Title: PACKUPPEB, PHASE KIT MANAGEMENT
1PACK-UP/PEB, PHASE KIT MANAGEMENT
- Enabling Objectives
- 2.60 DESCRIBE PACK-UP/PEB, PHASE KIT MANAGEMENT
2PACK-UP/PEB, PHASE KIT MANAGEMENT
- The Pre-expended Bin Unit (ASD sites only) is
responsible for establishing and maintaining the
inventories of consumable pre-expended bins (PEB)
and consumable packups. These PEBs and packups
and their inventories are maintained in Optimized
IMA.
3PACK-UP/PEB, PHASE KIT MANAGEMENT
4PACK-UP/PEB, PHASE KIT MANAGEMENT
- Purpose
- Transfers an RFI asset from the Supply
Officer to a specific ORG for detachment
purposes. - System Action
- Generates an X24C Doc Id from RSUPPLY to
NALCOMIS. - Decrements RFI quantity
- Increments Pack up Deployed
5PACK-UP/PEB, PHASE KIT MANAGEMENT
6PACK-UP MANAGEMENT
- Packup Processing is now done using RSUPPLY.
This is known as a Support Package. This is
primarily done at ASD sites to support squadron
detachments where supply support is almost
non-existent such as Fallon Nevada. In some
cases, such as support for a C2 (COD)
detachments, support packages can be created at
shipboard sites as well. While the functionality
still exists to some extent in NALCOMIS, it is
for local purposes only.
7(No Transcript)
8(No Transcript)
9PACK-UP MANAGEMENT
- Support Package processing is taught in depth in
The RSUP Force Level (NEC 2828) class.
10PEB (Pre-Ex Bin Management)
11PEB (Pre-Ex Bin Management)
- Pre Expendable Bins are maintained at ASD sites
to provide high usage low cost consumables, such
as washers, o-rings, cotter pins, etc. - MSP storerooms are used vice Pre Expendable Bins
on board ship to fill requests for this material.
- This area of NALCOMIS IMA is only used by ASD
sites.
12(No Transcript)
13(No Transcript)
14(No Transcript)
15Click save
16This indicator must be checked or NALCOMIS will
generate error message during validation
17Phase Kit Management
18Phase Kit Management
- Phase kits contain inventories of consumable bit
and piece parts that are needed to perform
specific maintenance functions. By creating kits
of bit/pieces, maintenance personnel can request
the kit to perform their function, instead of
requesting each part separately.
19Phase Kit Management
- A phase kit is made up of a master phase kit and
its inventory. The master phase kit is the
"container" LICN that the inventories are
assembled under. Inventories are the related bits
and pieces that are assembled for the specific
function or functions that the kit will support. - Phase kits must first be established in the
system before managing and issuing
20Phase Kit Management
- Phase inspections are performed on Aircraft based
on flight hours. - These Kits are pre-assembled in S6 or ASD to
prevent requisitioning of multiple consumable
items during the phase inspection. - Once the items are identified, they are placed
usually in paper bags and annotated with the LICN
of the kit and the individual NIINS of the
consumables that are in the bag. - When a squadron requires the kit to complete a
phase inspection they requisition the kit using
the LICN of the kit.
21Phase Kit Management
- The master phase kit LICN must be flagged as a
phase kit and the supply products indicator (SPI)
must NOT be set on the NIIN record.
22If the stock number is a master phase kit or if
it is an inventory item or a bit/piece part for a
phase kit, select the Phase Kit check box.
23(No Transcript)
24(No Transcript)
25(No Transcript)
26Click yes if you want to add items for the phase
kit at that time. You can also add them later.
27(No Transcript)
28After entering all applicable data, click apply.
29You can add another record or do it another time.
30Phase Kit Management
31(No Transcript)
32(No Transcript)
33Phase Kit Management
34Phase Kit Management
- As Phase kits are issued and on hand qty
decreases, Master Phase kits can be replenished,
thus requisitioning the bits and pieces that are
required for the Master Phase kits.
35Notice that the due quantity is 0 and there is no
O/H quantity
At this point the Replenish button can be
accessed and is used to replenish items for phase
kits
36Phase Kit Management
- Once the replenish button is pressed it places
the request in the batch job que for release. - Once released it auto assigns a DDSN to each of
the bit piece parts required for the phase kits.
37(No Transcript)
38(No Transcript)
39(No Transcript)
40Notice that the Due quantity has been incremented
This button will allow an even more in-depth
review of items that are due
41(No Transcript)
42(No Transcript)
43Phase Kit Management
- Individual Bit Piece parts can also be viewed
with the Bit Piece function. - This area will only populate when there are bit
piece parts on order
44(No Transcript)
45(No Transcript)
46(No Transcript)
47(No Transcript)
48REVIEW AND SUMMARY
- DESCRIBED PACK-UP MANAGEMENT
49ANY QUESTIONS ???