GPS Orbits - PowerPoint PPT Presentation

About This Presentation
Title:

GPS Orbits

Description:

Holiday Inn. 8777 Georgia Avenue. Improvements to Orbit Processing in 2004/2005 ... Step 1: Daily Global Solution orbits, EOPs, IGS and some CORS site positions; ... – PowerPoint PPT presentation

Number of Views:82
Avg rating:3.0/5.0
Slides: 11
Provided by: gpo89
Learn more at: https://www.ngs.noaa.gov
Category:
Tags: gps | orbits

less

Transcript and Presenter's Notes

Title: GPS Orbits


1
GPS Orbits
  • Jim Rohde, Bob Dulaney, Bill Kass, Steve Hilla
  • National Geodetic Survey 2005 Convocation
  • October 24-28, 2005
  • Silver Spring, Maryland
  • Holiday Inn
  • 8777 Georgia Avenue

2
Improvements to Orbit Processing in 2004/2005
  • Stars Procedure Added redundant baselines by
    processing sub-networks and combining their
    normal equations
  • Integer phase ambiguity fixing
  • Moved production from HP to SUN x86 platform
  • Orbit adjustment done more rigorously (ADJEPH)
  • Fixed pole tide sign error
  • Improved sub-daily EOP model
  • Absolute Antenna Phase Center Offsets and PCVs
  • Monuments as Reference Points (future)
  • Updated Ocean Tide Loading Model (future)

3
(No Transcript)
4
(No Transcript)
5
Multiyear CORS
  • Motivation
  • To provide long-term consistent solution of all
    data
  • Results used for CORS coordinates and velocities
    realization of NSRS
  • Implement recent improvements in GPS Data
    Processing
  • Time Span 1994 through 2005
  • Reference Frame IGb00 IGS realization of ITRF00

6
Multiyear CORS (cont.)
  • Procedure
  • Streamline processing to fit with routine
    operations and avoid repeated reprocessing
  • Step 1 Daily Global Solution orbits, EOPs, IGS
    and some CORS site positions solutions stacked
    weekly for the IGS
  • Step 2 Daily CORS Solution CORS and some North
    American IGS site positions solutions stacked
    weekly for NAREF
  • Step 3 Daily Multiyear Solution combination of
    all normal equations for orbits, EOPs, and all
    IGS and CORS site positions

7
Multiyear CORS (cont.)
  • Step 4 Weekly Multiyear Solution Stack 7 daily
    multiyear solutions and archive results
  • Step 5 Full Multiyear solution Stack all weeks
    together to solve for site velocities
  • Schedule Begin processing January 2006,
    complete in 3-6 months

8
(No Transcript)