Title: Supplier Introduction


1
Supplier Introduction Tutorial 23 January
2007David MichaudSupplier SSC LT Chair
2
Your Turn, Tell Us
  • Your Name
  • Company Name
  • What commodity(ies) will be audited

3
Orientation Agenda
  • Introduction to Nadcap
  • Basic Tools and Advice
  • How to Prepare for your Audit
  • During the Audit
  • After the Audit
  • Additional Information

4
Welcome to Nadcap
  • The leading, worldwide cooperative program of
    major companies designed to manage a cost
    effective consensus approach to special processes
    and products and provide continual improvement
    within the aerospace industry.
  • Nadcap is an industry managed program.

5
(No Transcript)
6
(No Transcript)
7
(No Transcript)
8
Industry Managed Process
Slide 8
Audit Checklist
Decision to establish Task Group
Auditor Qualification Selection
Accreditation Decisions
Audits Conducted Results
Corrective Actions As Required
Industry experts manage all key steps
9
PRI/Nadcap Organizational Structure
  • Executive leaders
  • Legal entity
  • Fiduciary responsibility
  • Set policy
  • Provide the Vision
  • Senior Quality Leaders
  • Develop strategic plan and vision
  • Promote Nadcap among prime contractors
  • Support launch of new task groups
  • Promote continuous improvement

Nadcap Executive Strategic Planning Board (NESPB)
Task Groups Special Processes Nondestructive
Testing Materials Testing Heat Treating Coatings C
hemical Processing Welding NCM/Shot
Peening Systems Products Distributors Sealants,
Elastomer Seals AQS (AC7004) Fluid Distribution
Systems Composites
Supplier Support Committee
  • Technical Experts
  • Determine requirements
  • Develop documents
  • Accept corrective action
  • Final decision on accreditation

10
Nadcap continues to grow audits/active certs
Slide 10
11
Nadcap a key element in Primessurveillance
plans
  • Example GE Aviation
  • 50 of all the audits in the GE system are
    completed by Nadcap.

GE Audit Distribution
12
Nadcap eAuditNet Process
Suppliers
PRI Audit Scheduled
Auditor Assigned
Request Audit
Task Group Approval
Audit Completed
PRI Technical Staff Review
Issue Cert
13
Orientation AgendaSection II
  • Introduction to Nadcap
  • Basic Tools and Advice
  • How to Prepare for your Audit
  • During the Audit
  • After the Audit
  • Additional Information

14
Primary Documents
  • The two most important documents you need are
    the
  • Audit checklist
  • Auditor handbook (if available)
  • You will be audited to the checklist AC7XXX as
    developed by the Task Group. Secure both from
    www.eauditnet.com in advance of the audit

15
eAuditNet PRI Website
  • www.eAuditNet.com
  • Checklists
  • Public Documents
  • eAuditNet Supplier Guide Pre Post-Audit
    Tutorials
  • Auditor Handbooks
  • Miscellaneous documents (Auditor training,
    Pyrometry, etc.)
  • User Documents
  • www.pri-network.org
  • Nadcap, Supplier Info
  • PRI/Nadcap from a Supplier Perspective
  • Root Cause Corrective Action Tools
  • Check both sites often updates are made
    frequently

16
Slide 16
Nadcap
17
Slide 17
Supplier Page
Staff Contacts
eAuditNet
18
Slide 18
Checklists
User Documents
Public Documents
19
User Documents
  • PRI/Nadcap Internal Procedures (NIPs) - Documents
    which detail specific procedures by which
    PRI/Nadcap Staff operates. Eg. Balloting Audit
    report processing Pre-Assessment Audits, etc.
  • Nadcap Operating Procedures (NOPs) - Documents
    which detail the specific procedures by which
    Nadcap operates. Such as Audit Failure, Supplier
    Merit, Supplier Advisory, etc.
  • Nadcap Task Group Operating Procedures (NTGOPs)
    Documents describing the scope and general
    operating procedures for each specific Task
    Group. For example, NDT, HT, etc.

