Score Card evaluates which rule is best 'Multi-level work order scheduling' Reports Generated ... Day 3 Custom Menus and Database ... Score Cards Reports ... – PowerPoint PPT presentation

Number of Views:43
Avg rating:3.0/5.0
Slides: 22
Provided by: speci5
Category:
Tags: inc | jobtime | systems

less

Transcript and Presenter's Notes

Title: JobTime Systems, INC


1
JobTime Systems, INC
  • Nathan Knueven - knueven.16_at_osu.edu
  • Ben Flaata flaata.1_at_osu.edu
  • Shane Breuninger - breuninger.1_at_osu.edu
  • Boon Guek Tan - tan.142_at_osu.edu
  • Mae Osman - osman.19_at_osu.edu

2
JobTime Implementations
  • (Discrete, Repetitive, Make to Order)

3
  • Scheduled Maintenance
  • Limited spare parts investments
  • Assembly of fuel requirement components to assure
    on time delivery
  • Verified purchase policy plan
  • Timing of purchasing
  • Properly model processes
  • Show where to balance the load to promote flow

4
Schering-Plough Personal Care
  • Labor leveling
  • Control peaking of labor
  • Project Management capabilities
  • Job Shop Scheduling
  • Fabrication Scheduling

5
General Features
  • Gantt Charts
  • Can be interfaced with existing systems or ran
    stand-alone
  • Supply Chain
  • Customer forecasts
  • Over 50 industry standard reports

6
Scheduling Proxies Invoked by Jobtime
  • Critical ratio
  • Minimum slack time
  • Minimum slack time per operation
  • Earliest due date
  • Shortest process time SPT
  • Least work remaining
  • First in - first out
  • Management priority
  • Any of the above combined with management
    priority
  • Unlimited user defined priority or optimization
    rules 

7
What-if Scenarios
  • Powerful scheduling what-ifs to make comparisons
  • Up to 160 scenarios can be saved
  • Score Card evaluates which rule is best
  • Multi-level work order scheduling

8
Reports Generated
  • Work Centers
  • Orders
  • Routings
  • To-Do List Detailed Schedules
  • Schedule Scores Report
  • WC Backlog Demand 
  • Orders On-Time and Late
  • WC Bottleneck Queue Hours
  • Capacity Requirements
  • Capacity Utilization Over Time  

9
Training Program
  • Day 1 - Schedule Training Seminars
  • Addresses the benefits Finite Capacity Scheduling
  • Day 2 Introduction to Modeling
  • Intro. to JobTime, features and workshops
  • Day 3 Custom Menus and Database
  • Integration with other sources, menu and database
    customization
  • Day 4 - Rules and Advanced Modeling
  • Dispatching rules, creating setup-matching rules

10
Flexibility
  • JobTime is a strong mixed-mode scheduling
    system, because it is also used extensively in 
    job-shops, engineer-to-order and assemble to
    order shops.
  • - JobTime Website
  • Can be incorporated into work into a high mix-low
    volume company.

11
Constraint Handling
  • Deals with multiple constraints
  • Equipment
  • Tools
  • Labor
  • Supplies
  • Floor Space
  • Accounts for Setup times
  • Fixed
  • Variable

12
Accurate Shop Conditions
  • Allows alternate routes
  • Allows for what-ifs to elevate bottlenecks.
  • Recognizes the use of multiple resoures
  • Will seize and hold if resource not available
  • Recognizes fixed as well as quantity dependent
    variable process times

13
Scheduling Capabilities
  • Customize up to 4 shifts
  • Programmed shift patterns
  • Every workstation has its own calendar, setup,
    and efficiency

14
Product Routing and Sequencing
  • Routings
  • Defined by operations
  • Single or multiple routings for each part can be
    generated
  • Work orders can be generated from routings
  • Scheduling
  • JobTime can consider
  • Preferred workstations
  • Resource constraints Seize and release
  • Designed to minimize setup

15
Forecasting
  • Recognizes trends and seasonality for
    manufacturers with standard products
  • Makes recommendations in future part purchases
  • Considers
  • Inventory
  • Open purchase and work orders
  • Order quantities
  • Safety stock

16
Time Planning
  • Unique independent calendar per work station
  • Overlapping between work orders
  • Best match in queue
  • Wait for inbound setup
  • First and last time constraint define the
    earliest and latest time of day of operation

17
Time - Visual
  • Visual scheduling at ease
  • Reliable scheduling for precision finite
    scheduling
  • Interactive and user friendly

18
Capacity
  • Capacity unit of measure
  • Capacity consumption
  • Variable resources per shift over time
  • User-definable capacity rate

19
Explicit Assembly Constraints
  • Offers a finite Scheduling feature that schedules
    the work orders in correct sequence
  • Schedule should not show an assembly to start
    prior until all subassembly work orders are
    completed
  • Saves hundreds of hours of manual checking and
    rescheduling effort.

20
Production Costing
  • Reflects costs down to individual operations
  • Each work order can reflect a unique production
    cost that can expresses special handling or
    processing in any operation step.
  • Supports cost engineering by providing values
    down to the operation level for
  • Budget
  • Actual
  • Earned value

21
Score Cards Reports
  • Measures of performance are calculated after each
    schedule and retained in a special score card
    file.
  • Measures
  • Make Span
  • of Jobs Late
  • Avg. Days Early/Late
  • Max. Days Late
  • Capacity Utilization
  • Jobs on Time