Title: Supplier Introduction
1Supplier Introduction Tutorial 23 January
2007David MichaudSupplier SSC LT Chair
2Your Turn, Tell Us
- Your Name
- Company Name
- What commodity(ies) will be audited
3Orientation Agenda
- Introduction to Nadcap
- Basic Tools and Advice
- How to Prepare for your Audit
- During the Audit
- After the Audit
- Additional Information
4Welcome to Nadcap
- The leading, worldwide cooperative program of
major companies designed to manage a cost
effective consensus approach to special processes
and products and provide continual improvement
within the aerospace industry. - Nadcap is an industry managed program.
5(No Transcript)
6(No Transcript)
7(No Transcript)
8Industry Managed Process
Slide 8
Audit Checklist
Decision to establish Task Group
Auditor Qualification Selection
Accreditation Decisions
Audits Conducted Results
Corrective Actions As Required
Industry experts manage all key steps
9PRI/Nadcap Organizational Structure
- Executive leaders
- Legal entity
- Fiduciary responsibility
- Set policy
- Provide the Vision
- Senior Quality Leaders
- Develop strategic plan and vision
- Promote Nadcap among prime contractors
- Support launch of new task groups
- Promote continuous improvement
Nadcap Executive Strategic Planning Board (NESPB)
Task Groups Special Processes Nondestructive
Testing Materials Testing Heat Treating Coatings C
hemical Processing Welding NCM/Shot
Peening Systems Products Distributors Sealants,
Elastomer Seals AQS (AC7004) Fluid Distribution
Systems Composites
Supplier Support Committee
- Technical Experts
- Determine requirements
- Develop documents
- Accept corrective action
- Final decision on accreditation
10Nadcap continues to grow audits/active certs
Slide 10
11Nadcap a key element in Primessurveillance
plans
- Example GE Aviation
- 50 of all the audits in the GE system are
completed by Nadcap.
GE Audit Distribution
12Nadcap eAuditNet Process
Suppliers
PRI Audit Scheduled
Auditor Assigned
Request Audit
Task Group Approval
Audit Completed
PRI Technical Staff Review
Issue Cert
13Orientation AgendaSection II
- Introduction to Nadcap
- Basic Tools and Advice
- How to Prepare for your Audit
- During the Audit
- After the Audit
- Additional Information
14Primary Documents
- The two most important documents you need are
the - Audit checklist
- Auditor handbook (if available)
- You will be audited to the checklist AC7XXX as
developed by the Task Group. Secure both from
www.eauditnet.com in advance of the audit
15eAuditNet PRI Website
- www.eAuditNet.com
- Checklists
- Public Documents
- eAuditNet Supplier Guide Pre Post-Audit
Tutorials - Auditor Handbooks
- Miscellaneous documents (Auditor training,
Pyrometry, etc.) - User Documents
- www.pri-network.org
- Nadcap, Supplier Info
- PRI/Nadcap from a Supplier Perspective
- Root Cause Corrective Action Tools
- Check both sites often updates are made
frequently
16Slide 16
Nadcap
17Slide 17
Supplier Page
Staff Contacts
eAuditNet
18Slide 18
Checklists
User Documents
Public Documents
19User Documents
- PRI/Nadcap Internal Procedures (NIPs) - Documents
which detail specific procedures by which
PRI/Nadcap Staff operates. Eg. Balloting Audit
report processing Pre-Assessment Audits, etc. - Nadcap Operating Procedures (NOPs) - Documents
which detail the specific procedures by which
Nadcap operates. Such as Audit Failure, Supplier
Merit, Supplier Advisory, etc. - Nadcap Task Group Operating Procedures (NTGOPs)
Documents describing the scope and general
operating procedures for each specific Task
Group. For example, NDT, HT, etc.
20NIP 7-04 Accreditation Term
- Your term of accreditation begins in conjunction
with the audit date, not the issue date of the
cert - Accreditation terms are tied to the Nadcap
quarterly cycles. - Reference NIP 7-04 on www.eauditnet.com under
User Documents
21NIP 7-07 ITAR/EAR
- The US government has determined that certain
products, processes and technical information
must be controlled. - The documents which control this are
- ITAR International Traffic in Arms Regulation
- EAR Export Administration Regulations
22 ITAR/EAR Supplier Responsibilities
- Determine whether you have material which is
protected under ITAR/EAR. - Contact your customers to be certain.