20
NIP 7-04 Accreditation Term
  • Your term of accreditation begins in conjunction
    with the audit date, not the issue date of the
    cert
  • Accreditation terms are tied to the Nadcap
    quarterly cycles.
  • Reference NIP 7-04 on www.eauditnet.com under
    User Documents

21
NIP 7-07 ITAR/EAR
  • The US government has determined that certain
    products, processes and technical information
    must be controlled.
  • The documents which control this are
  • ITAR International Traffic in Arms Regulation
  • EAR Export Administration Regulations

22
ITAR/EAR Supplier Responsibilities
  • Determine whether you have material which is
    protected under ITAR/EAR.
  • Contact your customers to be certain.
  • If you have material protected under ITAR/EAR,
    you must request an unrestricted auditor (a US
    citizen or green card holder)
  • Work with PRI Scheduling
  • Details can be found in eAuditNet (Public
    Documents) and on the Supplier page of the Nadcap
    website

23
Supplier Merit (NOP-008)
  • Accreditation term for initial audits is 12
    months.
  • Suppliers with superior performance will be
    eligible for longer terms 18 months or 24
    months
  • Merit is based on performance in two consecutive
    audits.
  • Eligibility is contingent on no Product Impact
    findings and no adverse Supplier Advisories
  • Each Task Group has specific criteria. Refer to
    the NTGOP Appendices, available on
    www.eAuditNet.com under User Documents

24
Failure Policy (NOP-011)
  • Suppliers can fail an audit for
  • Excessive number of findings
  • Severity of findings
  • Too many corrective action response review cycles
    to close
  • Nonresponsiveness
  • The above criteria are not automatic failure
    points the Task Group votes and makes the final
    decision
  • Only 4 of all audits conducted in 2006 resulted
    in failure the majority were due to
    Nonresponsiveness
  • Specific criteria determined by Task Group
    refer to
  • NOP-011,User Documents, www.eauditnet.com

25
Orientation AgendaSection III
  • Introduction to Nadcap
  • Basic Tools and Advice
  • How to Prepare for your Audit
  • During the Audit
  • After the Audit
  • Additional Information

26
Initial Steps
  • Register in eAuditNet.com
  • Contact PRI Scheduling
  • Complete a preliminary questionnaire and return
    to Scheduling
  • Obtain length of audit and cost
  • Obtain access to Nadcap checklists
  • Schedule Audit
  • Pre-Audit Preparation participate in NCSI!

27
Pre-Assessment Audit
  • If you desire, you can get a pre-assessment audit
    using a Nadcap auditor BEFORE your actual Nadcap
    audit.
  • Contact PRI Scheduling. All the data from the
    audit will be left with you. No need to close
    out any findings.
  • The only findings which will be sent to Primes
    are findings which may potentially impact
    hardware.

28
A Nadcap Audit is . . .
  • The most thorough and comprehensive audit you
    probably have ever had.
  • Conducted by experts in the field with technical
    special process knowledge and background.

The more you prepare the greater success you
will have.
29
Quality System Approval
  • Before you can receive a Nadcap special process
    accreditation, your quality system must be
    approved
  • Nadcap recognized quality systems approvals
  • AS9003 and AS/EN/JISQ 9100 quality system
    approvals performed by approved registrars -
    listed in the IAQG Oasis database.
    (www.iaqg.org/oasis). Product groups require
    AS9100.
  • ISO/IEC 17025 for testing laboratories (AC7101),
    must cover the Nadcap scope of accreditation and
    be from an approved NACLA/ILAC accreditation
    body.
  • If you have neither of these, you will need a
    Nadcap AQS audit to AC7004 or AC7006 (labs) to
    support the special process accreditation.

30
Quality System Approval (Contd)
  • To ensure Suppliers have an approved quality
    system, a new process was developed that affects
    all audits conducted AFTER 14 January 2007.
  • 150 days prior to your special process audit,
    Suppliers will be sent an email to send in a
    valid QS certificate.
  • 120 days prior to the audit Suppliers receive a
    second reminder to send in a valid QS certificate
  • 90 days prior to the audit, if a QS certificate
    is not received, an AC7004 or AC7006 audit will
    be scheduled. For Seals, Sealants and Fluids,
    the special process audit will be cancelled.
  • If AC7004/AC7006 audit is cancelled, Supplier
    will incur a 400.00 penalty.

31
Self Audit
  • Perform a thorough and complete self-audit using
    the Nadcap checklist.
  • Record for each question, where in your system
    you meet the requirement
  • Record for each question, where you have
    objective evidence of compliance
  • If you can not list where in your system you have
    documentation and what you will show the auditor
    the answer is No!
  • Fix all Nos with complete root cause
    corrective action prior to audit.

32
Additional tools
  • Use the tools on www.eauditnet.com
  • Tutorials
  • Auditor Handbooks
  • Checklists
  • Contact your customers to verify your audit scope
  • Read the preparation instructions for your
    commodity. You must send certain documents
    (quality manual, procedures, etc.) to your
    auditor AT LEAST 30 days prior to your audit.
  • Familiarize yourself with www.pri-network.org and
    the tools available
  • Keep your management informed

Do your Own Job Audits
33
Job Audit
  • Job Audits a key part of the Nadcap audit is
    the job audit.
  • A job audit is a step by step review of all
    processing on actual hardware evaluating how you
    meet all customer requirements.
  • Each special process family have a numbers of job
    audits to be conducted with the special process
    checklist.


