City of Fort Worth Facility Master Plan

1 / 50
About This Presentation
Title:

City of Fort Worth Facility Master Plan

Description:

Post Office - Impact of using USPS facility. New Construction - Consolidated City Hall ... Conceptual Fit Study at USPS Building ... – PowerPoint PPT presentation

Number of Views:154
Avg rating:3.0/5.0
Slides: 51
Provided by: nixo

less

Transcript and Presenter's Notes

Title: City of Fort Worth Facility Master Plan


1
City of Fort WorthFacility Master Plan
  • In Progress Report

2
Project Overview
  • Phase I Studies
  • High-level, City-wide Assessment
  • Fire Police Training Detailed Facility Program
  • Police Administration Detailed Facility Program
  • City Hall and Related Planning
  • Phase II Studies
  • Detailed Needs Assessments

3
Project Overview
  • Phase I Studies
  • High-level, City-wide Assessment
  • Department Head Interviews Completed
  • Prioritization Tool (Jan-Mar 07)
  • Documentation (Mar-May 07)

4
Project Overview
  • Phase I Studies
  • Fire Police Training Detailed Facility Program
  • Draft facility programs Complete
  • Review drafts with users (Jan-Mar 07)
  • Documentation / Final (Mar-May 07)
  • Police Administration Detailed Facility Program
  • Draft facility programs Complete
  • Review drafts with users (Jan-Mar 07)
  • Documentation / Final (Mar-May 07)

5
Needs Assessment for City Hall
6
Critical Issues
  • Ad hoc / inefficient growth
  • Scattered / inefficient operations
  • Over-utilized facilities
  • Poor general access to City Hall
  • Lack of architectural presence
  • Rapid growth to continue

7
Evaluation Criteria
  • Operational efficiency
  • Customer friendly facilities
  • Consolidate all functions in a single complex
  • Parking availability
  • Accessibility to public transportation
  • Cost
  • Located within walkable downtown
  • Vehicular accessibility
  • Economic and community development
  • Sustainability
  • Iconic architecture
  • Community gathering place

8
Logical Occupants for Operational Efficiency
  • Primarily office-based
  • Adjacencies needs

9
Logical Occupants for Operational Efficiency
  • Primarily office-based
  • Adjacencies needs
  • Economies of scale by centralizing
  • Convenience for citizens
  • Convenience for internal customers
  • Does not rule out decentralization for enhanced
    customer service

10
Baseline
  • Assess cost to accommodate all City functions
    that should (based on operational efficiency)
    operate from a City Hall (single or multiple
    buildings)
  • If multiple buildings, all functions should be
    located within walking distance from each other
  • Decentralize as indicated by ongoing analysis

11
Logical Occupants for Operational Efficiency
Existing Staff 1,344 Data derived from interv
iews with Department Heads and information from
HR Existing usable square footage 314,000 Ex
isting parking 1,243 spaces
12
Logical Occupants for Operational Efficiency
Existing Staff 1,344 Data derived from interv
iews with Department Heads and information from
HR Existing usable square footage 314,000 Ex
isting parking 1,243 spaces Future Staffing thr
ough 2017 1,610 Forecasting methods from Depart
ment Head surveys vary between groups. Methods
include specific requests for staff, reflections
of City growth, changing operations as well as
other parameters Usable Square Feet 430,000
Parking Requirement 1,500 spaces
13
Alternatives
  • Current Practice Case-by-case basis
  • Additions Renovations - Upgrading City Hall
  • Post Office - Impact of using USPS facility
  • New Construction - Consolidated City Hall

14
Alternatives
  • Option A Current Practice
  • Lease space as City functions grow
  • Continue to occupy all present City-owned
    buildings and parking lots
  • Continue to lease all present buildings and
    parking lots
  • Currently lease 60,000 USF/234 parking spaces at
    933,142 / year
  • No new construction
  • Lease additional 116,000 USF/260 parking spaces
    at additional
  • 2.5M / year

15
Alternatives
  • Option B Additions Renovations
  • Maximize use of downtown city assets
  • Continue to occupy all present City-owned
    buildings and parking lots
  • Continue to lease all third party parking lots
  • Enclose City Halls ground level walkways
  • 13,500 USF

16
Exterior Walkways - City Hall
17
Alternatives
  • Option B Additions Renovations
  • Maximize use of downtown City assets
  • Continue to occupy all present City-owned
    buildings and parking lots
  • Continue to lease all third party parking lots
  • Enclose City Halls ground level walkways
  • Fill in City Hall atrium
  • 24,500 USF

18
Atrium - City Hall
19
Alternatives
  • Option B Additions Renovations
  • Conceptual Construction Budget
  • Atrium Infill Existing Building 4 - 5
    Million
  • 24,500 USF
  • Resulting Renovation Requirements 38 - 44
    Million
  • Complete redo of HVAC / electrical system
  • Building code updates
  • Move Out / Leasing Costs 6 - 6.5 Million
  • Total Cost Range Atrium Infill 48 - 55.5
    Million
  • Atrium infill not recommended

20
Alternatives
  • Option B Additions Renovations
  • Maximize use of downtown City assets
  • Continue to occupy all present City-owned
    buildings and parking lots
  • Continue to lease all third party parking lots
  • Enclose City Halls ground level walkways
  • Purchase TCCD May Owen Building
  • 37,900 USF