- If you have material protected under ITAR/EAR,
you must request an unrestricted auditor (a US
citizen or green card holder) - Work with PRI Scheduling
- Details can be found in eAuditNet (Public
Documents) and on the Supplier page of the Nadcap
website
23Supplier Merit (NOP-008)
- Accreditation term for initial audits is 12
months. - Suppliers with superior performance will be
eligible for longer terms 18 months or 24
months - Merit is based on performance in two consecutive
audits. - Eligibility is contingent on no Product Impact
findings and no adverse Supplier Advisories - Each Task Group has specific criteria. Refer to
the NTGOP Appendices, available on
www.eAuditNet.com under User Documents
24Failure Policy (NOP-011)
- Suppliers can fail an audit for
- Excessive number of findings
- Severity of findings
- Too many corrective action response review cycles
to close - Nonresponsiveness
- The above criteria are not automatic failure
points the Task Group votes and makes the final
decision - Only 4 of all audits conducted in 2006 resulted
in failure the majority were due to
Nonresponsiveness - Specific criteria determined by Task Group
refer to - NOP-011,User Documents, www.eauditnet.com
25Orientation AgendaSection III
- Introduction to Nadcap
- Basic Tools and Advice
- How to Prepare for your Audit
- During the Audit
- After the Audit
- Additional Information
26Initial Steps
- Register in eAuditNet.com
- Contact PRI Scheduling
- Complete a preliminary questionnaire and return
to Scheduling - Obtain length of audit and cost
- Obtain access to Nadcap checklists
- Schedule Audit
- Pre-Audit Preparation participate in NCSI!
27Pre-Assessment Audit
- If you desire, you can get a pre-assessment audit
using a Nadcap auditor BEFORE your actual Nadcap
audit. - Contact PRI Scheduling. All the data from the
audit will be left with you. No need to close
out any findings. - The only findings which will be sent to Primes
are findings which may potentially impact
hardware.
28A Nadcap Audit is . . .
- The most thorough and comprehensive audit you
probably have ever had. - Conducted by experts in the field with technical
special process knowledge and background.
The more you prepare the greater success you
will have.
29Quality System Approval
- Before you can receive a Nadcap special process
accreditation, your quality system must be
approved - Nadcap recognized quality systems approvals
- AS9003 and AS/EN/JISQ 9100 quality system
approvals performed by approved registrars -
listed in the IAQG Oasis database.
(www.iaqg.org/oasis). Product groups require
AS9100. -
- ISO/IEC 17025 for testing laboratories (AC7101),
must cover the Nadcap scope of accreditation and
be from an approved NACLA/ILAC accreditation
body. -
- If you have neither of these, you will need a
Nadcap AQS audit to AC7004 or AC7006 (labs) to
support the special process accreditation.
30Quality System Approval (Contd)
- To ensure Suppliers have an approved quality
system, a new process was developed that affects
all audits conducted AFTER 14 January 2007. - 150 days prior to your special process audit,
Suppliers will be sent an email to send in a
valid QS certificate. - 120 days prior to the audit Suppliers receive a
second reminder to send in a valid QS certificate - 90 days prior to the audit, if a QS certificate
is not received, an AC7004 or AC7006 audit will
be scheduled. For Seals, Sealants and Fluids,
the special process audit will be cancelled. - If AC7004/AC7006 audit is cancelled, Supplier
will incur a 400.00 penalty.
31Self Audit
- Perform a thorough and complete self-audit using
the Nadcap checklist. - Record for each question, where in your system
you meet the requirement - Record for each question, where you have
objective evidence of compliance - If you can not list where in your system you have
documentation and what you will show the auditor
the answer is No! - Fix all Nos with complete root cause
corrective action prior to audit.