34
Job Audit (Contd)
  • Schedule the Nadcap audit when you can
  • perform as many of the job audits as
  • possible.
  • Work with PRI scheduling and your internal
    scheduling to ensure you will have jobs for the
    audit.
  • You should have available a REAL part from a
    Nadcap
  • aerospace Prime
  • NOTE Each Task Group has specific requirements
    you MUST review the Audit Checklist for specific
    details and speak to the Staff Engineer if you
    can not provide a part from a Nadcap aerospace
    Prime.

35
Supplier Mentoring
  • SSC has established a mentoring program for
    suppliers
  • The program matches suppliers who need assistance
    with experienced suppliers who can help them
    succeed in the Nadcap process
  • Goal educate supplier base reduce cycle time
  • Go to www.pri-network.org SSC page for more
    information and to request a mentor

36
PRI Staff Engineer
  • The PRI Task Group Staff Engineer has commodity
    specific knowledge and expertise.
  • The Staff Engineers review and approve all
    specified audits.
  • Staff Engineers have years of audit review
    experience use their expertise before and after
    your audit

37
Staff Engineer Advice
  • Do not rely on your customer to have found
    everything in the specification.
  • It is your responsibility to ensure that you meet
    all requirements.
  • The auditor will check for complete compliance
    and ensure compliance flows throughout your
    documents.

38
More Staff Engineer Advice
  • If there is a conflict between the checklist and
    your customer requirement, pick the most
    stringent
  • Multiple customer requirements require a more
    robust system.
  • The specification is the requirement. Procedures
    must meet all requirements in the specification.
  • All process requirements must
  • Be Documented
  • Be Complied with
  • Have objective evidence of compliance.

39
Still More Staff Engineer Advice
  • Ask questions early regarding interpretations.
  • Typical problem areas
  • NDT Exams (Level III)
  • HT - Pyrometry
  • CP Periodic testing

40
Orientation AgendaSection IV
  • Introduction to Nadcap
  • Basic Tools and Advice
  • How to Prepare for your Audit
  • During the Audit
  • After the Audit
  • Additional Information

41
Scope Verification
  • Audit In-briefing Sets the stage for the audit.
    Supplier auditor will verify the scope of the
    audit.
  • This requires access to the internet for auditor
    to conduct a sign-off process in eAuditNet.
  • Any changes or corrections in scope must be made
    before the audit starts.
  • After the audit is conducted, no changes can be
    made to the scope of accreditation.

42
Daily Briefings
  • At the end of each audit day, the auditor will
    conduct a daily briefing.
  • Ensure that all findings are understood
  • Ensure that proper supplier personnel are in
    attendance
  • Raise any issues or problems that arose during
    the audit

43
NCR Classifications
  • Major Nonconformance Any nonconformance that
    could
  • affect Safety usability of a product, or
    Integrity of the quality system
  • increase product cost
  • affect the ability to meet the customers
    requirements.
  • Examples incorrect process parameters, missing
    inspections or processing steps, failure to
    record required data, missed or out of tolerance
    calibration result from failure to implement a
    corrective action from the previous audit.
  • Minor Nonconformance Any non-systemic, isolated
    nonconformance that does not, do any of the
    above.
  • Examples paperwork oversights, minor changes to
    procedures for clarification.
  • Observation Auditors informational comments
    based on an assessment of a Special process or
    quality system.
  • At October Nadcap meeting, the NMC voted to
    slightly revise these definitions. PRI will be
    revising procedures, and suppliers will be
    notified when the changes are implemented.
  • Definitions found in PRI/Nadcap Quality Manual
    page 27 or 31.

44
Additional Help
  • If there is a dispute or disagreement on a
    finding during the audit contact the Staff
    Engineer right away.
  • There is an appeals process, but it is better to
    get these issues resolved right away before the
    audit is completed.

