
Documents - section of www.eauditnet.com.
-
44Outbriefing Meeting
- Schedule top management to attend.
- Make certain that you understand all NCRs as
written ask questions if you do not understand
make sure the finding will be clear to the
Staff Engineer and Task Group. - Review the process requirements and expectations
before the auditor leaves.
45Orientation AgendaSection V
- Introduction to Nadcap
- Basic Tools and Advice
- How to Prepare for your Audit
- What to Expect During the Audit
- Important Post Audit Information
- Additional Information
46After the Auditor Leaves
- We value your feedback Nadcap is a cooperative
program - When you submit your NCR responses you will be
prompted to complete an online questionnaire - If you require a response, or have a complaint,
please submit it in writing, separately from the
questionnaire - There is an appeals process for NCRs, Staff
Engineer decisions, and Task Group decisions - Contact the Staff Engineer for more information
47Corrective Action Response Submittals
- Reply to your Non-conformances in the Supplier
Discussion for each NCR. - Immediate Corrective Action Taken (Containment
Actions) - Root Cause of Nonconformance
- Impact of all Identified Causes and the Root
Cause - Action Taken to Prevent Recurrence
- Objective Evidence Attached must be included for
ALL findings for initial audits! You may submit
evidence by uploading attachments or via U-fax,
refer to the eAuditNet Supplier Guide for help. - IMPORTANT if a procedure is changed, clearly
specify what the change was. Change or create a
procedure, implement a new system or method,
perform training / awareness, propose audits, new
checklists, etc? SHOW IT.
48NCR Responses
- Responses are due 21 calendar days from the close
of the audit - Submit in eAuditNet
- Submit in accordance with Requirements for
Corrective Action Response Requirements
(eAuditNet Supplier Guide and www.pri-network.org)
- For completeness of the audit report, additional
information or clarifications may be requested by
the Staff Engineer. Responses must be submitted
through the Observation Forum on
www.eauditnet.com
49Response Due Dates
- Initial responses are due in 21 days, subsequent
responses are due in 7 days. Any responses sent
outside of these requirements will be considered
late. - No extensions can be granted.
- Suppliers are given 45 days of cumulative
lateness. If you must be late, you can use up to
45 days to respond. - This is not to be considered extra time, this is
late time that suppliers can use for issues that
prevent them from responding according to the
requirements (plant shutdowns, holidays, etc.) - The total number of days past due will be visible
in eAuditNet and reminders will be sent when the
audit is 15 and 30 days past due - At 45 days past due, the audit will be balloted
for failure.
50RCCA help
- Help available
- www.eauditnet.com
- A link to Response Requirements is attached to
the - NCRs
- Also www.pri-network.org
- -Nadcap page
- -Supplier Info Post Audit Assistance
- -Supplier Training additional tools
51(No Transcript)
52(No Transcript)
53Supplier Advisory/Early Review
- If a potential product impact or failure issue is
identified all User members will receive an early
review notice to look at the audit results. - If deemed necessary, a Supplier Advisory will be
issued. - An advisory is a formal way of communicating
concerns regarding documented possible product
impact, changes in key personnel, quality
systems, equipment, etc. to Nadcap Subscribing
Prime Members. - Four levels Preliminary, Potential Product
Impact, Safety Alert, Audit Failure, plus one
informational.
54Supplier Advisory/Early Review (Contd)
- Suppliers are encouraged to provide their own
comments as part of the advisory (within 5
working days). - Before closing the advisory, all other
accreditations will be reviewed to determine if
the identified issue is systemic and affects
other accreditations/ registrations. - If the issue is widespread, revocation of current
accreditation (if one exists) and other
commodity/quality certificates could occur. - Refer to NOP-006 for more information.