32Additional tools
- Use the tools on www.eauditnet.com
- Tutorials
- Auditor Handbooks
- Checklists
- Contact your customers to verify your audit scope
- Read the preparation instructions for your
commodity. You must send certain documents
(quality manual, procedures, etc.) to your
auditor AT LEAST 30 days prior to your audit. - Familiarize yourself with www.pri-network.org and
the tools available - Keep your management informed
Do your Own Job Audits
33Job Audit
- Job Audits a key part of the Nadcap audit is
the job audit. - A job audit is a step by step review of all
processing on actual hardware evaluating how you
meet all customer requirements. - Each special process family have a numbers of job
audits to be conducted with the special process
checklist.
34Job Audit (Contd)
- Schedule the Nadcap audit when you can
- perform as many of the job audits as
- possible.
- Work with PRI scheduling and your internal
scheduling to ensure you will have jobs for the
audit. - You should have available a REAL part from a
Nadcap - aerospace Prime
- NOTE Each Task Group has specific requirements
you MUST review the Audit Checklist for specific
details and speak to the Staff Engineer if you
can not provide a part from a Nadcap aerospace
Prime.
35Supplier Mentoring
- SSC has established a mentoring program for
suppliers - The program matches suppliers who need assistance
with experienced suppliers who can help them
succeed in the Nadcap process - Goal educate supplier base reduce cycle time
- Go to www.pri-network.org SSC page for more
information and to request a mentor
36PRI Staff Engineer
- The PRI Task Group Staff Engineer has commodity
specific knowledge and expertise. - The Staff Engineers review and approve all
specified audits. - Staff Engineers have years of audit review
experience use their expertise before and after
your audit
37Staff Engineer Advice
- Do not rely on your customer to have found
everything in the specification. - It is your responsibility to ensure that you meet
all requirements. - The auditor will check for complete compliance
and ensure compliance flows throughout your
documents.
38More Staff Engineer Advice
- If there is a conflict between the checklist and
your customer requirement, pick the most
stringent - Multiple customer requirements require a more
robust system. - The specification is the requirement. Procedures
must meet all requirements in the specification. - All process requirements must
- Be Documented
- Be Complied with
- Have objective evidence of compliance.
39Still More Staff Engineer Advice
- Ask questions early regarding interpretations.
- Typical problem areas
- NDT Exams (Level III)
- HT - Pyrometry
- CP Periodic testing
40Orientation AgendaSection IV
- Introduction to Nadcap
- Basic Tools and Advice
- How to Prepare for your Audit
- During the Audit
- After the Audit
- Additional Information
41Scope Verification
- Audit In-briefing Sets the stage for the audit.
Supplier auditor will verify the scope of the
audit. - This requires access to the internet for auditor
to conduct a sign-off process in eAuditNet. - Any changes or corrections in scope must be made
before the audit starts. - After the audit is conducted, no changes can be
made to the scope of accreditation.
42Daily Briefings
- At the end of each audit day, the auditor will
conduct a daily briefing. - Ensure that all findings are understood
- Ensure that proper supplier personnel are in
attendance - Raise any issues or problems that arose during
the audit
43NCR Classifications
- Major Nonconformance Any nonconformance that
could - affect Safety usability of a product, or
Integrity of the quality system - increase product cost
- affect the ability to meet the customers
requirements. - Examples incorrect process parameters, missing
inspections or processing steps, failure to
record required data, missed or out of tolerance
calibration result from failure to implement a
corrective action from the previous audit. - Minor Nonconformance Any non-systemic, isolated
nonconformance that does not, do any of the
above. - Examples paperwork oversights, minor changes to
procedures for clarification. - Observation Auditors informational comments
based on an assessment of a Special process or
quality system. - At October Nadcap meeting, the NMC voted to
slightly revise these definitions. PRI will be
revising procedures, and suppliers will be
notified when the changes are implemented. - Definitions found in PRI/Nadcap Quality Manual
page 27 or 31.
44Additional Help
- If there is a dispute or disagreement on a
finding during the audit contact the Staff
Engineer right away. - There is an appeals process, but it is better to
get these issues resolved right away before the
audit is completed.