45
Exit Meeting
  • Schedule top management to attend
  • Make certain that you understand all NCRs as
    written ask questions if you do not understand
    make sure it will be clear to Staff Engineer
  • Review the process requirements and expectations
    before the auditor leaves

46
Orientation AgendaSection V
  • Introduction to Nadcap
  • Basic Tools and Advice
  • How to Prepare for your Audit
  • During the Audit
  • After the Audit
  • Additional Information

47
After the Auditor Leaves
  • You must provide feedback on the audit and
    auditor
  • We value your feedback Nadcap is a cooperative
    program
  • When you submit your NCR responses you will be
    required to complete an online questionnaire
  • Complaints must be submitted in writing and will
    be addressed independently of the audit review
    process
  • There is an appeals process for NCRs, Staff
    Engineer decisions, and Task Group decisions
  • Contact the Staff Engineer for more information

48
Corrective Action Response Submittals
  • Reply to your Non-conformances in the Supplier
    Discussion for each NCR.
  • Immediate Corrective Action Taken (Containment
    Actions)
  • Root Cause of Nonconformance
  • Impact of all Identified Causes and the Root
    Cause
  • Action Taken to Prevent Recurrence
  • Objective Evidence Attached must be included for
    ALL findings for initial audits!
  • IMPORTANT if a procedure is changed, clearly
    specify what the change was. Change or create a
    procedure, implement a new system or method,
    perform training / awareness, propose audits, new
    checklists, etc? SHOW IT.

Suggestion if it is not required (ex. Minor
finding on a reaccreditation audit), it is
strongly recommended that you send objective
evidence if it will assist the Staff Engineer
with understanding your response. This could
prevent an additional review cycle.
49
NCR Responses
  • Responses are due 21 calendar days from the close
    of the audit
  • Submit in eAuditNet
  • Submit in accordance with Requirements for
    Corrective Action Response Requirements
    (eAuditNet Supplier Guide and www.pri-network.org)
  • For completeness of the audit report, additional
    information or clarifications may be requested by
    the Staff Engineer. Responses must be submitted
    through the Observation Forum on
    www.eauditnet.com

50
Response Due Dates - NEW!
  • Initial responses are due in 21 days, subsequent
    responses are due in 7 days. Any responses sent
    outside of these requirements will be considered
    late.
  • No extensions can be granted.
  • Suppliers are now given 45 days of cumulative
    lateness. If you must be late, you can use up to
    45 days to respond.
  • This is not to be considered extra time, this is
    late time that suppliers can use for issues that
    prevent them from responding according to the
    requirements (plant shutdowns, holidays, etc.)
  • The total number of days past due will be visible
    in eAuditNet and reminders will be sent to both
    suppliers and prime contractors when the audit is
    15 and 30 days past due
  • At 45 days past due, the audit will be balloted
    for failure.

51
RCCA help
  • Help available
  • www.eauditnet.com
  • A link to Response Requirements is attached to
    the
  • NCRs
  • Also www.pri-network.org
  • -Nadcap page
  • -Supplier Info Post Audit Assistance
  • -Supplier Training additional tools

52
Slide 52
53
Slide 53
54
Supplier Advisory/Early Review
  • If a potential product impact or failure issue is
    identified all User members will receive an early
    review notice to look at the audit results.
  • If deemed necessary, a Supplier Advisory will be
    issued.
  • An advisory is a formal way of communicating
    concerns regarding documented possible product
    impact, changes in key personnel, quality
    systems, equipment, etc. to Nadcap Subscribing
    Prime Members.
  • Four levels Preliminary, Potential Product
    Impact, Safety Alert, Audit Failure, plus one
    informational.

55
Supplier Advisory/Early Review (Contd)
  • Suppliers are encouraged to provide their own
    comments as part of the advisory (within 5
    working days).
  • Before closing the advisory, all other
    accreditations will be reviewed to determine if
    the identified issue is systemic and affects
    other accreditations/ registrations.
  • If the issue is widespread, revocation of current
    accreditation (if one exists) and other
    commodity/quality certificates could occur.
  • Refer to NOP-006 for more information.

56
NCR Review
  • NCR responses may be sent back
  • By the Staff Engineer
  • Based on history and experience with Task Group
  • History with similar findings/responses
  • By the Task Group
  • Each Request for additional information
  • Delays your Accreditation
  • Adds to cycle time

57
If Your Response is Not Accepted
  • You have 7 days to respond to the Staff Engineer
  • If the Staff Engineer details specific requests
  • Review and comply with the entire request. Your
    response will not be accepted until all items
    detailed are addressed.
  • In the event of a generic rejection, i.e.,
    Readdress Root Cause
  • Review the Requirements for Submittal of
    Corrective Action Responses and comply with
    specific requirements for format and analysis
  • NOTE use e-mail/phone to work out an acceptable
    response do not use eAuditnet reply - each
    reply counts as an additional cycle