55NCR Review
- NCR responses may be sent back
- By the Staff Engineer
- Based on history and experience with Task Group
- History with similar findings/responses
- By the Task Group
- Each Request for additional information
- Delays your Accreditation
- Adds to cycle time
56If Your Response is Not Accepted
- You have 7 days to respond to the Staff Engineer
- If the Staff Engineer details specific requests
- Review and comply with the entire request. Your
response will not be accepted until all items are
addressed. - In the event of a generic rejection, i.e.,
Readdress Root Cause - Review the Requirements for Submittal of
Corrective Action Responses and comply - NOTE use e-mail/phone to work out an acceptable
response do not ask questions in eAuditNet -
each reply counts as an additional cycle
57Common Findings
- Job Audits
- Customer flowdown
- Lack of shop discipline inform your personnel!
- Lack of documentation/Objective evidence
- Data transfers
- Processes requiring approvals not approved (i.e.,
NDT Techniques or other frozen process) - Specification compliance (i.e., frozen process
doesnt meet specification, AMS 2750 compliance,
etc.) - Parts cleaning not in accordance with
requirements - Testing including periodic
58Orientation AgendaSection VI
- Introduction to Nadcap
- Basic Tools and Advice
- How to Prepare for your Audit
- What to Expect During the Audit
- Important Post Audit Information
- Additional Information
59eAuditNet Information
- Keep your email address current to ensure you
receive important emails related to your audit. - If there is a change in your contact information,
inform PRI. - Do not reply to automated emails received from
eAuditNet there are contacts listed in the
email. - For eAuditNet Support, refer to the Public
Documents section for User Guides or contact the
Help Desk at 1 724 772 1616 x8679 or via email
at eauditnetsupport_at_sae.org.
60Supplier Support Committee (SSC)
- SSC Position in Nadcap
- The SSC is an integral part of the Nadcap
process. - Established in NOP 001 just like the Nadcap
Task Groups. - SSC Chair is a voting member on NMC.
- Full support from PRI Staff.
61Supplier Support Committee Mission Statement
- Our goal is to represent the supplier community
and work with the Nadcap Management Council to
enhance the effectiveness and economical value of
the Nadcap system for the mutual benefit of
suppliers and primes.
62SSC Systemic Focus
- Operates independent of the Task Groups.
- SSC Focus is on overall issues common to
suppliers NOT technical or Task Group specific.
63SSC Organization
- SSC LT is comprised of
- SSC Chair
- 2 representatives from each Sector
- Secretary
- Standing Committees
- Communications Mentoring
- Metrics
- Survey
- Task Group Reps to SSC
64Supplier Support Committee Leadership Team (SSC
LT)
- David Michaud, Chairperson
- -Fountain Plating Co
- Derek Alty, Europe Sector Rep
- -Bodycote Heat Treatments Ltd
- Jim Cummings, Americas Sector Rep
- -Metal Finishing Co
- Bob Custer, Americas Sector Rep
- -AAA Plating Inspection Inc
- Joel Henry, Europe Sector Rep
- -Howmet S.A.
- Yoshiomi Sukesada, Asia Sector Rep
- -Asahi Kinzoku Kogyo Co. Ltd
- Stu Sherman, Secretary
- -Metallurgical Processing Inc
One Open Position Asia Sector Rep
65SSC Activities
- Supplier survey
- Communiqué Flyer - newsletter to Nadcap
participants - SSC Metrics
- Mentoring program
66Nadcap Meeting Information
- Available at www.pri-network.org
- Minutes Agendas
- Keep up with Task Group activities
- Participate in Task Group decisions
- Plan to attend Open Meeting Suppliers are
always welcome - Attend the Supplier Support Committee (SSC)
meeting
67Nadcap Meeting Information
68Obtain Agendas and Registration for Upcoming
meetings
69Important Meetings
- Supplier Support Committee Meeting
- Your participation is needed!
- Today 23 October 2007
- 415pm-615pm
- eAuditNet Training for Suppliers
- Today, following this session
- 1100am-1200pm
70Upcoming Nadcap Meetings
- 25-29 February 2008 Rome, Italy
- Meetings in 2008
- Nadcap meetings will now be three times per year.
- 21-25 July 2008 Pittsburgh, PA, US
- 6-10 October 2008 Yokohama, Japan
- Additional details can be found in the Nadcap
Meeting Attendees Guide
71Our Web Addresses
- www.pri-network.org
- www.eauditnet.com
72Questions?