45Exit Meeting
- Schedule top management to attend
- Make certain that you understand all NCRs as
written ask questions if you do not understand
make sure it will be clear to Staff Engineer - Review the process requirements and expectations
before the auditor leaves
46Orientation AgendaSection V
- Introduction to Nadcap
- Basic Tools and Advice
- How to Prepare for your Audit
- During the Audit
- After the Audit
- Additional Information
47After the Auditor Leaves
- You must provide feedback on the audit and
auditor - We value your feedback Nadcap is a cooperative
program - When you submit your NCR responses you will be
required to complete an online questionnaire - Complaints must be submitted in writing and will
be addressed independently of the audit review
process - There is an appeals process for NCRs, Staff
Engineer decisions, and Task Group decisions - Contact the Staff Engineer for more information
48Corrective Action Response Submittals
- Reply to your Non-conformances in the Supplier
Discussion for each NCR. - Immediate Corrective Action Taken (Containment
Actions) - Root Cause of Nonconformance
- Impact of all Identified Causes and the Root
Cause - Action Taken to Prevent Recurrence
- Objective Evidence Attached must be included for
ALL findings for initial audits! - IMPORTANT if a procedure is changed, clearly
specify what the change was. Change or create a
procedure, implement a new system or method,
perform training / awareness, propose audits, new
checklists, etc? SHOW IT.
Suggestion if it is not required (ex. Minor
finding on a reaccreditation audit), it is
strongly recommended that you send objective
evidence if it will assist the Staff Engineer
with understanding your response. This could
prevent an additional review cycle.
49NCR Responses
- Responses are due 21 calendar days from the close
of the audit - Submit in eAuditNet
- Submit in accordance with Requirements for
Corrective Action Response Requirements
(eAuditNet Supplier Guide and www.pri-network.org)
- For completeness of the audit report, additional
information or clarifications may be requested by
the Staff Engineer. Responses must be submitted
through the Observation Forum on
www.eauditnet.com
50Response Due Dates - NEW!
- Initial responses are due in 21 days, subsequent
responses are due in 7 days. Any responses sent
outside of these requirements will be considered
late. - No extensions can be granted.
- Suppliers are now given 45 days of cumulative
lateness. If you must be late, you can use up to
45 days to respond. - This is not to be considered extra time, this is
late time that suppliers can use for issues that
prevent them from responding according to the
requirements (plant shutdowns, holidays, etc.) - The total number of days past due will be visible
in eAuditNet and reminders will be sent to both
suppliers and prime contractors when the audit is
15 and 30 days past due - At 45 days past due, the audit will be balloted
for failure.
51RCCA help
- Help available
- www.eauditnet.com
- A link to Response Requirements is attached to
the - NCRs
- Also www.pri-network.org
- -Nadcap page
- -Supplier Info Post Audit Assistance
- -Supplier Training additional tools
52Slide 52
53Slide 53
54Supplier Advisory/Early Review
- If a potential product impact or failure issue is
identified all User members will receive an early
review notice to look at the audit results. - If deemed necessary, a Supplier Advisory will be
issued. - An advisory is a formal way of communicating
concerns regarding documented possible product
impact, changes in key personnel, quality
systems, equipment, etc. to Nadcap Subscribing
Prime Members. - Four levels Preliminary, Potential Product
Impact, Safety Alert, Audit Failure, plus one
informational.
55Supplier Advisory/Early Review (Contd)
- Suppliers are encouraged to provide their own
comments as part of the advisory (within 5
working days). - Before closing the advisory, all other
accreditations will be reviewed to determine if
the identified issue is systemic and affects
other accreditations/ registrations. - If the issue is widespread, revocation of current
accreditation (if one exists) and other
commodity/quality certificates could occur. - Refer to NOP-006 for more information.
56NCR Review
- NCR responses may be sent back
- By the Staff Engineer
- Based on history and experience with Task Group
- History with similar findings/responses
- By the Task Group
- Each Request for additional information
- Delays your Accreditation
- Adds to cycle time
57If Your Response is Not Accepted
- You have 7 days to respond to the Staff Engineer
- If the Staff Engineer details specific requests
- Review and comply with the entire request. Your
response will not be accepted until all items
detailed are addressed. - In the event of a generic rejection, i.e.,
Readdress Root Cause - Review the Requirements for Submittal of
Corrective Action Responses and comply with
specific requirements for format and analysis - NOTE use e-mail/phone to work out an acceptable
response do not use eAuditnet reply - each
reply counts as an additional cycle
58Common Findings
- Job Audits
- Customer flowdown
- Lack of shop discipline inform your personnel!