58
Common Findings
  • Job Audits
  • Customer flowdown
  • Lack of shop discipline inform your personnel!
  • Lack of documentation/Objective evidence
  • Data transfers
  • Processes requiring approvals not approved (i.e.,
    NDT Techniques or other frozen process)
  • Specification compliance (i.e., frozen process
    doesnt meet specification or AMS 2750
    compliance)
  • Parts cleaning not in accordance with
    requirements
  • Testing including periodic

59
Orientation AgendaSection VI
  • Introduction to Nadcap
  • Basic Tools and Advice
  • How to Prepare for your Audit
  • During the Audit
  • After the Audit
  • Additional Information

60
eAuditNet Information
  • Keep your email address current to ensure you
    receive important emails related to your audit.
  • If there is a change in your contact information,
    inform the PRI Scheduling Department.
  • Do not reply to automated emails received from
    eAuditNet there are contacts listed in the
    email.
  • For eAuditNet Support, refer to the Public
    Documents section for User Guides or contact the
    Help Desk at 1 724 772 1616 x8679 or via email
    at eauditnetsupport_at_sae.org

61
Supplier Support Committee (SSC)
  • SSC Position in Nadcap
  • The SSC is an integral part of the Nadcap process
  • Established in NOP 001 just like the Nadcap
    Task Groups
  • SSC Chair is a voting member on NMC
  • Full support from PRI Staff

62
Supplier Support Committee Mission Statement
  • Our goal is to represent the supplier community
    and work with the Nadcap Management Council to
    enhance the effectiveness and economical value of
    the Nadcap system for the mutual benefit of
    suppliers and primes.

63
SSC Systemic Focus
  • Operates independent of the Task Groups focus
    on overall issues common to suppliers not
    technical or Task Group specific

64
SSC Organization
  • SSC LT Comprised of
  • SSC Chair
  • 2 representatives from each Sector
  • Secretary
  • Standing Committees
  • Communications Mentoring
  • Metrics
  • Survey
  • Task Group Reps to SSC

65
Supplier Support Committee Leadership Team (SSC
LT)
  • David Michaud, Chairperson
  • -Fountain Plating Co
  • Derek Alty, Europe Sector Rep
  • -Bodycote Heat Treatments Ltd
  • Jim Cummings, Americas Sector Rep
  • -Metal Finishing Co
  • Bob Custer, Americas Sector Rep
  • -AAA Plating Inspection Inc
  • Yoshiomi Sukesada, Asia Sector Rep
  • -Asahi Kinzoku Kogyo Co. Ltd
  • Stu Sherman, Secretary
  • -Metallurgical Processing Inc
  • Louis Tseng, Asia Sector Rep
  • -Aerospace Industrial Development
  • Corporation (AIDC)

Currently one open position Europe Sector Rep
66
SSC Activities
  • Supplier survey next one is April 2007
  • Communiqué Flyer - newsletter to Nadcap
    participants
  • SSC Metrics
  • Mentoring program
  • The SSC needs volunteers to serve on teams and
    participate in all activities to ensure the
    supplier voice is heard.

67
SSC Conclusion
  • The SSC is one of the best ways that suppliers
    can influence the Nadcap process
  • Get involved!
  • See any SSC Leadership Team member if you want to
    help.

68
Nadcap Meeting Information
  • Available at www.pri-network.org
  • Minutes Agendas
  • Keep up with Task Group activities
  • Participate in Task Group decisions
  • Plan to attend Open Meeting Suppliers are
    always welcome
  • Attend the Supplier Support Committee (SSC)
    meeting
  • Get involved Join the SSC!

69
Slide 69
Nadcap Meeting Information
70
Slide 70
Obtain Agendas and Registration for Upcoming
meetings
71
Important Meetings
  • Supplier Support Committee Meeting
  • Your participation is needed!
  • Today January 23, 2007
  • 500pm-630pm
  • eAuditNet Training for Suppliers
  • Today, following this session in this room
  • 1000am-1100am

72
Upcoming Nadcap Meetings
  • April 23-27, 2007
  • Newport Bay Club
  • Disneyland Resort Paris
  • Marne-la-Vallee, 77777
  • France
  • Phone 33 1 60 45 55 00
  • Rate 139 Euro Single
  • Reservation deadline March 30, 2007
  • July 16-20, 2007 Istanbul, Turkey
  • Additional details in Attendees Guide

73
Our Web Addresses
  • www.pri-network.org
  • www.eauditnet.com

74
Questions?
  • Any Questions?
Write a Comment
User Comments (0)
About PowerShow.com