21
TCCD May Owen Center
Omni Hotel
Water Gardens
May Owen
Houston Street
Lancaster Avenue
T P Building
USPS Bldg
22
Alternatives
  • Option B Additions Renovations
  • Maximize use of downtown City assets
  • Continue to occupy all present City-owned
    buildings and parking lots
  • Continue to lease all third party parking lots
  • Enclose City Halls ground level walkways
  • Purchase May Owen Building
  • 37,900 USF
  • Construct new 2-story South Annex above existing
    parking lot
  • 34,000 USF

23
(No Transcript)
24
South Annex Site Plan
MONROE ST.
TEXAS ST.
WEST TENTH ST.
CITY HALL
WEST THIRTEENTH ST.
JENNINGS ST.
Usable Square Feet 34,000 elevated 2-story
with ground level parking
25
Alternatives
  • Option B Additions Renovations
  • Maximize use of downtown City assets
  • Continue to occupy all present City-owned
    buildings and parking lots
  • Continue to lease all third party parking lots
  • Enclose City Halls ground level walkways
  • Purchase May Owen Building
  • Construct new 2-story South Annex above existing
    parking lot
  • Lease 90,000 USF/315 parking spaces at a cost of
    2.1M / year

26
Alternatives
  • Option C Post Office
  • Renovate Post Office and maintain existing
    downtown City assets
  • Lancaster USPS and Commissary buildings
  • Construct USPS 500 space Parking Garage

27
U.S. Post Office
28
U.S. Post Office - Commissary
29
U.S. Post Office Site Plan
30
Commissary Building
Post Office
Lancaster Ave.
City of Fort Worth Conceptual Fit Study at USPS B
uilding Planning for approximately 143,100 USF in
USPS Building and 23,900 USF in Commissary
Building
31
Internal Audit
MWBE
Building Support
Council Chambers Above
Cafe
OAU
Planning
Finance
Lancaster Ave.
USPS Building Ground Floor Planning for approxim
ately 41,400 USF
32
Council Chambers
Housing
Pre-Council Chambers
Budget Management Services
Economic Development
Historic Lobby
Community Relations
Community Relations
Lancaster Ave.
USPS Building First Floor Planning for approxima
tely 40,500 USF
33
Historic Lobby
34
Law
City Secretary
Mayor and City Council
City Managers Office
Lancaster Ave.
USPS Building Second Floor Planning for approxim
ately 41,300 USF
35
Emergency Management Office
Lancaster Ave.
USPS Building Third Floor Planning for approxima
tely 13,500 USF
36
Lancaster Ave.
Reprographics
Records Info
Records Info File Storage
Records Info - Archives
Commissary Building Ground and First Floor Plann
ing for 13,500 USF on Ground Floor and 10,400 USF
on First Floor (Excludes space not owned.)
37
Alternatives
  • Option C Post Office
  • Renovate Post Office and maintain existing
    downtown City assets
  • Lancaster USPS and Commissary buildings
  • Construct USPS 500 space Parking Garage
  • Continue to operate City Hall, City Hall Annex,
    Zipper Building
  • Enclose walkways on City Hall
  • No leased office space or leased parking lots
    downtown

38
Alternatives
  • Option D New Construction
  • Construct new facility to house all City Hall
    candidates
  • Construct new 430,000 USF single facility or
    complex
  • Construct 1,500 space parking garage associated
    with new City Hall

39
Existing Fire and Police Training SitePotential
New City Hall Site
40
Existing Fire and Police Training SitePotential
New City Hall Site
41
Alternatives
  • Option D New Construction
  • Construct new facility to house all City Hall
    candidates
  • Construct new 430,000 USF single facility or
    complex
  • Construct 1,500 space parking garage associated
    with new City Hall
  • Sell existing downtown City assets
  • Lease out downtown parking spaces at new
    Convention Center Parking Garage
  • No leased parking or office space downtown

42
Evaluation Criteria
  • Operational efficiency
  • Customer friendly facilities
  • Consolidate all functions in a single complex
  • Parking availability
  • Accessibility to public transportation
  • Cost
  • Located within walkable downtown
  • Vehicular accessibility
  • Economic and community development
  • Sustainability
  • Iconic architecture
  • Community gathering place

43
Cost Comparison Assumptions
  • Financing rate 4.5
  • Amortization period 30 years
  • Discount rate 4.5
  • Analysis period 30 years
  • Net present value of 30 year cash flow

44
Net Present Value Factors
  • Operational costs
  • Lease
  • Renovation
  • Construction
  • Moving
  • Swing Space Rent
  • Income from Sale
  • Debt Service of Capital
  • Security
  • Janitorial
  • Annual Deferred Maintenance
  • Significant Capital Expenses

45
Comparison of Alternatives
A. Current Practice
B. Additions Renovations
  • Post Office
  • downtown City assets

D. New Construction
46
Comparison of Alternatives
A. Current Practice
B. Additions Renovations
  • Post Office
  • downtown City assets

D. New Construction
47
Evaluation Criteria
  • Operational efficiency
  • Customer friendly facilities
  • Consolidate all functions in a single complex
  • Parking availability
  • Accessibility to public transportation
  • Cost
  • Located within walkable downtown
  • Vehicular accessibility
  • Economic and community development
  • Sustainability
  • Iconic architecture
  • Community gathering place

48
Q
Is the Post Office Building a viable option for
City Hall?
49
Q
Is the Post Office Building a viable option for
City Hall?
50
Thank You
Write a Comment
User Comments (0)