- Lack of documentation/Objective evidence
- Data transfers
- Processes requiring approvals not approved (i.e.,
NDT Techniques or other frozen process) - Specification compliance (i.e., frozen process
doesnt meet specification or AMS 2750
compliance) - Parts cleaning not in accordance with
requirements - Testing including periodic
59Orientation AgendaSection VI
- Introduction to Nadcap
- Basic Tools and Advice
- How to Prepare for your Audit
- During the Audit
- After the Audit
- Additional Information
60eAuditNet Information
- Keep your email address current to ensure you
receive important emails related to your audit. - If there is a change in your contact information,
inform the PRI Scheduling Department. - Do not reply to automated emails received from
eAuditNet there are contacts listed in the
email. - For eAuditNet Support, refer to the Public
Documents section for User Guides or contact the
Help Desk at 1 724 772 1616 x8679 or via email
at eauditnetsupport_at_sae.org
61Supplier Support Committee (SSC)
- SSC Position in Nadcap
- The SSC is an integral part of the Nadcap process
- Established in NOP 001 just like the Nadcap
Task Groups - SSC Chair is a voting member on NMC
- Full support from PRI Staff
62Supplier Support Committee Mission Statement
- Our goal is to represent the supplier community
and work with the Nadcap Management Council to
enhance the effectiveness and economical value of
the Nadcap system for the mutual benefit of
suppliers and primes.
63SSC Systemic Focus
- Operates independent of the Task Groups focus
on overall issues common to suppliers not
technical or Task Group specific
64SSC Organization
- SSC LT Comprised of
- SSC Chair
- 2 representatives from each Sector
- Secretary
- Standing Committees
- Communications Mentoring
- Metrics
- Survey
- Task Group Reps to SSC
65Supplier Support Committee Leadership Team (SSC
LT)
- David Michaud, Chairperson
- -Fountain Plating Co
- Derek Alty, Europe Sector Rep
- -Bodycote Heat Treatments Ltd
- Jim Cummings, Americas Sector Rep
- -Metal Finishing Co
- Bob Custer, Americas Sector Rep
- -AAA Plating Inspection Inc
- Yoshiomi Sukesada, Asia Sector Rep
- -Asahi Kinzoku Kogyo Co. Ltd
- Stu Sherman, Secretary
- -Metallurgical Processing Inc
- Louis Tseng, Asia Sector Rep
- -Aerospace Industrial Development
- Corporation (AIDC)
Currently one open position Europe Sector Rep
66SSC Activities
- Supplier survey next one is April 2007
- Communiqué Flyer - newsletter to Nadcap
participants - SSC Metrics
- Mentoring program
- The SSC needs volunteers to serve on teams and
participate in all activities to ensure the
supplier voice is heard.
67 SSC Conclusion
- The SSC is one of the best ways that suppliers
can influence the Nadcap process - Get involved!
- See any SSC Leadership Team member if you want to
help.
68Nadcap Meeting Information
- Available at www.pri-network.org
- Minutes Agendas
- Keep up with Task Group activities
- Participate in Task Group decisions
- Plan to attend Open Meeting Suppliers are
always welcome - Attend the Supplier Support Committee (SSC)
meeting - Get involved Join the SSC!
69Slide 69
Nadcap Meeting Information
70Slide 70
Obtain Agendas and Registration for Upcoming
meetings
71Important Meetings
- Supplier Support Committee Meeting
- Your participation is needed!
- Today January 23, 2007
- 500pm-630pm
- eAuditNet Training for Suppliers
- Today, following this session in this room
- 1000am-1100am
72Upcoming Nadcap Meetings
- April 23-27, 2007
- Newport Bay Club
- Disneyland Resort Paris
- Marne-la-Vallee, 77777
- France
- Phone 33 1 60 45 55 00
- Rate 139 Euro Single
- Reservation deadline March 30, 2007
- July 16-20, 2007 Istanbul, Turkey
- Additional details in Attendees Guide
73Our Web Addresses
- www.pri-network.org
- www.eauditnet.com
74Questions?